211
|
Tue Nov 20 16:06:09 2018 |
dk | Projected Inventory of ISOLDE | (To be confirmed / finalized)
==Rack Electronics==
|
|
210
|
Tue Nov 20 14:07:37 2018 |
dk | Blue Loan Book Scan | Scan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
|
|
209
|
Mon Nov 12 11:25:58 2018 |
CBH | Expected Proton Energy Plots | Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E |
   |
208
|
Sat Nov 10 18:48:04 2018 |
dk | Travel schedule spreadsheet | https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
|
|
206
|
Thu Nov 8 10:01:32 2018 |
CBH, DK | New Struts Installation | Struts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide |
8x |
205
|
Wed Nov 7 14:27:45 2018 |
CBH, DK | Beam Plan for Miguel and Alberto (ISOLDE beam operators) |
Presently,
we are scheduled for 9 days:
Nov 26-28
are three (3) days nominally for beam development
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
|
|
203
|
Mon Nov 5 13:52:46 2018 |
CBH | CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies | Assuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated: |
|
202
|
Fri Nov 2 17:01:16 2018 |
DK | Inventory going to CERN by easyJet | Conor will take:
==Black clicker case==
|
|
201
|
Wed Oct 31 16:01:33 2018 |
DK | Measuring foil thickness | A couple scans from my notes which may be
useful.
|
 |
200
|
Wed Oct 31 14:50:36 2018 |
DK | Strut shipping info | http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
|
199
|
Thu Oct 25 13:25:16 2018 |
KG | Current gas cell status | (Wrapped up)
Cell b : 15um Al exit, 12.5um Al entrance. |
|
198
|
Wed Oct 10 10:57:33 2018 |
DK | Chamber wheel bolt spacing | From Ruchi's friend Rob. |
|
197
|
Tue Oct 9 14:25:54 2018 |
DK | Au foil request to STFC | http://npg.dl.ac.uk/TargetRequests/
https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
|
|
196
|
Tue Oct 9 10:40:13 2018 |
DK | To-do Meeting Notes: July, August, September, October | Each month's notes are attached. Unfinished
business naturally carries over to the next
month.
|
6x |
195
|
Mon Oct 8 17:02:47 2018 |
DK | Target ladder photo from previous experiment | From Alex, attached. |
|
194
|
Mon Oct 8 12:07:18 2018 |
DK | Gas cell check with He sniffer | Notes from an email:
Tested the chamber with the leak checker. |
|
193
|
Mon Oct 8 12:05:25 2018 |
DK, PB | Gas cell supports | These are used to connect the gas cell to
the target ladder. We only had the one,
and it would be more convenient if each gas |
|
192
|
Thu Oct 4 13:07:33 2018 |
KG | Schematics for gas-cell tests | in_atmosphere.png : schematic for testing
gas-cell in atmosphere
|
 |
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
|
|
190
|
Thu Sep 27 11:14:34 2018 |
CBH | Photos and Measurements from August CERN Trip | Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
|
   |
189
|
Mon Sep 24 14:44:48 2018 |
DK | ISOLDE vacuum schematic | Attached. PDF is produced with Gnome Dia
-- source file attached as well.
|
 |
188
|
Thu Aug 30 15:14:50 2018 |
DK | Gate Valve | Some notes on the broken gate valve that should
go between SEC and our chamber at XT03. |
  |
187
|
Thu Aug 23 18:57:15 2018 |
DK | What daid is taking from ISOLDE to Edinburgh | 1 bolt for chamber stand structure, for reference
for new struts.
