AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 17 of 35  ELOG logo
  ID Date Authordown Subject Text Attachments
  295   Tue May 4 21:26:43 2021 OHAlpha run22:26 Tape server set up to write to directory
May21
      DAQ stopped
 10x 
  297   Wed May 5 20:10:16 2021 OHWednesday 5 May Alpha run21:10 After all of the works in S4 today the
noise in the system was considerably worse
      It was decided that before starting
 12x 
  305   Tue May 11 07:21:24 2021 OHTuesday 11 May08:20 System wide checks all ok except
 Base  Current  Difference
aida01 fault   0xc10c :   0xc10e :   2  
 210511_0823_Stats.png210511_0824_Temp.png210511_0825_Bias.png 
  315   Thu May 13 23:58:05 2021 OHFriday 14th May 00:00 - 08:0000:00 OH Takes over.
 PULSER SETTINGS
---------------------------
 21x 
  327   Wed May 19 06:59:33 2021 OHWednesday 19th May 08:00 - 16:0008:00 OH Takes over for CA
      Thresholds 0xc for p+n and 0x19 for
n+n ASICs 1-3 and 0x64 for n+nASIC4
 9x 
  337   Thu May 20 14:56:33 2021 OHThursday 20th May 16:00 - 24:0016:00 p+n threshold 0xc (120keV)
      n+n threshold DSSD2 0x20 (250keV) ASICS
1-3, 0x64 ASIC4
 10x 
  380   Fri Sep 3 13:39:42 2021 OHAdditional noise tests performed at GSIContents of an email from NH to OH and TD
about tests performed on an additional bias
supply:
 DSO_Lab_NoP.jpgDSO_Lab_1.jpgDSO_Lab_50V.jpgDSO_Lab_NoCable.jpg 
  381   Mon Oct 18 13:01:04 2021 OHProxy configProxy for firefox and anydesk  proxy.pngproxy2.png 
  382   Mon Oct 18 13:03:23 2021 OHDHCPd.conf backup   dhcpd.conf 
  383   Mon Oct 18 14:20:32 2021 OHTop bar launcherslauncher1
TclHttpd @8015 for AIDA
/MIDAS/Linux/startup/HTTPD
  
  384   Tue Oct 19 16:17:49 2021 OHAIDA-gsi server to centos 7 Following advice of CU have updated the server
to centos 7.
  
  386   Thu Oct 21 09:08:41 2021 OHMIDAS start up messages   8015Startup.txt8115startuptapestart.txtmergerstart.txtdatarelay.txt 
  387   Thu Oct 21 09:33:08 2021 OHNoise tests - 21st Oct 2021Pulser was left on overnight with the bias
filters on
First plot is FEE14 not FEE8
 211021_0951_fee8_x8L.png211021_0953_fee14waveform_zoom.png211021_0956_fee14_waveform.png211021_0957_fee8_x8L.png211021_0959_fee8_waveform_zoom.png 
  388   Thu Oct 21 16:18:51 2021 OHFEE and Adaptor board groundingsDuring investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor
  
  391   Fri Oct 29 10:49:01 2021 OHNoise tests - 28th October -29th OctoberPlan for the day was to connect a mechanical
ground to the FEEs connected to DSSD0 1,
2, 3, 4, 9, 10, 11 and 12
 24x 
  398   Wed Mar 2 09:08:44 2022 OHDAQ Status 2nd March 2022DAQ was found yesterday with none of the FEEs
reporting any good events on any FEE - attachment
1
 220302_1002_goodevents.png220302_1002_white_rabbit.png220302_1003_merger.png220302_1003_merger_data_buffers.png220302_1004_merger_merge_time_errors.png 
  399   Wed Mar 2 10:05:13 2022 OHDAQ Status 2nd March 2022> DAQ was found yesterday with none of the
FEEs reporting any good events on any FEE
- attachment 1
  
  417   Mon May 2 09:52:20 2022 OHShifter checklist 2022Every 30 minutes:

- Reload statistics (Web browser tab screen
  
  456   Sun May 15 07:40:52 2022 OHSunday 15th May 08:00-16:0008:40 FEE Temperatures ok - attachment 1
      FEE statistics - Attachment 2
      Bias and leakage currents ok - attachment
 10x 
  464   Tue May 17 06:58:51 2022 OHTuesday 17th May08:00 Still have beam for the time being.
      Currently on file R4_2049
 6x 
ELOG V3.1.4-unknown