AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 10 of 11  ELOG logo
ID Date Author Subject Text Attachments
  23   Thu Sep 14 15:40:42 2017 TDMSL type S2 bias data   MSLtypeS2.txt 
  22   Thu Sep 14 14:07:21 2017 pbalignment Chat with survey team

1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with
 2017.11.02_HISO_XT03_EdinburghChamber.pdf 
  21   Thu Sep 14 10:29:25 2017 ClaudiaAlpha CalibrationRun 1-10 Test

14 September 2017

Run 11 Start 18:16
  
  20   Thu Sep 14 10:24:34 2017 ClaudiaDetector - ADC connectionADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
  
  19   Thu Sep 14 09:47:02 2017 dkdiscussion with beam operatorsCERN side
     Faraday cup at the end of SEC, ideally
with automated control to insert and remove
  
  18   Thu Sep 14 08:37:27 2017 ClaudiaDetector installationdE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V

E detector:  3080-23, 1012
 8x 
  Draft   Wed Sep 13 15:28:18 2017   Discussion with ISOLDE staff -> things
to sort out:

1) Removable Faraday Cup between
  
  16   Sat Sep 9 09:39:38 2017 ClaudiaVacuum Readings at ISOLDE HallThursday, 7th September:

Vaccum after pumping all night
preamps off, chiller off
  
  15   Fri Sep 8 19:12:19 2017 TDMIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
 7x 
  14   Fri Sep 8 19:03:23 2017 TDw26 network configuration
Network configuration files for workstation
w26 (Sun Ultra 45)
 12x 
  13   Wed Aug 16 15:30:04 2017 DK, MDShipping Inventory==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
  
  Draft   Wed Aug 16 15:29:57 2017 DKShipping Inventory==BOX A==
VME crate
26 ribbon cables
  
  11   Wed Aug 16 12:53:43 2017 DKTo do / missingPhotodiode
     Electronics
     Foil mount (12 um Al seems okay, but
  
  10   Thu Jun 1 13:09:38 2017 DKTesting email header, part IIChecking some server settings for the elog
system regarding the email notification.
  
  9   Wed May 24 16:18:22 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg 
  Draft   Wed May 24 16:09:10 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg 
  Draft   Wed May 24 15:21:37 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
  
  6   Wed Apr 26 12:10:04 2017 DKTesting email headerI asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog).
  
  5   Tue Apr 18 11:05:43 2017 Mirco / ClaudiaSetup Preparationstatus of the setup - 07/04/2017

status of the setup - 21/04/2017
 ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf 
  4   Tue Mar 14 10:57:20 2017 Claudia Meeting Edinburgh 14 March 10 am 20171) DAQ

We have 192 channels to DAQ working.
Mirco will test the silicon detectors with
  
ELOG V3.1.4-unknown