| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
104
|
Fri Dec 6 20:34:56 2019 |
CA, DK, NH | Dec 6 Night Shift | 21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
|
15x |
|
|
103
|
Thu Dec 5 22:00:11 2019 |
CA, DK, NH | Dec 5 Night Shift | 15:30
TD found the merger was running at ~43
Mb/s
|
30x |
|
|
79
|
Fri Nov 1 09:30:17 2019 |
NH | Database error stopping run? | Strange error about Database options appearing
during run stop.
Does not seem to affect stopping/starting/data? |
|
|
|
68
|
Wed Oct 30 08:06:49 2019 |
CA, TD, NH | DSSSD stack | Ribbon cables fitted with kapton PCB couplers
-> 3 isolated + 1 non-isolated for each cable
length/DSSSD
|
6x |
|
|
535
|
Wed Mar 13 13:02:19 2024 |
JB, NH, HA, MA | DSSD 1 biasing tests | Dismounted Snout and biased DSSSD1 channels
leftmost waifer working
middle waifer reaches 90V then |
|
|
|
382
|
Mon Oct 18 13:03:23 2021 |
OH | DHCPd.conf backup | |
|
|
|
617
|
Sun Apr 28 15:49:58 2024 |
TD | DAQ restart short(er) cut |
16.45 aida04 stopped producing data
|
|
|
|
398
|
Wed Mar 2 09:08:44 2022 |
OH | DAQ Status 2nd March 2022 | DAQ was found yesterday with none of the FEEs
reporting any good events on any FEE - attachment
1
|
    |
|
|
399
|
Wed Mar 2 10:05:13 2022 |
OH | DAQ Status 2nd March 2022 | > DAQ was found yesterday with none of the
FEEs reporting any good events on any FEE
- attachment 1
|
|
|
|
631
|
Thu May 9 09:08:26 2024 |
TD | Current NewMerger install - aida-gsi | [npg@aidas-gsi MIDAS]$ ls -l
total 524
drwxrwxr-x. 2 npg npg 156 Mar 17 2021 |
|
|
|
220
|
Wed Apr 14 12:14:47 2021 |
PJCS | Corrections and changes | 14/4/21 @12:00 UK time
Corrected the failure of FADC re-calibration
All modules. The problem was a missing > |
|
|
|
569
|
Tue Apr 9 13:22:41 2024 |
TD, JB, CC | Continued of 9th of April | Disconnected test - pulser from aida08.
Noise conditions improved slightly, probably
less pulser events. (Attachments 1 & |
  |
|
|
313
|
Thu May 13 19:52:36 2021 |
Philippos and Marc | Connection problem | At 20:15, We lost connection with AnyDesk.
Liliana restarted Anydesk on the
AIDA DAQ PC. All seemed fine on AIDA DAQ |
|
|
|
304
|
Mon May 10 11:45:15 2021 |
NH | Confusing behaviour of rates | Testing the behaviour of powering down the
fast ADCs in aida01 (the hot FEE)
|
|
|
|
287
|
Thu Apr 29 16:56:42 2021 |
OH | Config changes for 16FEE | New set of ASIC settings produced 2021Apr29-13-16-00
- Note no longer odd/even for polarity of
signal
|
|
|
|
710
|
Wed Jul 23 09:37:34 2025 |
CC, NK | Comparison pulser FWHM with/without HT and detector cables | This elog is the first reliable.
Before, the histograms have not been zero'd
Each test are done and compared |
9x |
|
|
715
|
Wed Jul 23 17:02:22 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
|
716
|
Thu Jul 24 10:28:04 2025 |
CC, NK, MP | Comparison of channels in the same FEE64 and ASIC 05.1 and with AIDA13.1.8L | BB7 is still connected but not biased (same
configuration as the previous elog). The
channel of the CAEN power supply #0 is connected |
8x |
|
|
711
|
Wed Jul 23 13:08:30 2025 |
CC, NK | Comparison of channels in the same FEE64 and ASIC 05.1 | Biased at 100, AIDA05 connected, HT cables
not shielded CAEN HT
Attachment 1: AIDA05.1.8L --> |
    |
|
|
718
|
Thu Jul 24 15:50:01 2025 |
CC, MP, NK | Check of BB7 impact | HT of upstream AIDA from iseg, HT
cable shielded, 100V, 17 uA. HT
of downstream AIDA from CAEN, AIDA#0. Both |
   |