|
|
186
|
Thu Aug 23 18:23:27 2018 |
DK | Where to find (our) stuff at ISOLDE | =Overview=
Shoes, hard hats, 'underpants', spiders, |
|
185
|
Thu Nov 23 13:16:56 2017 |
CLW | Beam energies | Beam energy measurements can be found in
the electronic logbook for ISO-REX-HIE
https://op-webtools.web.cern.ch/elogbook/ |
|
184
|
Thu Nov 16 16:24:29 2017 |
RG CLW MD | Run 173 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side, trigger
on HI detector this time
Ender: Change to digital pulser to check |
|
183
|
Thu Nov 16 16:14:04 2017 |
RG CLW MD | Run 172 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check
as non-linearity was observed at low amplitudes. |
|
182
|
Thu Nov 16 16:06:07 2017 |
RG CLW MD | Run 171 Pulse Walkthrough HI n-side | Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width |
|
181
|
Thu Nov 16 15:57:29 2017 |
RG CLW MD | Run 170 Pulse Walkthrough HI p-side | Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 10 V in steps of 1, 250 Hz
|
|
180
|
Thu Nov 16 15:43:48 2017 |
RG CLW MD | Run 169 Pulse Walkthrough E n-side | Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width |
|
179
|
Thu Nov 16 15:37:35 2017 |
RG, MD, CLW | Run 167 JUNK | |
|
178
|
Thu Nov 16 15:33:24 2017 |
RG CLW MD | Run 168 Pulse Walkthrough E p-side | Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 6 V in steps of 0.5, 250 Hz
|
|
177
|
Thu Nov 16 15:24:42 2017 |
RG CLW MD | Run 166 Pulse Walkthrough dE n-side | Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width |
|
176
|
Thu Nov 16 15:14:39 2017 |
RG CLW MD | Run 165 Pulse Walkthrough dE p-side | Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 1.6 V in steps of 0.2, 250 Hz
|
|
175
|
Thu Nov 16 11:20:51 2017 |
RG CLW MD | Run 162 -HI det calibration | Header: 4alpha source - Heavy Ion detector
calibration
Ender:
|
|
174
|
Wed Nov 15 16:24:35 2017 |
RG CLW | Run 160 - strip numbering E detector | Header: 4alpha source off center (to the top)
Ender:
====================================================
|
|
173
|
Wed Nov 15 16:05:25 2017 |
RG CLW | Run 159 - E detector calibration | Header: 4alpha source run for E det calubration
Ender:
====================================================
|
|
172
|
Wed Nov 15 15:41:41 2017 |
RG CLW | Run 157 - EJunk | Header: 4alpha source
Ender:
====================================================
|
|
171
|
Wed Nov 15 14:18:30 2017 |
DK | Issues and problems encountered | Objective log on perceived issues. (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
|
|
169
|
Wed Nov 15 11:33:31 2017 |
RG CLW | Run 155 - calibration del E | Header: 4alpha source run for delE detector
calibration
Ender:
|
|
168
|
Wed Nov 15 07:39:26 2017 |
MD, DK, CLW | End of beamtime, modules reading before turning off | Header: end of beamtime - modules reading
Ender:
==================================================== |
|
167
|
Wed Nov 15 05:26:46 2017 |
DK, MD, CLW | Run 153 | Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
|
|
166
|
Wed Nov 15 03:25:08 2017 |
MD,DK | Run 152 | Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
|
|
165
|
Wed Nov 15 01:02:59 2017 |
DK, MD | Run 151 | Header: Continue with 5.0 MeV/
Ender:
====================================================
|
|
164
|
Tue Nov 14 23:07:06 2017 |
MD, DK | Run 150 | Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
|
|
163
|
