  211   Tue Nov 20 16:06:09 2018 dkProjected Inventory of ISOLDE(To be confirmed / finalized)

==Rack Electronics==
  
  210   Tue Nov 20 14:07:37 2018 dkBlue Loan Book ScanScan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
 loan-book-scan.pdf 
  209   Mon Nov 12 11:25:58 2018 CBHExpected Proton Energy Plots Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
 ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png 
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheethttps://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
  
  206   Thu Nov 8 10:01:32 2018 CBH, DKNew Struts InstallationStruts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide
 8x 
  205   Wed Nov 7 14:27:45 2018 CBH, DKBeam Plan for Miguel and Alberto (ISOLDE beam operators)




Presently,
we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  203   Mon Nov 5 13:52:46 2018 CBHCoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energiesAssuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated:
  
  202   Fri Nov 2 17:01:16 2018 DKInventory going to CERN by easyJetConor will take:

==Black clicker case==
  
  201   Wed Oct 31 16:01:33 2018 DKMeasuring foil thicknessA couple scans from my notes which may be
useful.
 DOC_(4).PDFDOC_(5).PDF 
  200   Wed Oct 31 14:50:36 2018 DKStrut shipping infohttp://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL   
  199   Thu Oct 25 13:25:16 2018 KGCurrent gas cell status(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance. 
  
  198   Wed Oct 10 10:57:33 2018 DKChamber wheel bolt spacingFrom Ruchi's friend Rob.  WhatsApp_Image_2018-10-10_at_09.14.43.jpeg 
  197   Tue Oct 9 14:25:54 2018 DKAu foil request to STFChttp://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
 NPG_-_Online_Target_Request.pdf 
  196   Tue Oct 9 10:40:13 2018 DKTo-do Meeting Notes: July, August, September, OctoberEach month's notes are attached.  Unfinished
business naturally carries over to the next
month.
 6x 
  195   Mon Oct 8 17:02:47 2018 DKTarget ladder photo from previous experimentFrom Alex, attached.  IMG_1274.jpg 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supportsThese are used to connect the gas cell to
the target ladder.  We only had the one,
and it would be more convenient if each gas
 gas_cell_support.PDF 
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell testsin_atmosphere.png : schematic for testing
gas-cell in atmosphere
 in_atmosphere.pngFeedthrough.png 
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement requestFor posterity

==========
 edinburgh-chamber-query.pdf 
  190   Thu Sep 27 11:14:34 2018 CBHPhotos and Measurements from August CERN TripChamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg 
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  187   Thu Aug 23 18:57:15 2018 DKWhat daid is taking from ISOLDE to Edinburgh1 bolt for chamber stand structure, for reference
for new struts.
  
  186   Thu Aug 23 18:23:27 2018 DKWhere to find (our) stuff at ISOLDE=Overview=

Shoes, hard hats, 'underpants', spiders,
 edinburgh-notices-daid.pdf 
  185   Thu Nov 23 13:16:56 2017 CLWBeam energiesBeam energy measurements can be found in
the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/
  
  184   Thu Nov 16 16:24:29 2017 RG CLW MDRun 173 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side, trigger
on HI detector this time
Ender: Change to digital pulser to check
  
  183   Thu Nov 16 16:14:04 2017 RG CLW MDRun 172 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check
as non-linearity was observed at low amplitudes.
  
  182   Thu Nov 16 16:06:07 2017 RG CLW MDRun 171 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  181   Thu Nov 16 15:57:29 2017 RG CLW MDRun 170 Pulse Walkthrough HI p-side Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 10 V in steps of 1, 250 Hz
  
  180   Thu Nov 16 15:43:48 2017 RG CLW MDRun 169 Pulse Walkthrough E n-side Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  179   Thu Nov 16 15:37:35 2017 RG, MD, CLWRun 167 JUNK    
  178   Thu Nov 16 15:33:24 2017 RG CLW MDRun 168 Pulse Walkthrough E p-side Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 6 V in steps of 0.5, 250 Hz
  
