ID |
Date |
Author |
Subject |
Text |
 |
120
|
Sun Nov 12 09:16:01 2017 |
CLW, PJW, TD | Run 106 | junk - ignore |
|
121
|
Sun Nov 12 09:17:49 2017 |
CLW, PJW, TD | Run 107 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
|
105
|
Sat Nov 11 15:17:24 2017 |
CLW, PJW, RG, TD, MD, DK | Run 95 | Header: Continue with 4.0 MeV/u on Carbon
after laser cleaning
Ender:
|
|
102
|
Sat Nov 11 11:21:22 2017 |
CLW, PJW, RG | Run 92 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
103
|
Sat Nov 11 12:16:28 2017 |
CLW, PJW, RG | Run 93 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
104
|
Sat Nov 11 14:15:12 2017 |
CLW, PJW, RG | Run94 | Header: 3.99 MeV/u and C_25.
Ender: We stop because the lasers are being
cleaned, and we saw the scalars drop. See |
|
122
|
Sun Nov 12 11:19:06 2017 |
CLW, PJW | Run 108 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
|
123
|
Sun Nov 12 13:24:51 2017 |
CLW, PJW | Run 109 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
|
|
101
|
Sat Nov 11 09:20:56 2017 |
CLW, MD, PJW | Run 91 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
159
|
Tue Nov 14 16:00:29 2017 |
CLW, MB, SJL,RG | Run 145 | Header: 5 MeV/u on CH2 33,10,01
Ender: End to allow laser cleaning
====================================================
|
|
155
|
Tue Nov 14 08:09:31 2017 |
CLW | Run 142 | Header: Protons are back, continue 3.6 MeV/u
on CH2
Ender:
|
|
158
|
Tue Nov 14 15:59:42 2017 |
CLW | Run 144 JUNK | valve closed |
|
185
|
Thu Nov 23 13:16:56 2017 |
CLW | Beam energies | Beam energy measurements can be found in
the electronic logbook for ISO-REX-HIE
https://op-webtools.web.cern.ch/elogbook/ |
|
205
|
Wed Nov 7 14:27:45 2018 |
CBH, DK | Beam Plan for Miguel and Alberto (ISOLDE beam operators) |
Presently,
we are scheduled for 9 days:
Nov 26-28
are three (3) days nominally for beam development
|
|
206
|
Thu Nov 8 10:01:32 2018 |
CBH, DK | New Struts Installation | Struts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide |
8x |
190
|
Thu Sep 27 11:14:34 2018 |
CBH | Photos and Measurements from August CERN Trip | Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
|
   |
203
|
Mon Nov 5 13:52:46 2018 |
CBH | CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies | Assuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated: |
|
209
|
Mon Nov 12 11:25:58 2018 |
CBH | Expected Proton Energy Plots | Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E |
   |
79
|
Fri Nov 10 01:29:51 2017 |
ASM, MD, DK | run 75 | Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
|
|
107
|
Sat Nov 11 17:19:54 2017 |
ASM, CL, TD... | halflife | Placed a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate |
|
|