Entry  Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
21.35 AIDA DAQ currently running, TapeService on, not writing to storage

      System wide checks ok
Entry  Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
15:30
  TD found the merger was running at ~43 Mb/s
  The odd-numbered FEE64s all had significant (>200k) disk rates
Entry  Fri Nov 1 09:30:17 2019, NH, Database error stopping run? ErrorStopDatabase.png
Strange error about Database options appearing during run stop.
Does not seem to affect stopping/starting/data?
Entry  Wed Oct 30 08:06:49 2019, CA, TD, NH, DSSSD stack 6x
Ribbon cables fitted with kapton PCB couplers -> 3 isolated + 1 non-isolated for each cable length/DSSSD

Ribbon cable lengths:
Entry  Wed Mar 13 13:02:19 2024, JB, NH, HA, MA, DSSD 1 biasing tests 20240313_142551.jpg
Dismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then current ramps up
Entry  Mon Oct 18 13:03:23 2021, OH, DHCPd.conf backup dhcpd.conf
 
Entry  Sun Apr 28 15:49:58 2024, TD, DAQ restart short(er) cut 

16.45 aida04 stopped producing data
Entry  Wed Mar 2 09:08:44 2022, OH, DAQ Status 2nd March 2022 220302_1002_goodevents.png220302_1002_white_rabbit.png220302_1003_merger.png220302_1003_merger_data_buffers.png220302_1004_merger_merge_time_errors.png
DAQ was found yesterday with none of the FEEs reporting any good events on any FEE - attachment 1
Temperature menu is still responsive and all FEEs report a temperature
Looking at the white rabbit timestamps aida09 has a gibberish timestamp - attachment 2
    Reply  Wed Mar 2 10:05:13 2022, OH, DAQ Status 2nd March 2022 
> DAQ was found yesterday with none of the FEEs reporting any good events on any FEE - attachment 1
> Temperature menu is still responsive and all FEEs report a temperature
> Looking at the white rabbit timestamps aida09 has a gibberish timestamp - attachment 2
Entry  Thu May 9 09:08:26 2024, TD, Current NewMerger install - aida-gsi 
[npg@aidas-gsi MIDAS]$ ls -l
total 524
drwxrwxr-x.  2 npg npg    156 Mar 17  2021 Aida
Entry  Wed Apr 14 12:14:47 2021, PJCS, Corrections and changes 
14/4/21 @12:00 UK time

Corrected the failure of FADC re-calibration All modules. The problem was a missing > in the .tml file

Edited the sys.tcl file in /MIDAS/TclHttpd/Html/RunControl to comment out where the status of the waveform enable was able to stop the creation
Entry  Tue Apr 9 13:22:41 2024, TD, JB, CC, Continued of 9th of April Screenshot_from_2024-04-09_14-22-20.pngScreenshot_from_2024-04-09_14-22-16.pngScreenshot_from_2024-04-09_17-18-45.png
Disconnected test - pulser from aida08. Noise conditions improved slightly, probably less pulser events. (Attachments 1 & 2).

We recabled the dew point sensor and flow sensor for the water supply interlock to the FEE64s. When we tried to power up the interlock box, the
PSU (charging block) LED was blinking indicating an internal power instability. We then plugged each of the sensors out and into the interlock box and
Entry  Thu May 13 19:52:36 2021, Philippos and Marc, Connection problem 2021-05-13_ucesb_scalers.png
At 20:15, We lost connection with AnyDesk.

Liliana restarted Anydesk on the AIDA DAQ PC. All seemed fine on AIDA DAQ but there was a more generic issue on the main DAQ, possibly the timesorter.

Helena restarted all after ~30mn and it's all working again now.
Entry  Mon May 10 11:45:15 2021, NH, Confusing behaviour of rates  
Testing the behaviour of powering down the fast ADCs in aida01 (the hot FEE)

Set local control 2 to 0xff in aida01
Entry  Thu Apr 29 16:56:42 2021, OH, Config changes for 16FEE 
New set of ASIC settings produced 2021Apr29-13-16-00
- Note no longer odd/even for polarity of signal
Entry  Wed Jul 23 09:37:34 2025, CC, NK, Comparison pulser FWHM with/without HT and detector cables 9x
This elog is the first reliable. Before, the histograms have not been zero'd

Each test are done and compared for AIDA05.1.8L, compared with the pulser (caracteristics, see attachment1)

Test 1: with HT cables shielded
Entry  Wed Jul 23 17:02:22 2025, CC, NK, Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L 8x
BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased
at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to
an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.
Entry  Thu Jul 24 10:28:04 2025, CC, NK, MP, Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L 8x
BB7 is still connected but not biased (same configuration as the previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased
at 100V. The channel of the CAEN power supply #1 is disconnected but still biased at 100V. AIDA04 (chained to AIDA05) is biased via an unshielded
cable to an iseg NHQ 246L power supplied, biased at 100 V with 15 uA.
Entry  Wed Jul 23 13:08:30 2025, CC, NK, Comparison of channels in the same FEE64 and ASIC 05.1 Screenshot_from_2025-07-23_14-11-36.pngScreenshot_from_2025-07-23_14-13-46.pngScreenshot_from_2025-07-23_14-16-03.pngScreenshot_from_2025-07-23_14-18-27.pngScreenshot_from_2025-07-23_14-20-42.png
Biased at 100, AIDA05 connected, HT cables not shielded CAEN HT

Attachment 1: AIDA05.1.8L --> FWHM 75 channels

Attachment 2: AIDA05.1.1L --> FWHM 70 channels; peak of the pulser shifted to the right (red lines on the left: cursor for the 1.8L)
Entry  Thu Jul 24 15:50:01 2025, CC, MP, NK, Check of BB7 impact Screenshot_from_2025-07-24_16-49-27.pngScreenshot_from_2025-07-24_17-03-44.pngScreenshot_from_2025-07-24_17-22-49.pngScreenshot_from_2025-07-24_17-29-38.png
HT of upstream AIDA from iseg, HT cable shielded, 100V, 17 uA. HT of downstream AIDA from CAEN, AIDA#0. Both channel 0 and 1 of CAEN
are on, even though there is just one channel connected. DEGAS platform closed. The crates of BB7 and bplast have been put to the ground of the AIDA's
structure (cupper sheet)