  177   Thu Nov 16 15:24:42 2017 RG CLW MDRun 166 Pulse Walkthrough dE n-side Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  176   Thu Nov 16 15:14:39 2017 RG CLW MDRun 165 Pulse Walkthrough dE p-side Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 1.6 V in steps of 0.2, 250 Hz
  
  175   Thu Nov 16 11:20:51 2017 RG CLW MDRun 162 -HI det calibrationHeader: 4alpha source - Heavy Ion detector
calibration
Ender: 
  
  174   Wed Nov 15 16:24:35 2017 RG CLWRun 160 - strip numbering E detectorHeader: 4alpha source off center (to the top)
Ender: 
====================================================
  
  173   Wed Nov 15 16:05:25 2017 RG CLWRun 159 - E detector calibrationHeader: 4alpha source run for E det calubration
Ender: 
====================================================
  
  172   Wed Nov 15 15:41:41 2017 RG CLWRun 157 - EJunkHeader: 4alpha source
Ender: 
====================================================
  
  171   Wed Nov 15 14:18:30 2017 DKIssues and problems encounteredObjective log on perceived issues.  (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
  
  169   Wed Nov 15 11:33:31 2017 RG CLWRun 155 - calibration del EHeader: 4alpha source run for delE detector
calibration
Ender: 
  
  168   Wed Nov 15 07:39:26 2017 MD, DK, CLWEnd of beamtime, modules reading before turning offHeader: end of beamtime - modules reading
Ender: 
====================================================
  
  167   Wed Nov 15 05:26:46 2017 DK, MD, CLWRun 153Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
  
  166   Wed Nov 15 03:25:08 2017 MD,DKRun 152Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
  
  165   Wed Nov 15 01:02:59 2017 DK, MDRun 151Header: Continue with 5.0 MeV/
Ender: 
====================================================
 171115_protonquickdrop.jpg 
  164   Tue Nov 14 23:07:06 2017 MD, DKRun 150Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
  
  163   Tue Nov 14 20:56:33 2017 SL, MB, DK, MDRun 149Header: 5 MeV/u on CH2_33+10+01
Ender: End
====================================================
  
  162   Tue Nov 14 20:13:10 2017 SL, MB, DKRun 148Header: 5 MeV/u on empty frame
Ender: 
====================================================
  
  161   Tue Nov 14 18:35:59 2017 SL, MBRun 147Header: 5 MeV/u on C_09 
Ender: 
====================================================
  
  160   Tue Nov 14 18:30:11 2017 SL, MBRun 146Junk   
  159   Tue Nov 14 16:00:29 2017 CLW, MB, SJL,RGRun 145Header: 5 MeV/u on CH2 33,10,01
Ender:  End to allow laser cleaning
====================================================
  
  158   Tue Nov 14 15:59:42 2017 CLWRun 144 JUNKvalve closed   
  157   Tue Nov 14 14:30:51 2017 SLPhotos inside chamber (detectors, IRIS, etc)   OneDrive-2017-11-14_2.zip 
  155   Tue Nov 14 08:09:31 2017 CLWRun 142Header: Protons are back, continue 3.6 MeV/u
on CH2
Ender: 
  
  154   Tue Nov 14 07:04:13 2017 DK, MD, CLRun 140Header: Protons are back, continue 3.5 MeV/u
on CH2
Ender: 
  
  153   Tue Nov 14 06:22:29 2017 DK, MDRun 139Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
  
  152   Tue Nov 14 06:18:32 2017 MD, DKRun 137, 138 - JunkThe newly started runs were stopped by MIDAS
- bad clicking mouse...
  
  151   Tue Nov 14 04:16:18 2017 MD, DKRun 136
Header: CH2_33+10+01 with 3.5 MeV/u
Ender: 
  
  150   Tue Nov 14 02:16:10 2017 DK, MDRun 135Header: Back to CH2 with 3.5 MeV/u
Ender: 
====================================================
  
  149   Tue Nov 14 01:41:17 2017 MD, DKRun 134
Header: 3.5 MeV/u on Empty frame
Ender: Stop
  
  148   Tue Nov 14 00:41:22 2017 MD, DKRun 133
Header: 3.5 MeV/u on C_09
Ender: 
  
  147   Mon Nov 13 23:12:50 2017 MD, DKRun 132Header: Continue CH2 with 3.5 MeV/u
Ender: 
====================================================
  
