546
|
Fri Mar 22 08:22:43 2024 |
NH, AM, MP, CC | Thu Mar 21 | > Fig 1-3: Noise situation at real thresholds
(0xa p+n, 0xf n+n)
>
|
|
|
|
47
|
Wed Apr 10 12:33:58 2019 |
NH VP | AIDA Firmware Update | All AIDA modules have been updated to a
new firmware 0xd330701 which should fix the
merger issues. |
 |
|
|
107
|
Mon Dec 16 14:48:02 2019 |
NH TD | AIDA 16.12.19 | DSSD Snout was reassembled to install the
second bPlast (downstream)
(fig 1)
|
    |
|
|
406
|
Wed Mar 9 10:15:56 2022 |
NH TD | Wednesday 9 March - noise tests contd. | 11.15 - S4 is currently closed no access
If access possible (should be) plan is
|
38x |
|
|
427
|
Tue May 10 07:41:28 2022 |
NH TD | Tuesday 10 May | 8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
|
29x |
|
|
87
|
Tue Nov 5 10:02:45 2019 |
NH PJCS | Report: aida10 database corruption | This looks like the Options not the ASIC
data. That will be in the CONTENTS file of
the FEE64 named directory within the dated |
|
|
|
88
|
Tue Nov 5 10:32:21 2019 |
NH PJCS | Report: aida10 database corruption | Hi, see the attached files in the original
comment. I think the BACKUPCorrupt is quite
old now. |
|
|
|
89
|
Tue Nov 5 11:15:41 2019 |
NH PJCS | Report: aida10 database corruption | If ypou now check the actual values in
the aida10 Options screen are the correct
? |
|
|
|
76
|
Thu Oct 31 16:43:03 2019 |
NH CA TD | Merger & MBS Performance | Testing merger with 3 DSSDs connected, with
thresholds of 10 (slow comparator), 2 (HEC)
and 255 (fast discriminator)
|
   |
|
|
24
|
Fri Jan 25 12:26:17 2019 |
NH | Raspberry Pi Startup & Information | Two raspberry pis:
nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN |
|
|
|
25
|
Fri Jan 25 12:33:03 2019 |
NH | aida-gsi Access | If you have a GSI account it should be
possible to connect to aida-gsi remotely
via the following |
|
|
|
27
|
Wed Mar 20 15:35:10 2019 |
NH | AIDA Setup @ GSI | Currently
- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted |
|
|
|
28
|
Thu Mar 21 13:59:08 2019 |
NH | AIDA Water | The AIDA water system has been repaired
and not leaking.
The interlock did not light immediately, |
|
|
|
29
|
Thu Mar 21 14:10:10 2019 |
NH | FEE Temperatures | All 12 FEEs powered up, and temperatures
are OK.
Passed ASIC checks and system wide |
|
|
|
31
|
Fri Mar 22 13:32:55 2019 |
NH | AIDA Startup @ 22.03.2019 | FEEs have been on this morning, temperatures
attached
Leakage current attached |
 |
|
|
32
|
Fri Mar 22 13:47:32 2019 |
NH | Resolution Checks | Pulser widths of AIDA modules, resolution
is fairly typical. AIDA09 still noisier than
other DSSD channels. |
  |
|
|
33
|
Fri Mar 22 14:31:24 2019 |
NH | A few more setup notes I forgot | Extra FEE information:
HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper |
   |
|
|
34
|
Fri Mar 22 15:44:20 2019 |
NH | End of 22.03.2019 | End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored. |
|
|
|
35
|
Mon Mar 25 14:44:33 2019 |
NH | Merger issues | Plastic electronics have now been installed.
Water is not leaking still.
FEE64s powered on at 15:00 to test |
    |
|
|
37
|
Tue Mar 26 14:59:30 2019 |
NH | 26.03.2019 | Fig1: FEE temperatures from 26.03.2019
all OK
AIDA has been on today and merger |
 |