Tue Nov 14 20:56:33 2017 |
SL, MB, DK, MD | Run 149 | Header: 5 MeV/u on CH2_33+10+01
Ender: End
====================================================
|
|
162
|
Tue Nov 14 20:13:10 2017 |
SL, MB, DK | Run 148 | Header: 5 MeV/u on empty frame
Ender:
====================================================
|
|
161
|
Tue Nov 14 18:35:59 2017 |
SL, MB | Run 147 | Header: 5 MeV/u on C_09
Ender:
====================================================
|
|
160
|
Tue Nov 14 18:30:11 2017 |
SL, MB | Run 146 | Junk |
|
159
|
Tue Nov 14 16:00:29 2017 |
CLW, MB, SJL,RG | Run 145 | Header: 5 MeV/u on CH2 33,10,01
Ender: End to allow laser cleaning
====================================================
|
|
158
|
Tue Nov 14 15:59:42 2017 |
CLW | Run 144 JUNK | valve closed |
|
157
|
Tue Nov 14 14:30:51 2017 |
SL | Photos inside chamber (detectors, IRIS, etc) | |
|
155
|
Tue Nov 14 08:09:31 2017 |
CLW | Run 142 | Header: Protons are back, continue 3.6 MeV/u
on CH2
Ender:
|
|
154
|
Tue Nov 14 07:04:13 2017 |
DK, MD, CL | Run 140 | Header: Protons are back, continue 3.5 MeV/u
on CH2
Ender:
|
|
153
|
Tue Nov 14 06:22:29 2017 |
DK, MD | Run 139 | Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
|
|
152
|
Tue Nov 14 06:18:32 2017 |
MD, DK | Run 137, 138 - Junk | The newly started runs were stopped by MIDAS
- bad clicking mouse... |
|
151
|
Tue Nov 14 04:16:18 2017 |
MD, DK | Run 136 |
Header: CH2_33+10+01 with 3.5 MeV/u
Ender:
|
|
150
|
Tue Nov 14 02:16:10 2017 |
DK, MD | Run 135 | Header: Back to CH2 with 3.5 MeV/u
Ender:
====================================================
|
|
149
|
Tue Nov 14 01:41:17 2017 |
MD, DK | Run 134 |
Header: 3.5 MeV/u on Empty frame
Ender: Stop
|
|
148
|
Tue Nov 14 00:41:22 2017 |
MD, DK | Run 133 |
Header: 3.5 MeV/u on C_09
Ender:
|
|
147
|
Mon Nov 13 23:12:50 2017 |
MD, DK | Run 132 | Header: Continue CH2 with 3.5 MeV/u
Ender:
====================================================
|
|
145
|
Mon Nov 13 20:52:03 2017 |
SL RG DK | Run 131 |
Header: CH2 #33_10_01, beam energy
3.5 MeV/u
Ender:
====================================================
Run
number : 131
Date : 13/11/17
Start |
|
144
|
Mon Nov 13 19:09:53 2017 |
SL RG | Run 129 | Junk - double pressed stop acquisition |
|
143
|
Mon Nov 13 19:05:20 2017 |
SL RG | Run 130 |
Header: CH2 #33_10_01, beam energy
3.5 MeV/u
Ender:
====================================================
Run
number : 130
Date : 13/11/17
Start |
|
142
|
Mon Nov 13 17:23:16 2017 |
RG SL | Run 128 | Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
|
|
141
|
Mon Nov 13 15:06:09 2017 |
MB, CLW, SJL | Run 127 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
140
|
Mon Nov 13 14:25:20 2017 |
MB, CLW, SJL | Run 126 |
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh |
|
139
|
Mon Nov 13 12:10:18 2017 |
MB, CLW, SJL | Run 125 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
138
|
Mon Nov 13 10:10:52 2017 |
MB, CLW, SJL, PJW | Run 124 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
137
|
Mon Nov 13 10:01:39 2017 |
MB, CLW, SJL, PJW | Run 123 JUNK | JUNK |
|
136
|
Mon Nov 13 07:23:23 2017 |
MB, CLW | Run 122 |
Header: CH2 #16, beam energy 4.4
Ender:
|
|
135
|
Mon Nov 13 06:08:52 2017 |
MD, RG | Run 121 |
Header: CH2 #16, beam energy 4.4
Ender:
|
|
134
|
Mon Nov 13 06:06:23 2017 |
MD, RG | Run 120 - junk | Double klick on stopp, so it jumped to 121.