  145   Mon Nov 13 20:52:03 2017 SL RG DKRun 131
Header: CH2 #33_10_01, beam energy
3.5 MeV/u
Ender: 
====================================================
Run
number : 131
Date : 13/11/17
Start
  
  144   Mon Nov 13 19:09:53 2017 SL RGRun 129Junk - double pressed stop acquisition   
  143   Mon Nov 13 19:05:20 2017 SL RGRun 130
Header: CH2 #33_10_01, beam energy
3.5 MeV/u
Ender: 
====================================================
Run
number : 130
Date : 13/11/17
Start
  
  142   Mon Nov 13 17:23:16 2017 RG SLRun 128Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
  
  141   Mon Nov 13 15:06:09 2017 MB, CLW, SJLRun 127
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  140   Mon Nov 13 14:25:20 2017 MB, CLW, SJLRun 126
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh
  
  139   Mon Nov 13 12:10:18 2017 MB, CLW, SJLRun 125
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  138   Mon Nov 13 10:10:52 2017 MB, CLW, SJL, PJWRun 124
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  137   Mon Nov 13 10:01:39 2017 MB, CLW, SJL, PJWRun 123 JUNKJUNK   
  136   Mon Nov 13 07:23:23 2017 MB, CLWRun 122
Header: CH2 #16, beam energy 4.4
Ender: 
  
  135   Mon Nov 13 06:08:52 2017 MD, RGRun 121
Header: CH2 #16, beam energy 4.4
Ender: 
  
  134   Mon Nov 13 06:06:23 2017 MD, RGRun 120 - junkDouble klick on stopp, so it jumped to 121.
R120 file should be empty or non existing.
  
  133   Mon Nov 13 03:52:48 2017 MD, RGRun 119
Header: CH2 #16, beam energy 4.4
Ender: 
  
  132   Mon Nov 13 02:59:37 2017 RG MDRun 118 - shortHeader: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
  
  131   Mon Nov 13 00:57:24 2017 MD, DK, RGRun 117Header: 4.4 MeV/u on @ CH2
Ender: 
====================================================
  
  130   Mon Nov 13 00:12:24 2017 RG MD DKRun 116Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
  
  129   Sun Nov 12 23:52:10 2017 DK, MD, RGRun 115 - shortHeader: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
  
  128   Sun Nov 12 23:51:34 2017 MD, DK, RGRun 114 - JunkDouble clicked the start / stop so it is blank.   
  127   Sun Nov 12 21:27:23 2017 DK, MBRun 113Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
  
  126   Sun Nov 12 18:32:52 2017 MB DK run 112Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
  
  125   Sun Nov 12 17:44:49 2017 MB DK RGrun 111Header:  empty target, 4.4 MeV/u
Ender: End
====================================================
  
  124   Sun Nov 12 15:34:39 2017 DK, MBRun 110Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
  
  123   Sun Nov 12 13:24:51 2017 CLW, PJWRun 109Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
  
  122   Sun Nov 12 11:19:06 2017 CLW, PJWRun 108Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
  121   Sun Nov 12 09:17:49 2017 CLW, PJW, TDRun 107Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
  120   Sun Nov 12 09:16:01 2017 CLW, PJW, TDRun 106junk - ignore   
  118   Sun Nov 12 06:23:36 2017 RG MBRun 105Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy
from 4.0MeV/u to 4.29MeV/u
  
  117   Sun Nov 12 04:22:57 2017 RG MBRun 104Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: 
====================================================
  
  116   Sun Nov 12 01:46:23 2017 RG MBRun 103Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off.
Noticed on the HI det scalar
  
  115   Sun Nov 12 01:28:26 2017 RG MBRun 102 - JunkHeader: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity
tripped
  
  114   Sat Nov 11 23:30:25 2017 RG MBRun 101
Header: CH2 #30+25, Beam energy 4.0
MeV/u
Ender: 
====================================================
Run
number : 101
Date : 12/11/2017
Start
  
