AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS, Page 4 of 8  ELOG logo
Entry  Mon Jun 10 04:18:24 2019, Ale, Jose, New Configuration File 20190610_1145_Conf_DTAS.xlsx
File:  20190610_1145_Conf_DTAS.xlsx

Several changes and corrections
Entry  Mon Jun 10 12:48:01 2019, Ale, Jose, New Config file 6x
Conf file with new calibration:
20190610_2035_Conf_DTAS.xlsx
Entry  Mon Jun 10 10:44:36 2019, Ale, Jose, New Conf file with new calibration 
File: 20190610_1835_Conf_DTAS.xlsx
Entry  Sun Jun 16 01:36:08 2019, Victor, Mm 100Sn beam Mm_beam_ON_100Sn_runs9-11.pngMm_beam_ON_100Sn_runs9-11_zoom.pngMm_beam_ON_100Sn_runs9-11.CMm_beam_ON_100Sn_runs9-11_linear.png
 
Entry  Mon Jun 17 06:28:06 2019, Victor, MC number of implants MC_100Sn_days.png
           Counts in DTAS
Proposal   2730 
4 days     888
Entry  Tue Jun 4 06:25:51 2019, A. Algora, Lead shielding was "upgraded" 
With the help of Tom the additional lead pieces were put. So now the hole in the lead shielding matches the hole in the polyethylene shielding.

The hole is 11 cm x 11 cm approximately

 
Entry  Fri May 24 07:57:51 2019, A. Algora, Lead shielding heigth increased 
The aluminium plate of 3 cm thickness arrived and the lead shielding was dismounted and mounted again. We left a narrower hole in it.

Special thanks to Tom, who helped with the hard physical work.
Entry  Wed May 29 02:07:20 2019, A. Algora, Irradiation for 24Na 
Irradiation of two pieces of aluminium of 80 mm x 40 mm x 10 mm will be performed at the second BigRips dipole.

The pieces were placed with the help of Fukuda and Nishimura san.
Entry  Tue May 14 13:16:33 2019, JLT, Hardware setup 11x
 
Entry  Mon May 27 07:34:58 2019, A. Algora, HV status 
EMPTY00    │   0.0 V 1500.0 uA    0.5 V    0.5 uA Off               
│00.0000
DET01        │ 599.0 V 1500.0 uA  598.5 V   90.0 uA On                
Entry  Wed May 15 06:53:52 2019, Nacher Kiss Algora, HV setting 
EMPTY00      │0.0    V 1500.0 uA    0.5 V    0.5 uA Off               
│00.0000
DET01        │ 597.0 V 1500.0 uA  596.5 V   89.5 uA On                
Entry  Mon Jun 10 09:58:42 2019, Jose, Ale, Gain matching Screenshot_from_2019-06-10_17-58-00.pngScreenshot_from_2019-06-10_17-57-56.png
We have corrected small gain changes by changing the HV of detectors. Attached are the new values
Entry  Wed May 29 07:04:19 2019, A. Algora, F11 plastic connected 
F11 plastic has been connected to our dacq as it was in the earlier BRIKEN setting.

The detector cables were followed and connections checked.

The outputs of the detector (L and R) go through an Ortec TFA 474 with the following settings:
Entry  Wed May 15 08:11:46 2019, Tolosa, Nacher, Algora, Kiss, Energy resolutions getSigmaCal.cxxcalFit5.root

Using getSigmaCal.cxx macro to check energy resolutions...
root [3] getSigmaCal("201905151555_137Cs.root")
Entry  Mon May 20 09:39:23 2019, A. Algora, Dynode 08 threshold changed 
Dynode 08 threshold was changed from 675 to 790. Now the rate in this detector is fine.

The global rates for the cards (dynodes and anodes) are similar.
Entry  Thu May 16 06:59:51 2019, Algora Kiss Nacher, Det 3 
Det 3 moved, both Anode and Dynode. So we have changed the HV cable to test if there are no more jumps. We used cable 9 and it was not

relabeled. The HV of the detector was corrected. It was changed to 527.5 V
Entry  Wed May 15 06:40:16 2019, Algora, Kiss, Nacher , DTAS aligned and calibrated Screenshot_from_2019-05-15_14-29-57.pngScreenshot_from_2019-05-15_14-30-57.pngScreenshot_from_2019-05-15_14-31-25.pngScreenshot_from_2019-05-15_14-31-55.png
Signal cables (long cables, from preamp to digitizer) of channels 13 and 16 were changed. For the moment they have not been relabelled.

We assumed that it was not a HV supply or cable problem, since the anods were aligned and only the dynodes moved.

After changing the cables we realigned the dynodes and recalibrated all signals. Screen shots are attached.
Entry  Tue May 21 02:20:26 2019, A. Algora, Cs measurement, Cs401, 4763 201905211126_137Cs.root
Start: 10:25

Stop: 11:26

lmd: Cs137_source_201905211025_052.dl ...Cs137_source_201905211025_053.dlt
Entry  Fri Jun 7 09:37:15 2019, The same team, Cs for the AIDA synch test 
Start: 17:41

Stop: 18:17

AIDA files: R19_1 (@17:57)
Entry  Fri Jun 7 12:35:14 2019, Jorge, Alvaro, Correlation time AIDA_DTAS for 60Co source AidaDTAS60CoTest.pdf
Files at mars /home/briken/190607AidaTasTest60Co
ELOG V3.1.4-unknown