AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 1 of 11  ELOG logo
ID Date Authordown Subject Text Attachments
  3   Sun Feb 19 12:22:16 2017 td, mdVacuum and detector test------17.2.17 ------------------------------------------------------

closing chamber 
  
  22   Thu Sep 14 14:07:21 2017 pbalignment Chat with survey team

1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with
 2017.11.02_HISO_XT03_EdinburghChamber.pdf 
  19   Thu Sep 14 09:47:02 2017 dkdiscussion with beam operatorsCERN side
     Faraday cup at the end of SEC, ideally
with automated control to insert and remove
  
  26   Mon Sep 25 14:50:46 2017 dkTo do list before main exp. - update from meeting 28th SeptemberNB: This list may be incomplete!

CERN side: 
  
  Draft   Thu Sep 28 03:34:20 2017 dkheavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of
 degrader.pdf 
  28   Thu Sep 28 03:38:18 2017 dkheavy ion degrader foil - updated--original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
 8x 
  29   Wed Oct 4 18:57:16 2017 dkDigitized run notes from tests at CERNTranscription of paper logbook for runs. 
Please check as I cannot read all the writing.
  
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheethttps://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
  
  210   Tue Nov 20 14:07:37 2018 dkBlue Loan Book ScanScan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
 loan-book-scan.pdf 
  211   Tue Nov 20 16:06:09 2018 dkProjected Inventory of ISOLDE(To be confirmed / finalized)

==Rack Electronics==
  
  33   Thu Oct 19 14:41:19 2017 daidheavy ion degrader foil - full / newSee entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
 8x 
  37   Sat Nov 4 14:10:20 2017 daidJulabo chiller operationThis log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
  
  49   Wed Nov 8 22:00:00 2017 daidScalarsPresent scalars:
0: Ungated
1: Gated
  
  113   Sat Nov 11 20:27:28 2017 TD, DK, RG, MBRun 100Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
  
  110   Sat Nov 11 18:06:42 2017 TD, DKRun 98Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
  
  111   Sat Nov 11 18:31:10 2017 TD, DKRun 99Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2
*on*
Ender: Normal run stop
  
  14   Fri Sep 8 19:03:23 2017 TDw26 network configuration
Network configuration files for workstation
w26 (Sun Ultra 45)
 12x 
  15   Fri Sep 8 19:12:19 2017 TDMIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
 7x 
  23   Thu Sep 14 15:40:42 2017 TDMSL type S2 bias data   MSLtypeS2.txt 
  36   Sat Nov 4 06:29:03 2017 TDMIDASsort online sort programs, spectrum titles, calibration s/w & READMEs   IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz 
ELOG V3.1.4-unknown