  113   Sat Nov 11 20:27:28 2017 TD, DK, RG, MBRun 100Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
  
  112   Sat Nov 11 19:35:28 2017 TDMIDAS DAQ configuration & MIDAS logs 1-11.11.17   16x 
  111   Sat Nov 11 18:31:10 2017 TD, DKRun 99Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2
*on*
Ender: Normal run stop
  
  110   Sat Nov 11 18:06:42 2017 TD, DKRun 98Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
  
  109   Sat Nov 11 17:45:10 2017 DK, TD, ASM, RG, MDRun 97Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger
  
  108   Sat Nov 11 17:36:54 2017 ASMmore halflife stuffFitting those half life data more reasonably...
fitted the decay curve with y=a*exp(-b*t)+c
to all the data points, comes up with t1/2=(85.8+/-2.6)s
 Screen_Shot_2017-11-11_at_18.38.37.png 
  107   Sat Nov 11 17:19:54 2017 ASM, CL, TD...halflifePlaced a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate
 Screen_Shot_2017-11-11_at_18.25.54.png 
  106   Sat Nov 11 17:08:50 2017 RG, DK, CL, TD, AM, MDRun 96Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
  
  105   Sat Nov 11 15:17:24 2017 CLW, PJW, RG, TD, MD, DKRun 95Header: Continue with 4.0 MeV/u on Carbon
after laser cleaning
Ender: 
  
  104   Sat Nov 11 14:15:12 2017 CLW, PJW, RGRun94Header: 3.99 MeV/u and C_25. 
Ender: We stop because the lasers are being
cleaned, and we saw the scalars drop.  See
  
  103   Sat Nov 11 12:16:28 2017 CLW, PJW, RGRun 93
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  102   Sat Nov 11 11:21:22 2017 CLW, PJW, RGRun 92
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  101   Sat Nov 11 09:20:56 2017 CLW, MD, PJWRun 91
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  100   Sat Nov 11 07:45:34 2017 ClaudiaChecking Laser qualityThere is an option to see when the beam
is gone if it is due to lasers or due to
the accelerator.
  
  99   Sat Nov 11 07:44:16 2017 MD, CLW, PJWRun 90
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
 171111_0858_Laser_optimizedcondition.jpg 
  98   Sat Nov 11 06:57:14 2017 MD, CLW, PJWRun 89
Header: 3.99 MeV/u and CH2_30+25. Continue
after Laser update (cleaning), but still
 171111_0828_beamisback.jpg 
  97   Sat Nov 11 05:49:00 2017 AM & MDrun 88Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
  
  96   Sat Nov 11 03:58:58 2017 MD, ASMRun 87
Header: 3.99 MeV/u and CH2_30+25.
Ender: 
 171111_0638_beamcurrentdown.jpg 
  95   Sat Nov 11 01:40:48 2017 MD, DMK, ASMRun 86
Header: 3.99 MeV/u and CH2_30+25. Continue
after reheat the primary target (GPS) between
 171111_0344_Beamcurrent.jpg171111_0435_Beamcurrent.jpg171111_0440_Laser_02.jpg171111_0440_Laser_03.jpg171111_0441_Laser_04.jpg 
  93   Sat Nov 11 00:24:19 2017 MD, ASM, DMKRun 85
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down
  
  92   Sat Nov 11 00:01:41 2017 Daid. MircoTrigger and scalars for 4.0 MeV/uTom et al. tuned the trigger this evening,
before we began the runs.  (Run 82, or Run
83??)
  
  91   Fri Nov 10 21:59:05 2017 SL, MDRun 84
Header: 3.99 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 84
Date : 10/11 to 11/11
Start
  
  90   Fri Nov 10 20:30:57 2017 SLRun 83 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Recompiling sort code.
====================================================
Run
  
  89   Fri Nov 10 19:57:49 2017 SLRun 82
Header: 3.99 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 82
Date : 10/11
Start time :
  
  88   Fri Nov 10 19:01:13 2017 SLRun 81 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Stopped to check E hardware.
====================================================
Run
  
  87   Fri Nov 10 16:32:19 2017 ClaudiaRAL Amplitude ThresholdsThresholds of RAL amplifiers set to: dE
30mV; E 20 mV, HI 20 mV
  
