Sat Nov 11 00:01:41 2017 |
Daid. Mirco | Trigger and scalars for 4.0 MeV/u | Tom et al. tuned the trigger this evening, before we began the runs. (Run 82, or Run 83??)
===TRIGGER===
Trigger condition is: E OR HI/ds
We count the CAMAC OR signals as follows: A,B
A: Which CAMAC module? Left to right, 1,2,3,4,5
B: Which module channel? This is the number engraved on the module by the LEMO output.
==E Definition==
All p-n sides of E detector:
RAL 109 discrim cable numbers: 4, 5, 7
=> Corresponds to CAMAC OR Numbers 2,2; 2,1; 3,1, respectively.
==HI/ds Definition==
All p-n sides of HI detector: 8, 9, 11
RAL 109 discrim cable numbers
=> Corresponds to CAMAC OR Numbers 4,3; 4,2; 5,3, respectively.
ds=Downscale; ds factor is 8 = 2^8 = 256
===SCALARS===
0: Ungated
1: Gated
2: dE (n-n) [Cable 3]
3: E (n-n) [Cable 6]
4: HI (n-n) [Cable 10]
5: Pulser
6: Clock
===DISCUSSION===
The n-n side of the E detector seems to be noisier than the p-n side. Thus the p-n side is used for the trigger logic, whilst the n-n side is used for the scalar.
However, there seems to be something confusing about using the p-n side for the true trigger but the n-n side for the scalars. It means we cannot compare the scalars self-
consistently to each other. That is, the gated or ungated signals do not have a strong correlation with the individual detector scalars. In principle if we have enough LEMO
cables and Fan In/Fan Out modules, we should simply propagate the p-n signals to both the trigger (when relevant, i.e. E detector) and the scalars alike. For now we don't
touch anything, though. |
208
|
Sat Nov 10 18:48:04 2018 |
dk | Travel schedule spreadsheet | https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
https://tinyurl.com/isolde-44ti |
196
|
Tue Oct 9 10:40:13 2018 |
DK | To-do Meeting Notes: July, August, September, October | Each month's notes are attached. Unfinished business naturally carries over to the next month.
This elog will be updated with new notes as necessary.
NB: These are the notes composed *prior* to the meeting, thus do not include any suggestions or corrections. |
Attachment 1: 2018-07-todo.txt
|
ISOLDE 44Ti meeting notes
19 Jul 2018
==To be ordered==
*Entrance window foils, TBD
6um Ti from Goodfellow?
*Gas bottles at CERN - Helium and (likely) Argon.
ISOLDE might provide them, but they never did for N2 gas
Gas bottle will need a regulator (new or old one)
*Spanners to help repair water chiller leak.
We need the right imperial size (x2) for Swagelok.
Sizes? Email says 2x 9/16" but let's confirm
*High precision balance
No new updates. Do we really need it?
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
Responsible: Peter, Daid, CERN Vacuum Team ...
The old one had a leak, likely from the O-ring
(Automated fast-acting gate valve could be required)
At some point, we may have to decide w/o input
Path of least resistance: fix existing one
(The old manual one should be around Peter's office...what's the beam pipe size?)
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Teflon chamber feet stands
Responsible: Toby Fu
The original foot engraving diameter was too small, by mistake. The chamber could be shifted after alignment
But what are the design specifications?
EMAIL Mirco TO PICK THEM UP FOR US FROM ISOLDE
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Alpha scattering in SSDs is another option
*Photodiode degrader foil for isobaric check
Which Al foil(s) are prepared?
In Edinburgh or CERN?
What thickness is sufficient for 44Sc / 44Ti separation?
*Gas cell entrance window material / thickness
==Work==
*Decide beam energies
Responsible: Conor, Alex, Daid
1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available
*Model effect of beam spot size.
Responsible: Conor
~3 mm FWHM was achieved for 59Cu
*Gas cell
Responsible: Katie, Conor
Vacuum system is set up in Edinburgh, and He gas is available
He gas bottle needs a mounting support prior to use.
Everything is in Physics Stores
We can continue to investigate true leak rate, gas cell handling, assembly
Gas cell eventually needs to go to CERN.
