| ID |
Date |
Author |
Subject |
Text |
 |
|
721
|
Thu Oct 23 12:22:31 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | >
> We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can |
8x | |
723
|
Fri Oct 24 10:31:59 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | > >
> > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they |
6x | |
724
|
Fri Oct 24 12:29:02 2025 |
JB, GB, MP, AM, NH | 207Bi source threshold tests | > > >
> > > We have dismounted the AIDA stack and
bPlast and realigned the cables so that they |
11x | |
725
|
Fri Oct 24 14:33:37 2025 |
JB, GB, MP, AM | Snout grounding, bias and test input layout as of 24.10.2025 | |
| |
729
|
Tue Oct 28 12:43:38 2025 |
JB, GB, MP, AM | Further setup of tests for 207Bi test | - Ch 2 and 3 of CAEN HV module changed to
negative polarity, Ch 0,1 still with positive
polarity
|
14x | |
720
|
Wed Oct 15 09:41:24 2025 |
JB, GB, MP | 207Bi source threshold tests |
We have dismounted the AIDA stack and bPlast
and realigned the cables so that they can |
  | |
743
|
Fri Nov 7 12:30:30 2025 |
JB, GB, MP | Pulser walkthrough for source tests. | 13:30 We are going to do the pulser walkthrough
for the the source tests.
|
    | |
699
|
Thu Feb 20 17:06:42 2025 |
JB, CC, TD,MP | WR error for aida 13,14,15,16 | WR timestamp errors resolved after reseating
the HDMI cables to the MACB |
| |
531
|
Fri Mar 8 16:05:57 2024 |
JB, CC, TD, NH | Friday 8 March | Bias tests of AIDA on individual wafers
and in parallel. Spreadsheet can be found
in attachment 1, and graphic results can |
  | |
566
|
Mon Apr 8 16:39:00 2024 |
JB, CC, TD | Monday 8 April |
17.32 Power and detector bias cycle
|
11x | |
570
|
Wed Apr 10 08:37:57 2024 |
JB, CC, TD | Wednesday 10 April |
09.38 CC completed install of Bplast driver
PCBs yesterday evening.
|
47x | |
580
|
Fri Apr 19 13:52:34 2024 |
JB, CC, TD | Friday 19 April contd. |
12.00 Replaced AIDA ASIC mezzanine of aida01
to fix issue with asic #3
|
23x | |
630
|
Tue May 7 13:25:00 2024 |
JB, CC, NH, HMA | Tuesday 6 May - dismount snout | Status before dismount
14:26 DSSSD#1 119.99 V @ 17.968
uA |
 | |
555
|
Tue Apr 2 12:36:25 2024 |
JB, CC, NH | Installing FEE64s of DSSSD2 cont. | Some additional checks
- check 'top
hat' electrical isolators are correctly |
| |
685
|
Thu Jan 9 15:43:17 2025 |
JB, CC, MP | Timing test platform moved in | 16:30 We moved the platform in. The system
was still biased and the DAQ was still running.
The system seems to be okay, temperatures |
  | |
572
|
Thu Apr 11 22:04:50 2024 |
JB | 12.04.2024 AIDA-bPlast noise optimisation | 15:00 Platform in, biasing detector. Temp
OK Attachment 1. test - Pulser OFF.
|
    | |
573
|
Sat Apr 13 14:04:44 2024 |
JB | 13 April Noise checks | 15:04 bPlast was left powered over night.
Powering up to check noise conditions - also
to check shifting of Germanium baseline (no |
9x | |
669
|
Wed Aug 14 12:40:11 2024 |
JB | Repaired DSSSD delivery 14.09.2024 | Three BB18-1000 triples AIDAs collected
on 14.09.2024
Find attached visual of the wafer |
11x | |
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
| |
529
|
Thu Mar 7 11:09:05 2024 |
HA, JB, CC, TD, MG | Thursday 7 March |
Snout assembly
|
|
|