ID |
Date |
Author |
Subject |
Text |
|
23
|
Thu Sep 14 15:40:42 2017 |
TD | MSL type S2 bias data | |
|
22
|
Thu Sep 14 14:07:21 2017 |
pb | alignment | Chat with survey team
1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with |
|
21
|
Thu Sep 14 10:29:25 2017 |
Claudia | Alpha Calibration | Run 1-10 Test
14 September 2017
Run 11 Start 18:16 |
|
20
|
Thu Sep 14 10:24:34 2017 |
Claudia | Detector - ADC connection | ADC#1 0-31: p+n dE
ADC#2 32-48: n+n dE
ADC#2 49-64: p+n dE |
|
19
|
Thu Sep 14 09:47:02 2017 |
dk | discussion with beam operators | CERN side
Faraday cup at the end of SEC, ideally
with automated control to insert and remove
|
|
18
|
Thu Sep 14 08:37:27 2017 |
Claudia | Detector installation | dE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V
E detector: 3080-23, 1012 |
8x |
Draft
|
Wed Sep 13 15:28:18 2017 |
| | Discussion with ISOLDE staff -> things
to sort out:
1) Removable Faraday Cup between |
|
16
|
Sat Sep 9 09:39:38 2017 |
Claudia | Vacuum Readings at ISOLDE Hall | Thursday, 7th September:
Vaccum after pumping all night
preamps off, chiller off |
|
15
|
Fri Sep 8 19:12:19 2017 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
|
7x |
14
|
Fri Sep 8 19:03:23 2017 |
TD | w26 network configuration |
Network configuration files for workstation
w26 (Sun Ultra 45)
|
12x |
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
|
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
|
|
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but |
|
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog
system regarding the email notification.
|
|
9
|
Wed May 24 16:18:22 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
Draft
|
Wed May 24 16:09:10 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
Draft
|
Wed May 24 15:21:37 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog). |
|
5
|
Tue Apr 18 11:05:43 2017 |
Mirco / Claudia | Setup Preparation | status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
|
4
|
Tue Mar 14 10:57:20 2017 |
Claudia | Meeting Edinburgh 14 March 10 am 2017 | 1) DAQ
We have 192 channels to DAQ working.
Mirco will test the silicon detectors with |
|