Entry  Fri Dec 20 12:04:03 2019, NH, TD, Friday 20 December 2019 7x
Fig 1: DSSD Leakage currents ok

Fig 2: FEE Temps ok
Entry  Fri Nov 1 10:46:13 2019, CA, TD, NH, Friday 1st November 2019 6x
11.46 - attachments 1,2,3: bias/leakage currents, good event statistics and fee temperatures (respectively)
        before removing aluminium foil upstream of AIDA
Entry  Fri Mar 19 17:16:45 2021, TD, Friday 19 March 8x

Screenshots of successive displays of Options for FEE64s aida01, 02, 03 and 04.
Entry  Fri Apr 19 13:52:34 2024, JB, CC, TD, Friday 19 April contd. 23x

12.00 Replaced AIDA ASIC mezzanine of aida01 to fix issue with asic #3
Entry  Fri Apr 19 02:35:14 2024, TD, Friday 19 April 38x

03.30
Entry  Sat Jun 18 09:46:57 2022, OH, NH, Friday 17th June 23x
Summary of the day:
Small improvements were made throughout the day but by far the biggest change to the rate in the FEEs came from disabling the waveforms
This was done by setting ADC con
Entry  Fri Apr 16 07:19:00 2021, OH, MA, Friday 16th April 08:00-16:00 14x
08:19 System wide checks all ok
      Baselines reset on WR and FPGA checks for the start of the day
Entry  Fri May 14 19:01:09 2021, JS, Friday 14th May 20:00-00:00 27x
20:00 Taking over from CB

20:33 Doing full checks.
Entry  Fri May 14 14:57:32 2021, CB + OH, TD, NH, Friday 14th May 16:00-20:00 33x
16:00 Shift taken over from CA

16:00 
Entry  Fri May 14 07:05:08 2021, CA, Friday 14th May 08:00 - 16:00 shift 24x
08:00 CA takes over

08:28 Problem at UNILAC - no beam
Entry  Thu May 13 23:58:05 2021, OH, Friday 14th May 00:00 - 08:00 21x
00:00 OH Takes over.
 PULSER SETTINGS
---------------------------
Entry  Fri Mar 13 08:01:53 2020, DK, Friday 13th 8:00 to 16:00 shift 8x
8:00 - See previous shift's elog entry.  All good.

9:00
Entry  Thu Mar 12 23:04:24 2020, LS, DK, Friday 13th 00:00 to 08:00 shift 20x
   Shift file starting R9_639

   system wide checks okay
Entry  Fri May 13 07:36:18 2022, OH, TD, Friday 13 May 35x
08:36 DAQ Still running smoothly
      Currently on run R1_328
      At current data rates we have just over 4 days of space left on the current disk
Entry  Fri Jun 13 12:42:39 2025, CC, TD, Friday 13 June 2025 10x

13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
Entry  Fri Mar 12 10:09:19 2021, LS, CA, Friday 12th March 11.00- 17x
11.00(Germany) System wide checks okay except:

      FEE64 module aida09 global clocks failed, 6
Entry  Fri Mar 12 08:32:46 2021, TD, Friday 12 March 08.00- Screenshot_2021-03-12_Temperature_and_status_scan_aidas-gsi.pngScreenshot_2021-03-12_Statistics_aidas-gsi.png30.pngScreenshot_2021-03-12_Spectrum_Browser_aidas-gsi(1).pngScreenshot_2021-03-12_Spectrum_Browser_aidas-gsi.png
08.31 DAQ continues OK - file R33_263

      ASIC settings 2019Dec19-16.19.51
Entry  Fri Mar 12 20:12:10 2021, TD, Friday 12 March Screenshot_2021-03-12_Temperature_and_status_scan_aidas-gsi(1).pngScreenshot_2021-03-12_Statistics_aidas-gsi(1).png31.pngScreenshot_2021-03-12_Statistics_aidas-gsi(2).pngScreenshot_2021-03-12_Statistics_aidas-gsi(3).png
21.12 DAQ continues OK - file R33_617

      ASIC settings 2019Dec19-16.19.51
Entry  Fri Feb 11 12:09:24 2022, NH, Fri 11 Feb AIDA Work 
Use beam break between FRS experiments to finalise getting AIDA testable for PJCS etc.

USB hubs reconnected - all 16 ttyUSBs seem to be visible now
Entry  Fri Jun 10 10:32:46 2022, NH, Fri 10 Jun 8x
Probe PSU output with 'scope again and 10X probe

Use a AC mains scope as was available, means referenced to ground of AC, but should be ground of platform (and hence Fee64)