AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 2 of 11  ELOG logo
ID Date Author Subject Text Attachments
  190   Thu Sep 27 11:14:34 2018 CBHPhotos and Measurements from August CERN TripChamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg 
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  187   Thu Aug 23 18:57:15 2018 DKWhat daid is taking from ISOLDE to Edinburgh1 bolt for chamber stand structure, for reference
for new struts.
  
  186   Thu Aug 23 18:23:27 2018 DKWhere to find (our) stuff at ISOLDE=Overview=

Shoes, hard hats, 'underpants', spiders,
 edinburgh-notices-daid.pdf 
  185   Thu Nov 23 13:16:56 2017 CLWBeam energiesBeam energy measurements can be found in
the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/
  
  184   Thu Nov 16 16:24:29 2017 RG CLW MDRun 173 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side, trigger
on HI detector this time
Ender: Change to digital pulser to check
  
  183   Thu Nov 16 16:14:04 2017 RG CLW MDRun 172 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check
as non-linearity was observed at low amplitudes.
  
  182   Thu Nov 16 16:06:07 2017 RG CLW MDRun 171 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  181   Thu Nov 16 15:57:29 2017 RG CLW MDRun 170 Pulse Walkthrough HI p-side Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 10 V in steps of 1, 250 Hz
  
  180   Thu Nov 16 15:43:48 2017 RG CLW MDRun 169 Pulse Walkthrough E n-side Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  179   Thu Nov 16 15:37:35 2017 RG, MD, CLWRun 167 JUNK    
  178   Thu Nov 16 15:33:24 2017 RG CLW MDRun 168 Pulse Walkthrough E p-side Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 6 V in steps of 0.5, 250 Hz
  
  177   Thu Nov 16 15:24:42 2017 RG CLW MDRun 166 Pulse Walkthrough dE n-side Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  176   Thu Nov 16 15:14:39 2017 RG CLW MDRun 165 Pulse Walkthrough dE p-side Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 1.6 V in steps of 0.2, 250 Hz
  
  175   Thu Nov 16 11:20:51 2017 RG CLW MDRun 162 -HI det calibrationHeader: 4alpha source - Heavy Ion detector
calibration
Ender: 
  
  174   Wed Nov 15 16:24:35 2017 RG CLWRun 160 - strip numbering E detectorHeader: 4alpha source off center (to the top)
Ender: 
====================================================
  
  173   Wed Nov 15 16:05:25 2017 RG CLWRun 159 - E detector calibrationHeader: 4alpha source run for E det calubration
Ender: 
====================================================
  
  172   Wed Nov 15 15:41:41 2017 RG CLWRun 157 - EJunkHeader: 4alpha source
Ender: 
====================================================
  
  171   Wed Nov 15 14:18:30 2017 DKIssues and problems encounteredObjective log on perceived issues.  (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
  
ELOG V3.1.4-unknown