Are we satisfied with the setup, or shall we get new parts?
(e.g. several new valves, ...)
*Chamber alignment
Responsible: Peter Black
Chamber is currently disconnected from the beam line.
Previously, we contacted the survey team to come assist.
*DAQ PC has any further issues to get on the network?
Responsible: Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
|
Attachment 2: 2018-08-todo.txt
|
ISOLDE 44Ti meeting notes
28 Aug 2018
==To be ordered==
*Entrance window foils, TBD
3um Ti from Goodfellow? Is it light-tight?
*Gas bottles at CERN - Helium and (likely) Argon.
ISOLDE might provide them, but they never did for N2 gas
Gas bottle will need a regulator (new or old one)
*Spanners to help repair water chiller leak.
*FIRST CHECK VACUUM, CHILLER!*
NB: Might damage piping during re-assembly
We need the right imperial size (x2) for Swagelok.
Sizes? Email says 2x 9/16" but let's confirm
*High precision balance -- no need to buy
We are welcome to use the one in the chem lab on 2nd floor
Just wear a lab coat, and don't move other people's stuff
*PPE (Safety)
Boots and hardhats for new members
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
Responsible: Peter, Daid, Conor, Katie, ...
The old one had a leak, we don't know where
It's on top of Peter's PC in his office
Students can test in Edinburgh...once leak is identified:
Fix ourselves or send to Lesker?
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Take additional Pre-amp to CERN for Photodiode?
There are several in the Miniball cupboard...
*Teflon chamber feet stands
Responsible: Toby, Mirco, Daid
The original foot engraving diameter was too small, by mistake.
But what are the design specifications?
(Mirco picked these up for us, so they are in Germany?)
*Chamber stand wheel struts
Responsible: Peter, Daid, ...
Original ones are damaged at the ends, and also too long
Maria suggested 120 cm. We measured ~121 cm opening towards garage
To make less top-heavy, we can add a lower shelf and stack weight on it
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Total integrated current, with efficiency-calibrated Ge detector
Talk to Liam?
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Alpha scattering in SSDs is another option
*Photodiode degrader foil for isobaric check
10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
What thickness is sufficient for 44Sc / 44Ti separation?
(...or other suspected contamination...)
*Gas cell entrance window material / thickness
*Target ladder setup
How many targets can fit & what should they be?
3 mm collimator
Photodiodes (takes two slots)
Viewing screen (?)
1 mm collimator (?)
Blank target frame (?)
==Work==
*Determine beam energies
Responsible: Conor, Alex, Daid, Karl, Alberto, ...
1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available
Karl mentioned the possibility of a beam test.
Previous beam was 44Ti+13. 40Ar may be a good pilot?
*Model effect of beam spot size -- still relevant?
Responsible: Conor
~3 mm FWHM was achieved for 59Cu
*Gas cell
Responsible: Katie, Conor
Vacuum system is set up in Edinburgh, and He gas is available
He gas bottle needs regulator, that's it.
Gas cell eventually needs to go to CERN.
Are we satisfied with the setup, or shall we get new parts?
(e.g. several new valves, ...)
*Chamber alignment
Responsible: Peter Black
Chamber is currently disconnected from the beam line.
Previously, we contacted the survey team to come assist.
Alignment parts are all at CERN.
*DAQ PC has any further issues to get on the network?
Responsible: Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
|
Attachment 3: 2018-09-todo.txt
|
ISOLDE 44Ti meeting notes
27 Sept 2018
==To be ordered==
*Entrance window foils, TBD
4um Ti from Goodfellow?
9, 12 um Al from Goodfellow?
(Some existing queries regarding Havar, et al.)
*Gas bottles at CERN - Helium and (likely) Argon.
ISOLDE might provide them, but they never did for N2 gas
Gas bottle will need a regulator (new or old one)
*Spanners to help repair water chiller leak.
*FIRST CHECK VACUUM, CHILLER!*
NB: Might damage piping during re-assembly
We need the right imperial size (x2) for Swagelok.
Sizes? Email says 2x 9/16" but let's confirm
*High precision balance
Daid still needs to show Katie and Conor where the room is and what to do.