R120 file should be empty or non existing. |
|
133
|
Mon Nov 13 03:52:48 2017 |
MD, RG | Run 119 |
Header: CH2 #16, beam energy 4.4
Ender:
|
|
132
|
Mon Nov 13 02:59:37 2017 |
RG MD | Run 118 - short | Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
|
|
131
|
Mon Nov 13 00:57:24 2017 |
MD, DK, RG | Run 117 | Header: 4.4 MeV/u on @ CH2
Ender:
====================================================
|
|
130
|
Mon Nov 13 00:12:24 2017 |
RG MD DK | Run 116 | Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
|
|
129
|
Sun Nov 12 23:52:10 2017 |
DK, MD, RG | Run 115 - short | Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
|
|
128
|
Sun Nov 12 23:51:34 2017 |
MD, DK, RG | Run 114 - Junk | Double clicked the start / stop so it is blank. |
|
127
|
Sun Nov 12 21:27:23 2017 |
DK, MB | Run 113 | Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
|
|
126
|
Sun Nov 12 18:32:52 2017 |
MB DK | run 112 | Header: 4.4 MeV/u CH2_16 sample
Ender:
====================================================
|
|
125
|
Sun Nov 12 17:44:49 2017 |
MB DK RG | run 111 | Header: empty target, 4.4 MeV/u
Ender: End
====================================================
|
|
124
|
Sun Nov 12 15:34:39 2017 |
DK, MB | Run 110 | Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
|
|
123
|
Sun Nov 12 13:24:51 2017 |
CLW, PJW | Run 109 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
|
|
122
|
Sun Nov 12 11:19:06 2017 |
CLW, PJW | Run 108 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
|
121
|
Sun Nov 12 09:17:49 2017 |
CLW, PJW, TD | Run 107 | Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
|
120
|
Sun Nov 12 09:16:01 2017 |
CLW, PJW, TD | Run 106 | junk - ignore |
|
118
|
Sun Nov 12 06:23:36 2017 |
RG MB | Run 105 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: run ends OK to change beam energy
from 4.0MeV/u to 4.29MeV/u
|
|
117
|
Sun Nov 12 04:22:57 2017 |
RG MB | Run 104 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender:
====================================================
|
|
116
|
Sun Nov 12 01:46:23 2017 |
RG MB | Run 103 | Header: CH2 #30+25, beam energy 4.0 MeV/u
Ender: Run stopped as the beam went off.
Noticed on the HI det scalar
|
|
115
|
Sun Nov 12 01:28:26 2017 |
RG MB | Run 102 - Junk | Header: CH2 #30+25, Beam energy 4.0 MeV/u
Ender: Run stopped short as the RF cavity
tripped
|
|
114
|
Sat Nov 11 23:30:25 2017 |
RG MB | Run 101 |
Header: CH2 #30+25, Beam energy 4.0
MeV/u
Ender:
====================================================
Run
number : 101
Date : 12/11/2017
Start |
|
113
|
Sat Nov 11 20:27:28 2017 |
TD, DK, RG, MB | Run 100 | Header: Continue CH2 at 4.0 MeV/u
Ender:
====================================================
|
|
112
|
Sat Nov 11 19:35:28 2017 |
TD | MIDAS DAQ configuration & MIDAS logs 1-11.11.17 | |
16x |
111
|
Sat Nov 11 18:31:10 2017 |
TD, DK | Run 99 | Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2
*on*
Ender: Normal run stop
|
|
110
|
Sat Nov 11 18:06:42 2017 |
TD, DK | Run 98 | Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
|
|
109
|
Sat Nov 11 17:45:10 2017 |
DK, TD, ASM, RG, MD | Run 97 | Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger
|
|
108
|
Sat Nov 11 17:36:54 2017 |
ASM | more halflife stuff | Fitting those half life data more reasonably...
fitted the decay curve with y=a*exp(-b*t)+c
to all the data points, comes up with t1/2=(85.8+/-2.6)s |
|
107
|
Sat Nov 11 17:19:54 2017 |
ASM, CL, TD... | halflife | Placed a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate |
|
106
|
Sat Nov 11 17:08:50 2017 |
RG, DK, CL, TD, AM, MD | Run 96 | Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
|
|
105
|
Sat Nov 11 15:17:24 2017 |
CLW, PJW, RG, TD, MD, DK | Run 95 | Header: Continue with 4.0 MeV/u on Carbon
after laser cleaning
Ender:
|
|
104
|
Sat Nov 11 14:15:12 2017 |
CLW, PJW, RG | Run94 | Header: 3.99 MeV/u and C_25.
