Sat May 14 03:14:00 2022, PP, Shift Checks 8x
|
4:13
AIDA stats OK
Leakage current OK |
Sat May 14 01:52:03 2022, ML, 2h-Shift Checks    
|
AIDA stats ok
Leakage current ok
Temperatires ok |
Fri May 13 23:37:59 2022, ML, 2h-Shift Checks   
|
Took over remotely from CB about an hour ago
At 0h40 (CET):
Stats still ok - attach 1
Leakage still OK - Attach 2
Temps
- attach 3
Grafana OK
UCESB rates ok - attach 5
System-wide checks: aida09 fails clock (1), aida02 06 09 10 13 fail ADC calibration,
all pass WR |
Fri May 13 15:00:23 2022, CB, 13 March - 16:00-24:00 shift 10x
|
16:00 Took over remotely from OH, TD who remain in GSI
Stats OK - attach 1
|
Fri May 13 07:36:18 2022, OH, TD, Friday 13 May 35x
|
08:36 DAQ Still running smoothly
Currently on run R1_328
At current data rates we have just over 4 days of space left on the current disk
|
Thu May 12 22:49:39 2022, BA, MA, Low Rates
|
The rate is very low in all aida, not sure . |
Fri May 13 06:56:14 2022, OH, BA, MA, Low Rates
|
Quote:
The rate is very low in all aida, not sure . |
Fri May 13 06:47:33 2022, ML, 2h-Shift Checks  
|
It has been a quiet night. AIDA has been stable.
Stats appears stable appear
Temperature also stable |
Fri May 13 04:45:23 2022, ML, 2h-Shift Checks  
|
AIDA is running ok. Note that, in the last hour or so, the rate of implant in DSSD1 is back to higher rate ~10 Hzto 15 Hz as at the beginning of this
shift.
Stats seems ok |
Fri May 13 02:56:36 2022, ML, 2h-Shift Checks  
|
All seemnormal on AIDA side.
Stats as before
Temperatures stable |
Fri May 13 02:28:36 2022, ML, beam dropped
|
We see less counts in AIDA implant DSSD1 (~1Hz) than at the beginning of the night shift (~10Hz).
This seems to be beam related as the count rates in DESPEC & FRS Scalers seems to have dropped too. |
Fri May 13 00:50:16 2022, ML, 2h-Shift Checks  
|
All seems ok (apart for my virgin network connection usually quite reliable but not so tonight !?!).
Statistics seems ok.
Temperatures appears stable |
Thu May 12 21:43:49 2022, BA, MA, Rates  
|
Statistic check (screenshot attached).
Temperatures OK (screenshot attached). |
Thu May 12 16:30:47 2022, NH, OH, TD, Notes for mounting a second switch
|
Update DHCPD as expected
Make sure new ethernet device is trusted in firewall
Make sure hosts is updated
|
Thu May 12 10:10:51 2022, TD, OH, AIDA data throughput 15x
|
Attachment 1 - top aida06
|
Thu May 12 07:09:43 2022, TD, Thursday 12 May 08:00-24:00 27x
|
08.10 AIDA DAQ status
|
Thu May 12 00:37:52 2022, OH, AM, Thursday 12 May 13x
|
01:37 Over the past hour the degrader settings have been checked by impinging 209Pb onto the detectors.
That is now complete.
Will find optimum thresholds for n+n side and then leave DAQ running with n+n at optimum and p+n at 0xc
|
Wed May 11 19:08:41 2022, CB, PP, Wednesday 11th May - evening shift   
|
20:19 no beam yet.
Statistic check (screenshot attached).
Temperatures OK (screenshot attached). |
Wed May 11 07:04:13 2022, OH, NH, TD, Wednesday 11th May 9x
|
08:00 Overnight at some point it appears that aida14 has stopped producing any ASIC data
It is currently sending data pause requests and data push requests but nothing else - attachment 1
telnet into aida14 and run top to see what the current state of the FEE is. AIDAExec currently using 0% CPU usage.
|
Tue May 10 07:41:28 2022, NH TD, Tuesday 10 May 29x
|
8:15am S4 CONTROLLED ACCESS to remove beam plug and check bPlas/AIDA response to beam
Reseat aida05 ribbon cable on adapter board while in...
|
Mon May 9 08:36:23 2022, TD, NH, Monday 9 May 31x
|
09.32 Re-start AIDA
|