We are welcome to use the one in the chem lab on 2nd floor
Just wear a lab coat, and don't move other people's stuff
*PPE (Safety)
Boots and hardhats for new members
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
Responsible: (Your name here)
Lesker quotes £123 for a repair kit. Check the elog. Does anyone volunteer?
New one has arrived - plan to leak check it
We need a KF-50 to ~ KF-25 (need to check) converter
*Photodiodes
Responsible: Daid
We have 3 at CERN, but no more in Edinburgh. Order more!
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Katie, Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Katie, Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Take additional Pre-amp to CERN for Photodiode?
There are several in the Miniball cupboard...
*Teflon chamber feet stands
Responsible: Toby, Daid
The original foot engraving diameter was too small, by mistake.
They are at Daid's desk, with tracings of the proper size.
*Chamber stand wheel struts
Responsible: Peter, Daid, Conor, Ruchi
Original ones are damaged at the ends, and also too long
Maria suggested 120 cm. We measured ~121 cm opening towards garage
To make less top-heavy, we can add a lower shelf and stack weight on it
Need a measurement of bolt spacing, Ruchi has a friend who can help us.
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Total integrated current, with efficiency-calibrated Ge detector
Talk to Liam?
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Daid should contact Paul Morrall
Alpha scattering in SSDs is most preferred.
*Photodiode degrader foil for isobaric check
10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
What thickness is sufficient for 44Sc / 44Ti separation?
(...or other suspected contamination...)
*Gas cell entrance window material / thickness
*Target ladder setup
How many targets can fit & what should they be?
3 mm collimator
Photodiodes (takes two slots)
Viewing screen (?)
1 mm collimator (?)
Blank target frame (?)
==Work==
*Determine beam energies
Responsible: Conor, Alex, Daid, Karl, Alberto, ...
1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available
Karl mentioned the possibility of a beam test.
Previous beam was 44Ti+13. 40Ar may be a good pilot?
WE AWAIT ALBERTO'S OPTICS CALCS & CRYO MODULE SCHEDULE.
*Model effect of beam spot size -- still relevant?
Responsible: Conor
~3 mm FWHM was achieved for 59Cu
*Gas cell
Responsible: Katie, Conor
Vacuum system is set up in Edinburgh, and He gas is available
Gas cell eventually needs to go to CERN.
New needle valves and some piping for the gas flow control.
*Chamber alignment
Responsible: Peter Black
Chamber is currently disconnected from the beam line.
Previously, we contacted the survey team to come assist.
Alignment parts are all at CERN.
*DAQ PC has any further issues to get on the network?
Responsible: Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
|
Attachment 4: 2018-10-todo.txt
|
ISOLDE 44Ti meeting notes
09 Oct 2018
==To be ordered==
*Windows
Done
*Gas bottles at CERN - Helium and (likely) Argon.
Gas bottle will need a regulator (new or old one)
Emailed Karl to inquire. N2 necessary?
*Spanners to help repair water chiller leak.
Done
*PPE (Safety)
Boots and hardhats for new members
*New valves for gas flow system
*Gas cell stands for each gas cell
Order was submitted.
*Photodiodes
We have 3 at CERN, but no more in Edinburgh. Order more!
*Au foils
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
Responsible: (Your name here)
Lesker quotes £123 for a repair kit. Do we give up?
New one has arrived - plan to leak check it
Converter flange to check w/ He sniffer ordered, not arrived.
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Katie, Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Katie, Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Take additional Pre-amp to CERN for Photodiode?
There are several in the Miniball cupboard...
*Teflon chamber feet stands
Done
*Chamber stand wheel struts
Responsible: Peter, Daid, Conor, Ruchi
Original ones are damaged at the ends, and also too long
Maria suggested 120 cm. We measured ~121 cm opening towards garage
To make less top-heavy, we can add a lower shelf and stack weight on it
Need a measurement of bolt spacing, Ruchi has a friend who can help us.
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Total integrated current, with efficiency-calibrated Ge detector
Talk to Liam?
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Daid should contact Paul Morrall
Alpha scattering in SSDs is most preferred.
