119
|
Fri Dec 20 12:04:03 2019 |
NH, TD | Friday 20 December 2019 | Fig 1: DSSD Leakage currents ok
Fig 2: FEE Temps ok
|
7x |
|
80
|
Fri Nov 1 10:46:13 2019 |
CA, TD, NH | Friday 1st November 2019 | 11.46 - attachments 1,2,3: bias/leakage currents,
good event statistics and fee temperatures
(respectively)
|
6x |
|
205
|
Fri Mar 19 17:16:45 2021 |
TD | Friday 19 March |
Screenshots of successive displays of Options
for FEE64s aida01, 02, 03 and 04. |
8x |
|
580
|
Fri Apr 19 13:52:34 2024 |
JB, CC, TD | Friday 19 April contd. |
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
|
23x |
|
579
|
Fri Apr 19 02:35:14 2024 |
TD | Friday 19 April |
03.30
|
38x |
|
482
|
Sat Jun 18 09:46:57 2022 |
OH, NH | Friday 17th June | Summary of the day:
Small improvements were made throughout the
day but by far the biggest change to the |
23x |
|
229
|
Fri Apr 16 07:19:00 2021 |
OH, MA | Friday 16th April 08:00-16:00 | 08:19 System wide checks all ok
Baselines reset on WR and FPGA checks
for the start of the day
|
14x |
|
319
|
Fri May 14 19:01:09 2021 |
JS | Friday 14th May 20:00-00:00 | 20:00 Taking over from CB
20:33 Doing full checks.
|
27x |
|
317
|
Fri May 14 14:57:32 2021 |
CB + OH, TD, NH | Friday 14th May 16:00-20:00 | 16:00 Shift taken over from CA
16:00
|
33x |
|
316
|
Fri May 14 07:05:08 2021 |
CA | Friday 14th May 08:00 - 16:00 shift | 08:00 CA takes over
08:28 Problem at UNILAC - no beam
|
24x |
|
315
|
Thu May 13 23:58:05 2021 |
OH | Friday 14th May 00:00 - 08:00 | 00:00 OH Takes over.
PULSER SETTINGS
---------------------------
|
21x |
|
148
|
Fri Mar 13 08:01:53 2020 |
DK | Friday 13th 8:00 to 16:00 shift | 8:00 - See previous shift's elog entry. All
good.
|
8x |
|
146
|
Thu Mar 12 23:04:24 2020 |
LS, DK | Friday 13th 00:00 to 08:00 shift | Shift file starting R9_639
system wide checks okay
|
20x |
|
442
|
Fri May 13 07:36:18 2022 |
OH, TD | Friday 13 May | 08:36 DAQ Still running smoothly
Currently on run R1_328
At current data rates we have just |
35x |
|
704
|
Fri Jun 13 12:42:39 2025 |
CC, TD | Friday 13 June 2025 |
13.42 ASIC settings 2025Jun12-13.53.04
*all* FEE64s slow comparator 0x64
|
10x |
|
192
|
Fri Mar 12 10:09:19 2021 |
LS, CA | Friday 12th March 11.00- | 11.00(Germany) System wide checks okay except:
FEE64 module aida09 global clocks failed, |
17x |
|
191
|
Fri Mar 12 08:32:46 2021 |
TD | Friday 12 March 08.00- | 08.31 DAQ continues OK - file R33_263
ASIC settings 2019Dec19-16.19.51
|
    |
|
193
|
Fri Mar 12 20:12:10 2021 |
TD | Friday 12 March | 21.12 DAQ continues OK - file R33_617
ASIC settings 2019Dec19-16.19.51
|
    |
|
395
|
Fri Feb 11 12:09:24 2022 |
NH | Fri 11 Feb AIDA Work | Use beam break between FRS experiments to
finalise getting AIDA testable for PJCS etc.
|
|
|
479
|
Fri Jun 10 10:32:46 2022 |
NH | Fri 10 Jun | Probe PSU output with 'scope again and 10X
probe
|
8x |