Ender: We stop because the lasers are being
cleaned, and we saw the scalars drop. See |
|
103
|
Sat Nov 11 12:16:28 2017 |
CLW, PJW, RG | Run 93 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
102
|
Sat Nov 11 11:21:22 2017 |
CLW, PJW, RG | Run 92 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
101
|
Sat Nov 11 09:20:56 2017 |
CLW, MD, PJW | Run 91 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
100
|
Sat Nov 11 07:45:34 2017 |
Claudia | Checking Laser quality | There is an option to see when the beam
is gone if it is due to lasers or due to
the accelerator. |
|
99
|
Sat Nov 11 07:44:16 2017 |
MD, CLW, PJW | Run 90 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
98
|
Sat Nov 11 06:57:14 2017 |
MD, CLW, PJW | Run 89 |
Header: 3.99 MeV/u and CH2_30+25. Continue
after Laser update (cleaning), but still |
|
97
|
Sat Nov 11 05:49:00 2017 |
AM & MD | run 88 | Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
|
|
96
|
Sat Nov 11 03:58:58 2017 |
MD, ASM | Run 87 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
|
|
95
|
Sat Nov 11 01:40:48 2017 |
MD, DMK, ASM | Run 86 |
Header: 3.99 MeV/u and CH2_30+25. Continue
after reheat the primary target (GPS) between |
    |
93
|
Sat Nov 11 00:24:19 2017 |
MD, ASM, DMK | Run 85 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down |
|
92
|
Sat Nov 11 00:01:41 2017 |
Daid. Mirco | Trigger and scalars for 4.0 MeV/u | Tom et al. tuned the trigger this evening,
before we began the runs. (Run 82, or Run
83??)
|
|
91
|
Fri Nov 10 21:59:05 2017 |
SL, MD | Run 84 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 84
Date : 10/11 to 11/11
Start |
|
90
|
Fri Nov 10 20:30:57 2017 |
SL | Run 83 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
Recompiling sort code.
====================================================
Run |
|
89
|
Fri Nov 10 19:57:49 2017 |
SL | Run 82 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 82
Date : 10/11
Start time : |
|
88
|
Fri Nov 10 19:01:13 2017 |
SL | Run 81 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
Stopped to check E hardware.
====================================================
Run |
|
87
|
Fri Nov 10 16:32:19 2017 |
Claudia | RAL Amplitude Thresholds | Thresholds of RAL amplifiers set to: dE
30mV; E 20 mV, HI 20 mV |
|
86
|
Fri Nov 10 14:48:22 2017 |
TD | Calibration |
ADC offsets calculated using data files R42-r47
|
18x |
85
|
Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness | While changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through. |
|
84
|
Fri Nov 10 08:31:06 2017 |
TD | CAEN V767 TDC trigger/channel 0 logic change | Approximately 5-10% of events overnight were
'bad' i.e. missing TDC data
|
|
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
|
 |
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
|
|
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
|
|
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting |
|
79
|
Fri Nov 10 01:29:51 2017 |
ASM, MD, DK | run 75 | Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
|
|
78
|
Thu Nov 9 23:10:38 2017 |
MD | preparation for Carbon C_09 (Run 75) | 10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
|
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time : |
  |
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run |
|
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
|
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 72
Date : 09/11
Start time : |
|
73
|
Thu Nov 9 17:35:32 2017 |
RG | Run 67 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 67
Date : 09/11
Start time : |
|
72
|
Thu Nov 9 17:01:49 2017 |
TD | CAEN V560 Scalers added to datastream | CAEN V560 Scaler channels #0-7 have been added
to the EbyE datastream by adding
per event readout of defined VME registers |
|
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run |
|
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender:
====================================================
Run |
|
69
|
Thu Nov 9 15:34:14 2017 |
SL | Run 64 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (JUST E, not HI, now ~50% live time)
Ender:
Stopping as trigger seems slightly off
====================================================
Run |
|
68
|
Thu Nov 9 15:03:21 2017 |
SL | Run 63 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run |
|
67
|
Thu Nov 9 12:15:33 2017 |
SL | TIMBER: Faraday Cup Measurements | Faraday Cup (at end of Edinburgh chamber) measurements
recorded in TIMBER (from approx 10.00 9/11/17). |
|
66
|
Thu Nov 9 12:14:05 2017 |
SL | Run 62 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 62
Date : 9 / 11
Start time : |
|
65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run
number : 61
Date : 9 / 11
Start time : |
|
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame.
