|
ID |
Date |
Author |
Subject |
Text |
 |
|
168
|
Wed Nov 15 07:39:26 2017 |
MD, DK, CLW | End of beamtime, modules reading before turning off | Header: end of beamtime - modules reading
Ender:
==================================================== |
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
|
|
|
29
|
Wed Oct 4 18:57:16 2017 |
dk | Digitized run notes from tests at CERN | Transcription of paper logbook for runs.
Please check as I cannot read all the writing.
|
|
|
18
|
Thu Sep 14 08:37:27 2017 |
Claudia | Detector installation | dE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V
E detector: 3080-23, 1012 |
8x |
|
20
|
Thu Sep 14 10:24:34 2017 |
Claudia | Detector - ADC connection | ADC#1 0-31: p+n dE
ADC#2 32-48: n+n dE
ADC#2 49-64: p+n dE |
|
|
199
|
Thu Oct 25 13:25:16 2018 |
KG | Current gas cell status | (Wrapped up)
Cell b : 15um Al exit, 12.5um Al entrance. |
|
|
203
|
Mon Nov 5 13:52:46 2018 |
CBH | CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies | Assuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated: |
|
|
38
|
Sun Nov 5 20:25:10 2017 |
Ruchi | Circuit diagram and cable mapping | |
  |
|
100
|
Sat Nov 11 07:45:34 2017 |
Claudia | Checking Laser quality | There is an option to see when the beam
is gone if it is due to lasers or due to
the accelerator. |
|
|
54
|
Wed Nov 8 23:46:32 2017 |
Daid | Charge State Distributions | Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
|
    |
|
57
|
Thu Nov 9 05:33:50 2017 |
TD | Charge State Distributions | > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu
|
|
|
198
|
Wed Oct 10 10:57:33 2018 |
DK | Chamber wheel bolt spacing | From Ruchi's friend Rob. |
|
|
86
|
Fri Nov 10 14:48:22 2017 |
TD | Calibration |
ADC offsets calculated using data files R42-r47
|
18x |
|
84
|
Fri Nov 10 08:31:06 2017 |
TD | CAEN V767 TDC trigger/channel 0 logic change | Approximately 5-10% of events overnight were
'bad' i.e. missing TDC data
|
|
|
72
|
Thu Nov 9 17:01:49 2017 |
TD | CAEN V560 Scalers added to datastream | CAEN V560 Scaler channels #0-7 have been added
to the EbyE datastream by adding
per event readout of defined VME registers |
|
|
210
|
Tue Nov 20 14:07:37 2018 |
dk | Blue Loan Book Scan | Scan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
|
|
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission | By the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber: |
|
|
185
|
Thu Nov 23 13:16:56 2017 |
CLW | Beam energies | Beam energy measurements can be found in
the electronic logbook for ISO-REX-HIE
https://op-webtools.web.cern.ch/elogbook/ |
|
|
205
|
Wed Nov 7 14:27:45 2018 |
CBH, DK | Beam Plan for Miguel and Alberto (ISOLDE beam operators) |
Presently,
we are scheduled for 9 days:
Nov 26-28
are three (3) days nominally for beam development
|
|
|
197
|
Tue Oct 9 14:25:54 2018 |
DK | Au foil request to STFC | http://npg.dl.ac.uk/TargetRequests/
https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
|
|