  86   Fri Nov 10 14:48:22 2017 TDCalibration
ADC offsets calculated using data files R42-r47
 18x 
  85   Fri Nov 10 10:46:54 2017 SLInvestigation of E detector thicknessWhile changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
  
  84   Fri Nov 10 08:31:06 2017 TDCAEN V767 TDC trigger/channel 0 logic changeApproximately 5-10% of events overnight were
'bad' i.e. missing TDC data
  
  83   Fri Nov 10 07:00:14 2017 MD, CLW, ASM, TDRun 80
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg 
  82   Fri Nov 10 04:53:34 2017 MD, ASMRun 79Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
 171110_only2of4cycles_problemRing2.jpg 
  81   Fri Nov 10 04:18:41 2017 MD, ASMRun 78Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
  
  80   Fri Nov 10 02:12:06 2017 MD, ASM, DKRun 77
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting
  
  79   Fri Nov 10 01:29:51 2017 ASM, MD, DKrun 75Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
  
  78   Thu Nov 9 23:10:38 2017 MDpreparation for Carbon C_09 (Run 75)10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
  
  77   Thu Nov 9 21:31:16 2017 SLRun 74
Header: 4.7 MeV/u and CH2_30+25. 
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time :
 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png 
  76   Thu Nov 9 20:46:29 2017 SLRun 73
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run
 Screen_Shot_2017-11-09_at_22.38.49.png 
  75   Thu Nov 9 19:06:08 2017 SLRun 68-71JUNK   
  74   Thu Nov 9 18:56:13 2017 SLRun 72
Header: 4.7 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 72
Date : 09/11
Start time :
  
  73   Thu Nov 9 17:35:32 2017 RGRun 67
Header: 4.7 MeV/u and CH2_30+25. 
Ender:

====================================================
Run
number : 67
Date : 09/11
Start time :
  
  72   Thu Nov 9 17:01:49 2017 TDCAEN V560 Scalers added to datastreamCAEN V560 Scaler channels #0-7 have been added
to the EbyE datastream by adding
per event readout of defined VME registers
  
  71   Thu Nov 9 16:30:15 2017 SLRun 66
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:

====================================================
Run
  
  70   Thu Nov 9 15:55:56 2017 SLRun 65
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender: 
====================================================
Run
  
  69   Thu Nov 9 15:34:14 2017 SLRun 64
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (JUST E, not HI, now ~50% live time)
Ender:
Stopping as trigger seems slightly off
====================================================
Run
  
  68   Thu Nov 9 15:03:21 2017 SLRun 63
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (dE+E, not HI, now ~50% live time)
Ender:

====================================================
Run
  
  67   Thu Nov 9 12:15:33 2017 SLTIMBER: Faraday Cup MeasurementsFaraday Cup (at end of Edinburgh chamber) measurements
recorded in TIMBER (from approx 10.00 9/11/17).
  
  66   Thu Nov 9 12:14:05 2017 SLRun 62
Header: 4.7 MeV/u and CH2_30+25. 
Ender:

====================================================
Run
number : 62
Date : 9 / 11
Start time :
  
  65   Thu Nov 9 10:15:38 2017 Sarah LonsdaleRun 61
Header: 5.0 MeV/u and Carbon (C_25).

Ender: 
====================================================
Run
number : 61
Date : 9 / 11
Start time :
  
  64   Thu Nov 9 09:49:03 2017 Sarah LonsdaleRun 60
Header: 5.0 MeV/u and Empty Frame.
 Tuned beam to lower scatter, solved dE counting
issue. Pulser scaler has been added.
Ender:
  
  62   Thu Nov 9 08:20:21 2017 ClaudiaRestarting Target Current & Line Current0) If target or line drop, STOP THE BEAM!!

1) If you SEE target or line current
go down (top right window of monitors next
  
  61   Thu Nov 9 07:15:49 2017 MDTips for Babysitting ISOLDE during shiftsfrom ISOLDE webpage  Babysitting_ISOLDE_from_the_CCC.pdf 
  60   Thu Nov 9 06:30:35 2017 Daid, MircoSpectra (Shift 1)Screen shots for accumulated data before the
target went down.  Should be (at least) runs
53 & 54 inclusive, possibly back to the start
 12x 
  59   Thu Nov 9 06:02:41 2017 Daid. MircoRun 57Header: Continue with 5.0 MeV/u and CH2. 
Laser back on.
Ender: 
  
  58   Thu Nov 9 05:35:44 2017 Daid. MircoRun 56
Header: 5.0 MeV/u CH2, Laser 2 is turned
off on purpose to check background.
  
