ID |
Date |
Author |
Subject |
Text |
 |
718
|
Thu Jul 24 15:50:01 2025 |
CC, MP, NK | Check of BB7 impact | HT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both |
   |
717
|
Thu Jul 24 13:36:34 2025 |
CC, MP, NK | AIDA05 connected and disconnected compared to AIDA09 | HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN |
10x |
716
|
Thu Jul 24 10:28:04 2025 |
CC, NK, MP | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
715
|
Wed Jul 23 17:02:22 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
714
|
Wed Jul 23 15:56:00 2025 |
CC, MP, NK | Test of AIDA05 with new bias module | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 101 V with shielded cables. BB7
is still connected but not biased (same configuration |
|
713
|
Wed Jul 23 15:04:26 2025 |
CC, MP, NK | Test of AIDA05 with BB7 connected to Mesytec but not biased | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
after the DEGAS platform has been closed, |
|
712
|
Wed Jul 23 13:59:37 2025 |
CC, NK | Shielding of the snout | Attachment1: AIDA05.1.8L when AIDA05 connected,
biased at 100 V with not-shielded cables,
CAEN HT, after the base of the |
|
711
|
Wed Jul 23 13:08:30 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 | Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT
Attachment 1: AIDA05.1.8L --> |
    |
710
|
Wed Jul 23 09:37:34 2025 |
CC, NK | Comparison pulser FWHM with/without HT and detector cables | This elog is the first reliable.
Before, the histograms have not been zero'd
Each test are done and compared |
9x |
709
|
Tue Jul 22 18:00:45 2025 |
CC, NK, MP | FWHM aida FEE | AIDA05 completely disconnected, all the
others FEEs64 are fully connected
Attachment 1: aida05, FWHM= 95 |
 |
708
|
Tue Jul 22 17:00:26 2025 |
MP, CC | Status | Test with shielded HV cables for both detectors.
The FWHM for ch1 is now 184 ch.
Yesterday cables for cards 5, 6, |
 |
707
|
Mon Jul 21 13:01:19 2025 |
MP | Status | Status before grounding checks |
 |
706
|
Sun Jun 15 10:53:08 2025 |
TD | Sunday 15 June 2025 |
11.45 DSSSD bias & leakage current - attachment
1
|
41x |
705
|
Sat Jun 14 11:20:45 2025 |
TD | Saturday 14 June 2025 |
12.21 BNC PB-5 settings
Amplitude 1.0V
|
30x |
704
|
Fri Jun 13 12:42:39 2025 |
CC, TD | Friday 13 June 2025 |
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
10x |
703
|
Thu Jun 12 13:15:25 2025 |
GB, CC, NK, MP, TD | Thursday 12 June 2025 |
EMC tests with NK (Orsay)
|
 |
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting |
 |
701
|
Tue Mar 11 11:53:18 2025 |
TD | Monday 10 March |
18.30 AIDA powered up for brief test
|
11x |
700
|
Sat Feb 22 12:35:38 2025 |
TD | Offline analysis data files R9_85-R9_199 (84Mo setting) |
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
|
22x |
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
|
|