*Photodiode degrader foil for isobaric check
10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
What thickness is sufficient for 44Sc / 44Ti separation?
(...or other suspected contamination...)
Need to know the beam energies! This is quick work.
*Target ladder setup
How many targets can fit & what should they be?
3 mm collimator
Photodiodes (takes two slots)
Viewing screen (?)
1 mm collimator (?)
Blank target frame (?)
==Work==
*Gas cell
Responsible: Katie, Conor
Vacuum system is set up in Edinburgh, and He gas is available
Gas cell eventually needs to go to CERN.
New needle valves and some piping for the gas flow control.
Many windows, washers, etc are now ready to go!
**Window material / thickness
9, 12.5 um Al arrived.
3 um Ti arrived, some holes but maybe serviceable
6 um Ti had order mixup
We can get Havar in 2 weeks privately
*Chamber alignment
Responsible: Peter Black
Chamber is currently disconnected from the beam line.
Previously, we contacted the survey team to come assist.
Alignment parts are all at CERN.
*DAQ PC has any further issues to get on the network?
Responsible: Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
|
Attachment 5: 2018-10-23-todo.txt
|
ISOLDE 44Ti meeting notes
23 Oct 2018
==To be ordered==
*Gas bottles at CERN - Helium and (likely) Argon.
Gas bottles for He, Ar can be supplied by CERN
N2 was also approved, but bear in mind volume required
*Spanners to help repair water chiller leak.
Ordered but did they arrive?
*PPE (Safety)
Boots and hardhats for new members
*New valves for gas flow system
*Gas cell stands for each gas cell
Order was submitted.
*Photodiodes
Order of 10 to arrive 7 Nov
*Au foils
Order placed with Paul at STFC
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
New one has arrived - plan to leak check it
Converter flange to check w/ He sniffer ordered arrived
Awaiting clamps that were ordererd
Repair kit was ordered.
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Katie, Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Katie, Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Take additional Pre-amp to CERN for Photodiode?
There are several in the Miniball cupboard...
*Teflon chamber feet stands - done
*Chamber stand wheel struts
Responsible: Peter, Daid
We have the necessary preparations, we await Peter.
We will use 118 cm since garage direction is ~121 cm
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Total integrated current, with efficiency-calibrated Ge detector
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Alpha scattering in SSDs is most preferred.
*Photodiode degrader foil for isobaric check
10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
What thickness is sufficient for 44Sc / 44Ti separation?
(...or other suspected contamination...)
Need to know the beam energies! This is quick work.
*Target ladder setup -- IMPORTANT
How many targets can fit & what should they be?
3 mm collimator
Photodiodes (takes two slots)
Viewing screen (?)
1 mm collimator (?)
Blank target frame (?)
==Work==
*Gas cell
Responsible: Katie, Conor
Gas cell eventually needs to go to CERN.
New needle valves and some piping for the gas flow control.
**Window material / thickness
9, 12.5 um Al
3, 6 um Ti
2.5 um Havar
3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.
*Chamber alignment
Responsible: Peter Black
Previously, we contacted the survey team to come assist.
Alignment parts are all at CERN.
*DAQ PC has any further issues to get on the network?
Responsible: Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
|
Attachment 6: 2018-10-31-todo.txt
|
ISOLDE 44Ti meeting notes
31 Oct 2018
==ENSAR2 status==
We have some information from people, but not enough.
When is the deadline?
==Meetings at CERN next week==
*Beam energy w/ Alberto
*Crane use w/ Olof
*Survey team w/ Peter Skypes
*RILIS people for laser ideas
*Find Liam if we need the alpha source
==To be ordered==
*PPE (Safety)
Boots and hardhats for new members
*New valves for gas flow system
Done. Peter will help weld it up later.
*Gas cell stands for each gas cell
Order is completed. We are awaiting M2 screws now.
*Photodiodes
Order of 10 to arrive 7 Nov
*Au foils
Paul at STFC confirmed the order.
==To be repaired / replaced==
*Manual gate valve between SEC and Edinburgh chamber
New one has arrived - plan to leak check it
Awaiting clamps that were ordererd
Repair kit was ordered. Maybe Katie can enjoy this.
