109
|
Mon Jun 10 04:18:24 2019 |
Ale, Jose | New Configuration File | File: 20190610_1145_Conf_DTAS.xlsx
Several changes and corrections
|
|
115
|
Mon Jun 10 12:48:01 2019 |
Ale, Jose | New Config file | Conf file with new calibration:
20190610_2035_Conf_DTAS.xlsx
|
6x |
113
|
Mon Jun 10 10:44:36 2019 |
Ale, Jose | New Conf file with new calibration | File: 20190610_1835_Conf_DTAS.xlsx |
|
126
|
Sun Jun 16 01:36:08 2019 |
Victor | Mm 100Sn beam | |
   |
141
|
Mon Jun 17 06:28:06 2019 |
Victor | MC number of implants | Counts in DTAS
Proposal 2730
4 days 888
|
|
96
|
Tue Jun 4 06:25:51 2019 |
A. Algora | Lead shielding was "upgraded" | With the help of Tom the additional lead
pieces were put. So now the hole in the lead
shielding matches the hole in the polyethylene |
|
44
|
Fri May 24 07:57:51 2019 |
A. Algora | Lead shielding heigth increased | The aluminium plate of 3 cm thickness arrived
and the lead shielding was dismounted and
mounted again. We left a narrower hole in |
|
66
|
Wed May 29 02:07:20 2019 |
A. Algora | Irradiation for 24Na | Irradiation of two pieces of aluminium
of 80 mm x 40 mm x 10 mm will be performed
at the second BigRips dipole. |
|
2
|
Tue May 14 13:16:33 2019 |
JLT | Hardware setup | |
11x |
56
|
Mon May 27 07:34:58 2019 |
A. Algora | HV status | EMPTY00 │
0.0 V 1500.0 uA 0.5 V
0.5 uA Off |
|
5
|
Wed May 15 06:53:52 2019 |
Nacher Kiss Algora | HV setting | EMPTY00 │0.0
V 1500.0 uA 0.5 V
0.5 uA Off |
|
111
|
Mon Jun 10 09:58:42 2019 |
Jose, Ale | Gain matching | We have corrected small gain changes by changing
the HV of detectors. Attached are the new
values |
 |
67
|
Wed May 29 07:04:19 2019 |
A. Algora | F11 plastic connected | F11 plastic has been connected to our dacq
as it was in the earlier BRIKEN setting.
The detector cables were followed |
|
7
|
Wed May 15 08:11:46 2019 |
Tolosa, Nacher, Algora, Kiss | Energy resolutions |
Using getSigmaCal.cxx macro to check energy
resolutions...
|
 |
22
|
Mon May 20 09:39:23 2019 |
A. Algora | Dynode 08 threshold changed | Dynode 08 threshold was changed from 675
to 790. Now the rate in this detector is
fine. |
|
14
|
Thu May 16 06:59:51 2019 |
Algora Kiss Nacher | Det 3 | Det 3 moved, both Anode and Dynode. So
we have changed the HV cable to test if there
are no more jumps. We used cable 9 and it |
|
4
|
Wed May 15 06:40:16 2019 |
Algora, Kiss, Nacher | DTAS aligned and calibrated | Signal cables (long cables, from preamp
to digitizer) of channels 13 and 16 were
changed. For the moment they have not been |
   |
25
|
Tue May 21 02:20:26 2019 |
A. Algora | Cs measurement, Cs401, 4763 | Start: 10:25
Stop: 11:26
lmd: Cs137_source_201905211025_052.dl |
|
102
|
Fri Jun 7 09:37:15 2019 |
The same team | Cs for the AIDA synch test | Start: 17:41
Stop: 18:17
AIDA files: R19_1 (@17:57) |
|
103
|
Fri Jun 7 12:35:14 2019 |
Jorge, Alvaro | Correlation time AIDA_DTAS for 60Co source | Files at mars /home/briken/190607AidaTasTest60Co |
|