  57   Thu Nov 9 05:33:50 2017 TDCharge State Distributions > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu 
  
  56   Thu Nov 9 03:32:55 2017 Daid. MircoRun 55Header: Continue 5.0 MeV/u with CH2 after
target re-heating
Ender: End
 gps-r55.jpgpsb-run55.jpg 
  55   Thu Nov 9 01:24:01 2017 Daid. MircoRun 54Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.
 Target current is 2 A (low...should be 430
  
  54   Wed Nov 8 23:46:32 2017 DaidCharge State Distributions Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
 charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg 
  53   Wed Nov 8 23:14:38 2017 Daid, Ruchi, MircoRun 53Header: Restart 5.0 MeV/u w/ CH2 after PS
comes back (3 rings until the morning)
Ender: End
  
  52   Wed Nov 8 23:06:48 2017 Daid, RuchiRun 52 (junk)(Junk -- see comments)
====================================================
Run number : 52
  
  51   Wed Nov 8 22:21:35 2017 RuchiBeam transmissionBy the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber:
  
  50   Wed Nov 8 22:08:55 2017 DaidRun 51Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with
a smaller file size for fast analysis, as
  
  49   Wed Nov 8 22:00:00 2017 daidScalarsPresent scalars:
0: Ungated
1: Gated
  
  48   Wed Nov 8 21:21:31 2017 Ruchi Garg, DaidRunLogTemplateHeader:
Ender: 
====================================================
  
  47   Wed Nov 8 20:46:23 2017 Daid, RuchiRun 50Header: First run with irises open.  30 min
run.
Ender: Call from PS-Booster.  Stop run.
  
  46   Wed Nov 8 20:40:33 2017 Daid, RuchiRun 49Header: First test with RIB.  Irises closed.
End: End
  
  45   Wed Nov 8 17:12:01 2017 TDMIDAS logsAttachment 1 - snoop -d bge1 log following
MVME CPU reset
 snoop.logvmecpu.log 
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration   TargetLadder.pdf 
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawingswork in progress.   FullAssemb2.PDFsection.PDF 
  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings   ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF 
  40   Mon Nov 6 10:50:33 2017 Peter Blackfoil mount drawings   SiPD_foil_mount.PDFfOIL_HOLDER.PDF 
  39   Mon Nov 6 10:46:53 2017 Peter BlackFaraday cup drawingsNote that the removal of the supressor
reqires the special allen key.
 Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF 
  38   Sun Nov 5 20:25:10 2017 RuchiCircuit diagram and cable mapping   Cabling.pdfPreampsPCBs.pdfCircuit.pdf 
  37   Sat Nov 4 14:10:20 2017 daidJulabo chiller operationThis log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
  
  36   Sat Nov 4 06:29:03 2017 TDMIDASsort online sort programs, spectrum titles, calibration s/w & READMEs   IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz 
  35   Mon Oct 30 09:46:04 2017 Peter BlackNotes on iris install/operationThe iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the
  
  34   Tue Oct 24 09:27:24 2017 Peter Black, DKSafety words

Plate 1.  Contents of chamber
  
  33   Thu Oct 19 14:41:19 2017 daidheavy ion degrader foil - full / newSee entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
 8x 
  32   Thu Oct 19 10:55:54 2017 ClaudiaMeeting 19.10.CERN-Edinburgh Liaison


FC at end of SEC: manual
Network
access: port free.
N2 gas ? 
-date
  
  31   Thu Oct 12 12:45:54 2017 ClaudiaMeeting 12.10.17Email sent to Karl and Olof about 


FC at end of SEC
Gain
resistor package
Network access
N2
  
  30   Thu Oct 5 11:34:34 2017 ClaudiaMeeting 5.10.17POINTS FOR DISCUSSION

 


Email sent to Karl and
  
  29   Wed Oct 4 18:57:16 2017 dkDigitized run notes from tests at CERNTranscription of paper logbook for runs. 
Please check as I cannot read all the writing.
  
