Entry  Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png
DSSD Snout was reassembled to install the second bPlast (downstream) 
 (fig 1)
Entry  Wed Mar 9 10:15:56 2022, NH TD, Wednesday 9 March - noise tests contd. 38x
11.15 - S4 is currently closed no access

If access possible (should be) plan is
Entry  Tue May 10 07:41:28 2022, NH TD, Tuesday 10 May 29x
8:15am S4 CONTROLLED ACCESS to remove beam plug and check bPlas/AIDA response to beam

Reseat aida05 ribbon cable on adapter board while in...
    Reply  Tue Nov 5 10:02:45 2019, NH PJCS, Report: aida10 database corruption 
This looks like the Options not the ASIC data. That will be in the CONTENTS file of the FEE64 named directory within the dated EXPERIMENT directory.
Looks like the latest is at /MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23/aida10 ?

A quick look at this file and it looks normal , not all 0xad ? 
    Reply  Tue Nov 5 10:32:21 2019, NH PJCS, Report: aida10 database corruption 
Hi, see the attached files in the original comment. I think the BACKUPCorrupt is quite old now.

The Options data gets corrupted and for example the ASIC folder gets set to 'undefined' which I think is why the ASIC data loads incorrectly.

 
    Reply  Tue Nov 5 11:15:41 2019, NH PJCS, Report: aida10 database corruption 
If ypou now check the actual values in the aida10 Options screen are the correct ?

It can happen that corruptions once loaded are propagated when Options are generally saved. 

Looking at the dates the files were modified does that make sense to you. It doesn't look as if the corrupted database was changed except
Entry  Thu Oct 31 16:43:03 2019, NH CA TD, Merger & MBS Performance MergerStats.pngMBSRates.pngMergernetworking.pngMergerStatistics.png
Testing merger with 3 DSSDs connected, with thresholds of 10 (slow comparator), 2 (HEC) and 255 (fast discriminator)

Merger handling rate of 1.6 million events per second comfortably. Forwarding to MBS fine.
Entry  Fri Jan 25 12:26:17 2019, NH, Raspberry Pi Startup & Information 
Two raspberry pis:

nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN HV
Entry  Fri Jan 25 12:33:03 2019, NH, aida-gsi Access 
If you have a GSI account it should be possible to connect to aida-gsi remotely via the following
SSH into lx-pool.gsi.de with GSI Linux username/password (ssh username@lx-pool.gsi.de)
Then SSH into aida-gsi via ssh npg@aida-3
Entry  Wed Mar 20 15:35:10 2019, NH, AIDA Setup @ GSI 
Currently

- 1 DSSD and Plastic is in the AIDA snout, which is not mounted

- The FEEs are offline due to a water supply issue, this will be repaired early 21/03/2019
Entry  Thu Mar 21 13:59:08 2019, NH, AIDA Water 
The AIDA water system has been repaired and not leaking.

The interlock did not light immediately, but power cable reconnected to box and now it works.

 
Entry  Thu Mar 21 14:10:10 2019, NH, FEE Temperatures FEETemps.png
All 12 FEEs powered up, and temperatures are OK.

Passed ASIC checks and system wide checks - now checking cabling and to mount snout.
Entry  Fri Mar 22 13:32:55 2019, NH, AIDA Startup @ 22.03.2019 20190323Bias.png20190322FEETemps.png
FEEs have been on this morning, temperatures attached

Leakage current attached

the DSSD is attached to the following AIDA modules:
Entry  Fri Mar 22 13:47:32 2019, NH, Resolution Checks 20190322Resolutions.png20190323Waves.png20190322Rates.png
Pulser widths of AIDA modules, resolution is fairly typical. AIDA09 still noisier than other DSSD channels.

Figure 1: Picture of pulser peaks
Figure 2: Raw waves (AIDA01 did not calibrate, so AIDA02 used instead as "non DSSD module")
Entry  Fri Mar 22 14:31:24 2019, NH, A few more setup notes I forgot 20190322_132528s.jpg20190319_131821s.jpg20190313_161102s.jpg20190313_155418s.jpg
Extra FEE information:

HV braid (0 V) goes into FEE10 (beam left) with LK1 jumper
HV core (-160 V) goes into FEE09 (top)
Entry  Fri Mar 22 15:44:20 2019, NH, End of 22.03.2019 
End of the day - Detector unbiased and FEE64s turned off for the weekend as they won't be monitored.

Water will remain on.
Entry  Mon Mar 25 14:44:33 2019, NH, Merger issues Temps.pngAIDARUNv2.pngMergerv2.pngTapev2.pngMergerConsolev2.png
Plastic electronics have now been installed.

Water is not leaking still.

FEE64s powered on at 15:00 to test MBS connection (fig1: temperatures)
Entry  Tue Mar 26 14:59:30 2019, NH, 26.03.2019 20190326Temps.pngaidambsrelay-error.png
Fig1: FEE temperatures from 26.03.2019  all OK

AIDA has been on today and merger setting fixed (see previous ELOG entry https://elog.ph.ed.ac.uk/DESPEC/36)

Still diagnosing issues with MBS (figure 2) but local data acquisition should be functional.
Entry  Tue Apr 2 09:42:20 2019, NH, MBS Server setup 
MBS is currently configured and accepting data:

x86l-94 : AIDA Foreign data receiver

x86l-4 : DESPEC Time sorter
Entry  Thu Apr 4 14:07:45 2019, NH, Pulser Configuration 
Pulser settings during April run:

Rate 2Hz
Delay 250 NS