Tuned beam to lower scatter, solved dE counting
issue. Pulser scaler has been added.
Ender: |
|
62
|
Thu Nov 9 08:20:21 2017 |
Claudia | Restarting Target Current & Line Current | 0) If target or line drop, STOP THE BEAM!!
1) If you SEE target or line current
go down (top right window of monitors next |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) | Screen shots for accumulated data before the
target went down. Should be (at least) runs
53 & 54 inclusive, possibly back to the start |
12x |
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 | Header: Continue with 5.0 MeV/u and CH2.
Laser back on.
Ender:
|
|
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned
off on purpose to check background.
|
|
57
|
Thu Nov 9 05:33:50 2017 |
TD | Charge State Distributions | > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu
|
|
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 | Header: Continue 5.0 MeV/u with CH2 after
target re-heating
Ender: End
|
 |
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 | Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.
Target current is 2 A (low...should be 430 |
|
54
|
Wed Nov 8 23:46:32 2017 |
Daid | Charge State Distributions | Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
|
    |
53
|
Wed Nov 8 23:14:38 2017 |
Daid, Ruchi, Mirco | Run 53 | Header: Restart 5.0 MeV/u w/ CH2 after PS
comes back (3 rings until the morning)
Ender: End
|
|
52
|
Wed Nov 8 23:06:48 2017 |
Daid, Ruchi | Run 52 (junk) | (Junk -- see comments)
====================================================
Run number : 52
|
|
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission | By the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber: |
|
50
|
Wed Nov 8 22:08:55 2017 |
Daid | Run 51 | Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run. We want good data with
a smaller file size for fast analysis, as |
|
49
|
Wed Nov 8 22:00:00 2017 |
daid | Scalars | Present scalars:
0: Ungated
1: Gated
|
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate | Header:
Ender:
====================================================
|
|
47
|
Wed Nov 8 20:46:23 2017 |
Daid, Ruchi | Run 50 | Header: First run with irises open. 30 min
run.
Ender: Call from PS-Booster. Stop run.
|
|
46
|
Wed Nov 8 20:40:33 2017 |
Daid, Ruchi | Run 49 | Header: First test with RIB. Irises closed.
End: End
|
|
45
|
Wed Nov 8 17:12:01 2017 |
TD | MIDAS logs | Attachment 1 - snoop -d bge1 log following
MVME CPU reset
|
 |
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration | |
|
43
|
Mon Nov 6 16:12:47 2017 |
Peter Black | chamber drawings | work in progress. |
 |
41
|
Mon Nov 6 10:52:58 2017 |
Peter Black | alignment hardware drawings | |
   |
40
|
Mon Nov 6 10:50:33 2017 |
Peter Black | foil mount drawings | |
 |
39
|
Mon Nov 6 10:46:53 2017 |
Peter Black | Faraday cup drawings | Note that the removal of the supressor
reqires the special allen key. |
   |
38
|
Sun Nov 5 20:25:10 2017 |
Ruchi | Circuit diagram and cable mapping | |
  |
37
|
Sat Nov 4 14:10:20 2017 |
daid | Julabo chiller operation | This log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
|
|
36
|
Sat Nov 4 06:29:03 2017 |
TD | MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs | |
  |
35
|
Mon Oct 30 09:46:04 2017 |
Peter Black | Notes on iris install/operation | The iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the |
|
34
|
Tue Oct 24 09:27:24 2017 |
Peter Black, DK | Safety words |
Plate 1. Contents of chamber |
|
33
|
Thu Oct 19 14:41:19 2017 |
daid | heavy ion degrader foil - full / new | See entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
|
8x |
32
|
Thu Oct 19 10:55:54 2017 |
Claudia | Meeting 19.10. | CERN-Edinburgh Liaison
FC at end of SEC: manual
Network
access: port free.