  28   Thu Sep 28 03:38:18 2017 dkheavy ion degrader foil - updated--original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
 8x 
  Draft   Thu Sep 28 03:34:20 2017 dkheavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of
 degrader.pdf 
  26   Mon Sep 25 14:50:46 2017 dkTo do list before main exp. - update from meeting 28th SeptemberNB: This list may be incomplete!

CERN side: 
  
  25   Thu Sep 21 14:54:00 2017 ClaudiaAlpha Calibration SpectraAlpha Calibration Runs (need to check settings
in logbook)

0-63: dE detector and 32-47 is
 Screenshot_from_2017-09-21_14-43-48.pngScreenshot_from_2017-09-21_14-43-17.png 
  24   Tue Sep 19 14:54:47 2017 Claudia, TobySetup Photos   14x 
  23   Thu Sep 14 15:40:42 2017 TDMSL type S2 bias data   MSLtypeS2.txt 
  22   Thu Sep 14 14:07:21 2017 pbalignment Chat with survey team

1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with
 2017.11.02_HISO_XT03_EdinburghChamber.pdf 
  21   Thu Sep 14 10:29:25 2017 ClaudiaAlpha CalibrationRun 1-10 Test

14 September 2017

Run 11 Start 18:16
  
  20   Thu Sep 14 10:24:34 2017 ClaudiaDetector - ADC connectionADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
  
  19   Thu Sep 14 09:47:02 2017 dkdiscussion with beam operatorsCERN side
     Faraday cup at the end of SEC, ideally
with automated control to insert and remove
  
  18   Thu Sep 14 08:37:27 2017 ClaudiaDetector installationdE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V

E detector:  3080-23, 1012
 8x 
  Draft   Wed Sep 13 15:28:18 2017   Discussion with ISOLDE staff -> things
to sort out:

1) Removable Faraday Cup between
  
  16   Sat Sep 9 09:39:38 2017 ClaudiaVacuum Readings at ISOLDE HallThursday, 7th September:

Vaccum after pumping all night
preamps off, chiller off
  
  15   Fri Sep 8 19:12:19 2017 TDMIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
 7x 
  14   Fri Sep 8 19:03:23 2017 TDw26 network configuration
Network configuration files for workstation
w26 (Sun Ultra 45)
 12x 
  13   Wed Aug 16 15:30:04 2017 DK, MDShipping Inventory==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
  
  Draft   Wed Aug 16 15:29:57 2017 DKShipping Inventory==BOX A==
VME crate
26 ribbon cables
  
  11   Wed Aug 16 12:53:43 2017 DKTo do / missingPhotodiode
     Electronics
     Foil mount (12 um Al seems okay, but
  
  10   Thu Jun 1 13:09:38 2017 DKTesting email header, part IIChecking some server settings for the elog
system regarding the email notification.
  
  9   Wed May 24 16:18:22 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg 
  Draft   Wed May 24 16:09:10 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg 
  Draft   Wed May 24 15:21:37 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
  
  6   Wed Apr 26 12:10:04 2017 DKTesting email headerI asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog).
  
  5   Tue Apr 18 11:05:43 2017 Mirco / ClaudiaSetup Preparationstatus of the setup - 07/04/2017

status of the setup - 21/04/2017
 ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf 
  4   Tue Mar 14 10:57:20 2017 Claudia Meeting Edinburgh 14 March 10 am 20171) DAQ

We have 192 channels to DAQ working.
Mirco will test the silicon detectors with
  
  3   Sun Feb 19 12:22:16 2017 td, mdVacuum and detector test------17.2.17 ------------------------------------------------------

closing chamber 
  
  2   Fri Jan 27 11:33:10 2017 DKTesting email serverTinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
  
  1   Fri Jan 27 11:02:03 2017 DK, PBNotes from visit to CERNHere I am simply digitizing my notes from
our visit to CERN 17~18 January 2017.  They
may not be perfectly linear or organized,
  
ELOG V3.1.4-unknown