*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
Responsible: Katie, Daid, ...
Not yet repaired, Peter searches for manual
Alternative module was found and tagged for our use, needs testing
*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
Responsible: Katie, Daid, ...
Useful for photodiode trigger. Take replacement back to CERN.
Tagged for repair.
Alternative module was found and tagged for our use, needs testing
*Take additional Pre-amp to CERN for Photodiode?
There are several in the Miniball cupboard...
*Chamber stand wheel struts
These were mailed to CERN attn: Karl Johnston. He confirmed with DHL.
==Decisions==
*How shall we integrate the beam intensity delivered to target?
Total integrated current, with efficiency-calibrated Ge detector
Gold foil w/ back-scattering to photodiode?
Needs foil, mounts for foil & photodiode. Other parts prepared.
Alpha scattering in SSDs is most preferred.
*Photodiode degrader foil for isobaric check
10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
What thickness is sufficient for 44Sc / 44Ti separation?
(...or other suspected contamination...)
Need to know the beam energies! This is quick work.
*Target ladder setup -- IMPORTANT
Peter has made a jig for us, it looks promising.
How many targets can fit & what should they be?
3 mm collimator
Photodiodes (takes two slots)
Viewing screen (?)
1 mm collimator (?)
Blank target frame (?)
==Work==
*Gas cell
Responsible: Katie, Conor
Gas cell eventually needs to go to CERN.
**Window material / thickness
9, 12.5 um Al
3, 6 um Ti
2.5 um Havar
3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.
*Chamber alignment
Responsible: Peter Black
Previously, we contacted the survey team to come assist.
We'll have a chat next week. Peter can join w/ Skype.
Alignment parts are all at CERN, _except a gas cell prism holder_
*DAQ PC has any further issues to get on the network?
Responsible: Daid, Tom Davinson
(If PC is turned on, contact Ruchi as she would like some data.)
*Cobbling things together at CERN next week
Responsible: Daid, Conor, ...
What should we take?
Rainbows and unicorns.
What should we bring back?
Some chocolate, maybe
==Simulation code==
Responsible: Daid, Alex, Conor, ...
Sounds like some people are reinventing the wheel in Canada.
What's the best way to collaborate and share? Probably git.
|
26
|
Mon Sep 25 14:50:46 2017 |
dk | To do list before main exp. - update from meeting 28th September | NB: This list may be incomplete!
CERN side:
Beam operators hope for a FC which can be automated at the end of SEC: Olof ?
Gain resistors (and other items) sent to CERN. Where are they? KJ has them? Check with Karl
w26 PC needs to get online. Contact Olof when we return to ISOLDE to confirm the network port is still free.
Daid. Need to register the device to CERN
Dry N2 bottle: ask Karl
Edinburgh side:
Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter
Cooling line chamber feed through: get spare. Peter
Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15
um for highest beam energy. With lowest beam energy we might need to change the foil: Daid
Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi
Sort routines for dE-E plots, etc, for online analysis: Tom
Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter
Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer,
We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia
Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables
Beam viewer: see target ladder
Faraday cup SHV to SMA converter: Peter
Window port for front of chamber? Peter
Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add
technical drawing on elog.
Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter
Adjustable feet to be produced for radial alignment: Peter / Toby
Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof.
Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator
ahead of his chamber
Calibration of Target ladder positions. Peter / Daid
Email to Karl & Olof about:
- FC after SEC
- Parcel of gain resistors
- date for connection of SEC to our chamber
- collimator in front of chamber ?
- N2 bottle |
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but check more carefully)
Beam viewing material
Previous order very delayed
==TDC data==
*Check for remaining LeCroy 622 quad logic unit
ask Stephan http://www.ph.ed.ac.uk/people/stephan-eisenhardt
*Conversion cables for CAEN V767 TDC input
*RAL ADC output split of ribbon cable
==SSDs==
How to protect the S2s during beam tuning?
Can the ISOLDE operators easily restore beam optics settings or not?
