AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 29 of 34  ELOG logo
Entry  Mon Feb 17 09:48:34 2020, NH, Report: aida09 Kernel Panic & Lost WR  ttyUSB12GSI_WR.pngGSI_WR2.pngGSI_WR4.pngGSI_WR3.png
aida09 crashed over the weekend and automatically rebooted.
After the reboot the WR timestamp sent to the merger is in the future and hence incorrect
    Reply  Wed Feb 19 10:58:29 2020, NH, PJCS, Report: aida09 Kernel Panic & Lost WR  
> aida09 crashed over the weekend and automatically rebooted.
> After the reboot the WR timestamp sent to the merger is in the future and hence incorrect
Entry  Fri Feb 14 12:50:29 2020, NH, AIDA Noise 14.02.2020 6x
Electricians changed the grounding for the DESPEC platform to a large pillar that goes deep into soil

Change in grounding was apparently successful at reducing the noise complaints in Cave C (R3B)
Entry  Wed Jan 29 12:22:13 2020, NH, aida10 troubleshooting aida08-noise.pngaida10-noitems.pngStats.png
aida10 has no ASIC events when running without pulser

DSSD ribbon cable was replaced, no change
    Reply  Wed Jan 29 19:09:51 2020, NH, aida10 troubleshooting 
> aida10 has no ASIC events when running without pulser

> DSSD ribbon cable was replaced, no change
Entry  Wed Jan 15 14:53:41 2020, NH, AIDA Noise 14.01.2019 6x
Checking noise

DESPEC crate entirely offline except:
    Reply  Mon Jan 20 14:01:23 2020, NH, AIDA Noise 20.01.2019 6x
> Checking noise

> DESPEC crate entirely offline except:
Entry  Fri Dec 20 12:04:03 2019, NH, TD, Friday 20 December 2019 7x
Fig 1: DSSD Leakage currents ok

Fig 2: FEE Temps ok
Entry  Fri Dec 20 10:19:29 2019, NH, Alpha Analysis (Pre Run) Alphas.pngAlphas_E.png
======================================                                                                                                                 
                                                                                                                      
AIDA Unpacker Analysis                                                                                                                                
Entry  Thu Dec 19 14:45:42 2019, TD, FEE64 ASIC settings - different diode link settings 
[npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
Entry  Thu Dec 19 14:26:09 2019, TD, BNC PB-5 - Manual pb-5manual.pdf
 
Entry  Thu Dec 19 14:07:38 2019, TD, Report - low - aida08 ADC spectrum size 32k cf. 64k channels expcted using layout 6x
Note that aida08 spectrum 1.8.L size is (shown as) 32k channels cf. 64k channels expected using layout - attachment 1 - 5
Layout configuration - attachment 6
Why?
Entry  Thu Dec 19 13:09:32 2019, TD, MIDAS app launcher command lines 

App                          Path
Entry  Thu Dec 19 13:06:02 2019, TD, NH, AIDA@DESPEC To Do list 
FAIR phase 0 DESPEC experiments are scheduled March-May 2020 see

https://www.gsi.de/en/work/organisation/scientific_boards/user/beam_time.htm
Entry  Thu Dec 19 10:11:59 2019, TD, Report - medium - FEE64 panics during boot 300.png

Some of the FEE64s aida01 .. aida12 panic during boot 
Entry  Thu Dec 19 09:22:52 2019, TD, Thusrday 19 December 21x
10.15 Found DAQ running at c. 1M data items/s 

      Rate spectra show aida09 1.*.H and one 1x LEC channel of aida08 asic running hot
Entry  Wed Dec 18 17:39:27 2019, TD, Wednesday 18 December 23x

18.40 Detector biases & leakage currents OK - attachment 1
      FEE64 temperatures OK - attachment 2
Entry  Wed Dec 18 02:44:27 2019, NH, 17.12.19, 18.12.19  7x
Beam: 238U (850 MeV/u)
Fragment: 168Re
Entry  Mon Dec 16 14:48:02 2019, NH TD, AIDA 16.12.19 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png
DSSD Snout was reassembled to install the second bPlast (downstream) 
 (fig 1)
Entry  Wed Dec 11 10:58:52 2019, NH, Initital Dec. Analysis 11x
Fig 1: 2D hit pattern of each AIDA DSSD for MBS run 24 (40Ar primary beam, centred)

Low statistics in DSSD2 partly due to low energy deposition 
Entry  Sat Dec 7 02:39:02 2019, DK, NH et al., 34Si Fragments PID 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp
See attached

Tentative PID (DK) as attachment #3
Entry  Fri Dec 6 20:34:56 2019, CA, DK, NH, Dec 6 Night Shift 15x
21.35 AIDA DAQ currently running, TapeService on, not writing to storage

      System wide checks ok
Entry  Thu Dec 5 22:00:11 2019, CA, DK, NH, Dec 5 Night Shift 30x
15:30
  TD found the merger was running at ~43 Mb/s
  The odd-numbered FEE64s all had significant (>200k) disk rates
ELOG V3.1.4-unknown