AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
ID Date Author Subject Text Attachments
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration   TargetLadder.pdf 
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawingswork in progress.   FullAssemb2.PDFsection.PDF 
  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings   ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF 
  40   Mon Nov 6 10:50:33 2017 Peter Blackfoil mount drawings   SiPD_foil_mount.PDFfOIL_HOLDER.PDF 
  39   Mon Nov 6 10:46:53 2017 Peter BlackFaraday cup drawingsNote that the removal of the supressor
reqires the special allen key.
 Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF 
  38   Sun Nov 5 20:25:10 2017 RuchiCircuit diagram and cable mapping   Cabling.pdfPreampsPCBs.pdfCircuit.pdf 
  37   Sat Nov 4 14:10:20 2017 daidJulabo chiller operationThis log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
  
  36   Sat Nov 4 06:29:03 2017 TDMIDASsort online sort programs, spectrum titles, calibration s/w & READMEs   IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz 
  35   Mon Oct 30 09:46:04 2017 Peter BlackNotes on iris install/operationThe iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the
  
  34   Tue Oct 24 09:27:24 2017 Peter Black, DKSafety words

Plate 1.  Contents of chamber
  
  33   Thu Oct 19 14:41:19 2017 daidheavy ion degrader foil - full / newSee entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
 8x 
  32   Thu Oct 19 10:55:54 2017 ClaudiaMeeting 19.10.CERN-Edinburgh Liaison


FC at end of SEC: manual
Network
access: port free.
N2 gas ? 
-date
  
  31   Thu Oct 12 12:45:54 2017 ClaudiaMeeting 12.10.17Email sent to Karl and Olof about 


FC at end of SEC
Gain
resistor package
Network access
N2
  
  30   Thu Oct 5 11:34:34 2017 ClaudiaMeeting 5.10.17POINTS FOR DISCUSSION

 


Email sent to Karl and
  
  29   Wed Oct 4 18:57:16 2017 dkDigitized run notes from tests at CERNTranscription of paper logbook for runs. 
Please check as I cannot read all the writing.
  
  28   Thu Sep 28 03:38:18 2017 dkheavy ion degrader foil - updated--original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
 8x 
  Draft   Thu Sep 28 03:34:20 2017 dkheavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of
 degrader.pdf 
  26   Mon Sep 25 14:50:46 2017 dkTo do list before main exp. - update from meeting 28th SeptemberNB: This list may be incomplete!

CERN side: 
  
  25   Thu Sep 21 14:54:00 2017 ClaudiaAlpha Calibration SpectraAlpha Calibration Runs (need to check settings
in logbook)

0-63: dE detector and 32-47 is
 Screenshot_from_2017-09-21_14-43-48.pngScreenshot_from_2017-09-21_14-43-17.png 
  24   Tue Sep 19 14:54:47 2017 Claudia, TobySetup Photos   14x 
ELOG V3.1.4-unknown