  546   Fri Mar 22 08:22:43 2024 NH, AM, MP, CCThu Mar 21> Fig 1-3: Noise situation at real thresholds
(0xa p+n, 0xf n+n)
  
  47   Wed Apr 10 12:33:58 2019 NH VPAIDA Firmware UpdateAll AIDA modules have been updated to a
new firmware 0xd330701 which should fix the
merger issues.
 20191004-FeeTemps.png20191004-GSIWR.png 
  107   Mon Dec 16 14:48:02 2019 NH TDAIDA 16.12.19DSSD Snout was reassembled to install the
second bPlast (downstream) 
 (fig 1)
 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png 
  406   Wed Mar 9 10:15:56 2022 NH TDWednesday 9 March - noise tests contd.11.15 - S4 is currently closed no access

If access possible (should be) plan is
 38x 
  427   Tue May 10 07:41:28 2022 NH TDTuesday 10 May8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
 29x 
  87   Tue Nov 5 10:02:45 2019 NH PJCSReport: aida10 database corruptionThis looks like the Options not the ASIC
data. That will be in the CONTENTS file of
the FEE64 named directory within the dated
  
  88   Tue Nov 5 10:32:21 2019 NH PJCSReport: aida10 database corruptionHi, see the attached files in the original
comment. I think the BACKUPCorrupt is quite
old now.
  
  89   Tue Nov 5 11:15:41 2019 NH PJCSReport: aida10 database corruptionIf ypou now check the actual values in
the aida10 Options screen are the correct
?
  
  76   Thu Oct 31 16:43:03 2019 NH CA TDMerger & MBS PerformanceTesting merger with 3 DSSDs connected, with
thresholds of 10 (slow comparator), 2 (HEC)
and 255 (fast discriminator)
 MergerStats.pngMBSRates.pngMergernetworking.pngMergerStatistics.png 
  24   Fri Jan 25 12:26:17 2019 NHRaspberry Pi Startup & InformationTwo raspberry pis:

nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN
  
  25   Fri Jan 25 12:33:03 2019 NHaida-gsi AccessIf you have a GSI account it should be
possible to connect to aida-gsi remotely
via the following
  
  27   Wed Mar 20 15:35:10 2019 NHAIDA Setup @ GSICurrently

- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted
  
  28   Thu Mar 21 13:59:08 2019 NHAIDA WaterThe AIDA water system has been repaired
and not leaking.

The interlock did not light immediately,
  
  29   Thu Mar 21 14:10:10 2019 NHFEE TemperaturesAll 12 FEEs powered up, and temperatures
are OK.

Passed ASIC checks and system wide
 FEETemps.png 
  31   Fri Mar 22 13:32:55 2019 NHAIDA Startup @ 22.03.2019FEEs have been on this morning, temperatures
attached

Leakage current attached
 20190323Bias.png20190322FEETemps.png 
  32   Fri Mar 22 13:47:32 2019 NHResolution ChecksPulser widths of AIDA modules, resolution
is fairly typical. AIDA09 still noisier than
other DSSD channels.
 20190322Resolutions.png20190323Waves.png20190322Rates.png 
  33   Fri Mar 22 14:31:24 2019 NHA few more setup notes I forgotExtra FEE information:

HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper
 20190322_132528s.jpg20190319_131821s.jpg20190313_161102s.jpg20190313_155418s.jpg 
  34   Fri Mar 22 15:44:20 2019 NHEnd of 22.03.2019End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored.
  
  35   Mon Mar 25 14:44:33 2019 NHMerger issuesPlastic electronics have now been installed.

Water is not leaking still.

FEE64s powered on at 15:00 to test
 Temps.pngAIDARUNv2.pngMergerv2.pngTapev2.pngMergerConsolev2.png 
  37   Tue Mar 26 14:59:30 2019 NH26.03.2019Fig1: FEE temperatures from 26.03.2019 
all OK

AIDA has been on today and merger
 20190326Temps.pngaidambsrelay-error.png 