N2 gas ?
-date |
|
31
|
Thu Oct 12 12:45:54 2017 |
Claudia | Meeting 12.10.17 | Email sent to Karl and Olof about
FC at end of SEC
Gain
resistor package
Network access
N2 |
|
30
|
Thu Oct 5 11:34:34 2017 |
Claudia | Meeting 5.10.17 | POINTS FOR DISCUSSION
Email sent to Karl and |
|
29
|
Wed Oct 4 18:57:16 2017 |
dk | Digitized run notes from tests at CERN | Transcription of paper logbook for runs.
Please check as I cannot read all the writing.
|
|
28
|
Thu Sep 28 03:38:18 2017 |
dk | heavy ion degrader foil - updated | --original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
|
8x |
Draft
|
Thu Sep 28 03:34:20 2017 |
dk | heavy ion degrader foil |
--text from email--
Using Claudia's code, I added a layer of |
|
26
|
Mon Sep 25 14:50:46 2017 |
dk | To do list before main exp. - update from meeting 28th September | NB: This list may be incomplete!
CERN side:
|
|
25
|
Thu Sep 21 14:54:00 2017 |
Claudia | Alpha Calibration Spectra | Alpha Calibration Runs (need to check settings
in logbook)
0-63: dE detector and 32-47 is |
 |
24
|
Tue Sep 19 14:54:47 2017 |
Claudia, Toby | Setup Photos | |
14x |
23
|
Thu Sep 14 15:40:42 2017 |
TD | MSL type S2 bias data | |
|
22
|
Thu Sep 14 14:07:21 2017 |
pb | alignment | Chat with survey team
1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with |
|
21
|
Thu Sep 14 10:29:25 2017 |
Claudia | Alpha Calibration | Run 1-10 Test
14 September 2017
Run 11 Start 18:16 |
|
20
|
Thu Sep 14 10:24:34 2017 |
Claudia | Detector - ADC connection | ADC#1 0-31: p+n dE
ADC#2 32-48: n+n dE
ADC#2 49-64: p+n dE |
|
19
|
Thu Sep 14 09:47:02 2017 |
dk | discussion with beam operators | CERN side
Faraday cup at the end of SEC, ideally
with automated control to insert and remove
|
|
18
|
Thu Sep 14 08:37:27 2017 |
Claudia | Detector installation | dE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V
E detector: 3080-23, 1012 |
8x |
Draft
|
Wed Sep 13 15:28:18 2017 |
| | Discussion with ISOLDE staff -> things
to sort out:
1) Removable Faraday Cup between |
|
16
|
Sat Sep 9 09:39:38 2017 |
Claudia | Vacuum Readings at ISOLDE Hall | Thursday, 7th September:
Vaccum after pumping all night
preamps off, chiller off |
|
15
|
Fri Sep 8 19:12:19 2017 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
|
7x |
14
|
Fri Sep 8 19:03:23 2017 |
TD | w26 network configuration |
Network configuration files for workstation
w26 (Sun Ultra 45)
|
12x |
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
|
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
|
|
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but |
|
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog
system regarding the email notification.
|
|
9
|
Wed May 24 16:18:22 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
   |
Draft
|
Wed May 24 16:09:10 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
 |
Draft
|
Wed May 24 15:21:37 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog). |
|
5
|
Tue Apr 18 11:05:43 2017 |
Mirco / Claudia | Setup Preparation | status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
 |
4
|
Tue Mar 14 10:57:20 2017 |
Claudia | Meeting Edinburgh 14 March 10 am 2017 | 1) DAQ
We have 192 channels to DAQ working.
Mirco will test the silicon detectors with |
|
3
|
Sun Feb 19 12:22:16 2017 |
td, md | Vacuum and detector test | ------17.2.17 ------------------------------------------------------
closing chamber
|
|
2
|
Fri Jan 27 11:33:10 2017 |
DK | Testing email server | Tinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
|
|
1
|
Fri Jan 27 11:02:03 2017 |
DK, PB | Notes from visit to CERN | Here I am simply digitizing my notes from
our visit to CERN 17~18 January 2017. They