AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 20 of 37
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
728 Entries
Goto page
Previous
1
,
2
,
3
...
19
, 20,
21
...
35
,
36
,
37
Next
ID
Date
Author
Subject
Text
107
Mon Dec 16 14:48:02 2019
NH TD
AIDA 16.12.19
DSSD Snout was reassembled to install the
second bPlast (downstream)
(fig 1)
406
Wed Mar 9 10:15:56 2022
NH TD
Wednesday 9 March - noise tests contd.
11.15 - S4 is currently closed no access
If access possible (should be) plan is
38x
427
Tue May 10 07:41:28 2022
NH TD
Tuesday 10 May
8:15am S4 CONTROLLED ACCESS to remove beam
plug and check bPlas/AIDA response to beam
29x
87
Tue Nov 5 10:02:45 2019
NH PJCS
Report: aida10 database corruption
This looks like the Options not the ASIC
data. That will be in the CONTENTS file of
the FEE64 named directory within the dated
88
Tue Nov 5 10:32:21 2019
NH PJCS
Report: aida10 database corruption
Hi, see the attached files in the original
comment. I think the BACKUPCorrupt is quite
old now.
89
Tue Nov 5 11:15:41 2019
NH PJCS
Report: aida10 database corruption
If ypou now check the actual values in
the aida10 Options screen are the correct
?
76
Thu Oct 31 16:43:03 2019
NH CA TD
Merger & MBS Performance
Testing merger with 3 DSSDs connected, with
thresholds of 10 (slow comparator), 2 (HEC)
and 255 (fast discriminator)
24
Fri Jan 25 12:26:17 2019
NH
Raspberry Pi Startup & Information
Two raspberry pis:
nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN
25
Fri Jan 25 12:33:03 2019
NH
aida-gsi Access
If you have a GSI account it should be
possible to connect to aida-gsi remotely
via the following
27
Wed Mar 20 15:35:10 2019
NH
AIDA Setup @ GSI
Currently
- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted
28
Thu Mar 21 13:59:08 2019
NH
AIDA Water
The AIDA water system has been repaired
and not leaking.
The interlock did not light immediately,
29
Thu Mar 21 14:10:10 2019
NH
FEE Temperatures
All 12 FEEs powered up, and temperatures
are OK.
Passed ASIC checks and system wide
31
Fri Mar 22 13:32:55 2019
NH
AIDA Startup @ 22.03.2019
FEEs have been on this morning, temperatures
attached
Leakage current attached
32
Fri Mar 22 13:47:32 2019
NH
Resolution Checks
Pulser widths of AIDA modules, resolution
is fairly typical. AIDA09 still noisier than
other DSSD channels.
33
Fri Mar 22 14:31:24 2019
NH
A few more setup notes I forgot
Extra FEE information:
HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper
34
Fri Mar 22 15:44:20 2019
NH
End of 22.03.2019
End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored.
35
Mon Mar 25 14:44:33 2019
NH
Merger issues
Plastic electronics have now been installed.
Water is not leaking still.
FEE64s powered on at 15:00 to test
37
Tue Mar 26 14:59:30 2019
NH
26.03.2019
Fig1: FEE temperatures from 26.03.2019
all OK
AIDA has been on today and merger
42
Tue Apr 2 09:42:20 2019
NH
MBS Server setup
MBS is currently configured and accepting
data:
x86l-94 : AIDA Foreign data receiver
46
Thu Apr 4 14:07:45 2019
NH
Pulser Configuration
Pulser settings during April run:
Rate 2Hz
Delay 250 NS
Goto page
Previous
1
,
2
,
3
...
19
, 20,
21
...
35
,
36
,
37
Next
ELOG V3.1.3-7933898