(Determines if we can do all the beam tuning at once or if we have to separate them)
Controlable iris aka Star Wars door -- contact Simon Fox at York
Dynamic range of the preamps is only maximum 200 MeV, so we need a foil to degrade the heavy ion energy
Gain resistors for up to three dynamic range settings |
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
Attachment 1: Babysitting_ISOLDE_from_the_CCC.pdf
|
|
2
|
Fri Jan 27 11:33:10 2017 |
DK | Testing email server | Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not
Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit List Config > Who can
send messages. |
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog system regarding the email notification.
And testing updating an elog.
Testing again... |
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog). They said they enabled it for ISOLDE. Let's test
to see!
Another test (June 1st) |
195
|
Mon Oct 8 17:02:47 2018 |
DK | Target ladder photo from previous experiment | From Alex, attached. |
Attachment 1: IMG_1274.jpg
|
|
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration | |
Attachment 1: TargetLadder.pdf
|
|
67
|
Thu Nov 9 12:15:33 2017 |
SL | TIMBER: Faraday Cup Measurements | Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17). |
200
|
Wed Oct 31 14:50:36 2018 |
DK | Strut shipping info | http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
Hi Ruchi,
Could you ask a friend for me to make a measurement with a ruler? I
attach a PDF you may send along. It shows a basic picture of the blue
chamber stand, a picture of the broken part, and an arrow with what I
need to know. Second page of PDF shows what kind of signage should be
on the items of interest.
The steel wheel mounts have two bolts which connect them to the
struts. We want to know the spacing between the *center* of one bolt
to the second bolt, so that we know the spacing to drill into the new
struts. There are 4 such steel wheel mounts, two on a pair of struts.
My guess is the value is something around 12 cm give or take. But I
need a precise value and I forgot to measure it in August.
The chamber stand is located to the beam left of XT01 (Miniball) in
ISOLDE hall, or it was ...
Cheers,
daid |
Attachment 1: edinburgh-chamber-query.pdf
|
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) | Screen shots for accumulated data before the target went down. Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2 target. |
Attachment 1: Screenshot_091117night_delE_1.png
|
|
Attachment 2: Screenshot_091117night_delE_2.png
|
|
Attachment 3: Screenshot_091117night_delE_3.png
|
|
Attachment 4: Screenshot_091117night_delE_4.png
|
|
Attachment 5: Screenshot_091117night_E_1.png
|
|
Attachment 6: Screenshot_091117night_E_2.png
|
|
Attachment 7: Screenshot_091117night_E_3.png
|
|
Attachment 8: Screenshot_091117night_E_4.png
|
|
Attachment 9: Screenshot_091117night_HI_1.png
|
|
Attachment 10: Screenshot_091117night_HI_2.png
|
|
Attachment 11: Screenshot_091117night_HI_3.png
|
|
Attachment 12: Screenshot_091117night_HI_4.png
|
|
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
12 for analog
12 for discrim
2 extra
==BOX B==
RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX C==
RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX D==
Scrolling pump
Backflow interlock |
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
7 Silena ADCs
1 S9418 ACQ controller
2 CAEN V767 TDC
CAEN 560
MVME 24XX Motorola crate Controller
26 ribbon cables
12 for analog
12 for discrim
2 extra
==BOX B== 49kg - 600mm x 600mm x 800mm
RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX C== 40kg - 600mm x 600mm x 800mm
RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes
==BOX D== 29kg - 450mm x 450mm x 450mm
Scrolling pump
Backflow interlock
==BOX E==
Target ladder and components
==BOX F== 92kg - 600mm x 600mm x 800mm
Large TMP
Small TMP
2 TMP controllers
2 Preamp feedthrough
Bolts and washers
2 O-Rings + 1 spare
2 Preamp power supplies
TMP bolts (large and small)
20x IEC leads
2x Swiss to UK leads
Box E
Box G
2x spare HVBNC cables
middle foot sections of blue frame
2x vacuum hoses
==BOX G==
2 inverse magnetron ion gauges
1 thermocouple vacuum gauge
==BOX H==
Multi gauge reader
==Box I==
Chiller & Pipes
Chamber, sliding mount
Box H (gauge reader)
Box E (target ladder)
4 Long ribbon cables
3 Power Bars
==BOX J==
6 feet for chamber stand
All bolts for chamber stand
Spacers
==BOX K==
Valve for TP 1 & 2
vacuum clamps
==BOX L==
Upstream beamline pipe
Gate valve, nipple, adaptor flange to SEC
N2 pipe with valve
Mechanical pressure gauge and "plus" type connector
Swagelok nylon and brasss ferrels for gas line / coolant piping
==BOX M==
Bolts, nuts and spacers for chamber end flanges and center
==BOX N=
Blanking kindey plate
bellows
bellow cage
o-ring for ribbon feedthroughs
spare straight and right angle swagelok fittings
TMP/gauge mounting pipe
Faraday cup
dummy detectors
thermocouple cbable
cctv camera power lead
BNC to Lemo
Lemo to Ribbon box
lemo cables
20 ~1 cm spacers for SSD mounting
9 ~2 cm spacers for SSD mounting
==BOX O== 84kg - 600mm x 600mm x 800mm
Box J, K. L. M, N, S, T
Old inv magnetron vac gauge meter
thin green polymer tubing (gas lines, cooling system)
current integrator for FC
3 large O-Rings for chamber (spare)
thermometer
short bits of blue frame
braces off blue frame
16way BNC multicore
==BOX P== 83kg - 600mm x 600mm x 800mm
Camac crate
5x Logic Shaped Outputs (CAMAC)
2x CAMAC / VME converter
1 LeCroy 622 Quad Logic (NIM)
1 Ortec 566 TAC (NIM)
1 Lecroy 222 dual GDG
1 Ortec 459 bias supply
NIM crate
1 BNC PB-5 digital pulse generator
1 BNC PB-4 analog pulse generator
1 Analog ratemeter 4678
1 ECL-NIM-ECL EC 1601
1 Silena Quad Bias Supply 7710
2 LeCroy 419A Logic FI/FO
==BOX Q== 52kg - 600mm x 600mm x 800mm
Sun Microsystems Tower
==BOX R== 37kg - 600mm x 450mm x 700mm
Wheels for frame
Tools
Safety boots and helmets-
-Daid
-Toby
-Mirco
-Claudia
==BOX S==
2 S2 1000 um SSDs
==BOX T==
3 S2 75 um SSDs
==Box U==
1 green gremlin
2 pink unicorns
==Bundle 1== 16kg - 1600mm x 400mm x 150mm
==Bundle 2== 8kg - 700mm x 150mm x 150mm
==Bundle 3== 15kg - 1400mm x 300mm x 150mm
==Bundle 4== 12kg - 650mm x 1150mm x 100mm
==Bundle 5== 23kg = 2300mm x 150mm x 150mm
Number of Packages: 10 Boxes, 5 Bundles
NET WEIGHT: ~800kg |
5
|
Tue Apr 18 11:05:43 2017 |
Mirco / Claudia | Setup Preparation | status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
Attachment 1: ISOLDE_-_chamber_status070417.pdf
|
|
Attachment 2: ISOLDE_-_chamber_status210417.pdf
|
|
24
|
Tue Sep 19 14:54:47 2017 |
Claudia, Toby | Setup Photos | |
Attachment 1: DSC01138.JPG
|
|
Attachment 2: DSC01141.JPG
|
|
Attachment 3: DSC01146.JPG
|
|
Attachment 4: DSC01148.JPG
|
|
Attachment 5: DSC01169.JPG
|
|
Attachment 6: DSC01170.JPG
|
|
Attachment 7: DSC01171.JPG
|
|
Attachment 8: DSC01172.JPG
|
|
Attachment 9: DSC01176.JPG
|
|
Attachment 10: DSC01182.JPG
|
|
Attachment 11: image1.JPG
|
|
Attachment 12: image2.JPG
|
|
Attachment 13: image3.JPG
|
|
Attachment 14: image4.JPG
|
|
192
|
Thu Oct 4 13:07:33 2018 |
KG | Schematics for gas-cell tests | in_atmosphere.png : schematic for testing gas-cell in atmosphere
Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell |
Attachment 1: in_atmosphere.png
|
|