AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 2 of 11  ELOG logo
ID Date Author Subjectdown
  92   Sat Nov 11 00:01:41 2017 Daid. MircoTrigger and scalars for 4.0 MeV/u
Tom et al. tuned the trigger this evening, before we began the runs.  (Run 82, or Run 83??)

===TRIGGER===

Trigger condition is: E OR HI/ds

We count the CAMAC OR signals as follows: A,B
    A: Which CAMAC module?  Left to right, 1,2,3,4,5
    B: Which module channel? This is the number engraved on the module by the LEMO output.

==E Definition==
All p-n sides of E detector: 
    RAL 109 discrim cable numbers: 4, 5, 7
       => Corresponds to CAMAC OR Numbers 2,2; 2,1; 3,1, respectively.
    
==HI/ds Definition==
All p-n sides of HI detector: 8, 9, 11
    RAL 109 discrim cable numbers 
       => Corresponds to CAMAC OR Numbers 4,3; 4,2; 5,3, respectively.

ds=Downscale; ds factor is 8 = 2^8 = 256

===SCALARS===

0: Ungated
1: Gated
2: dE (n-n) [Cable 3]
3: E (n-n)  [Cable 6]
4: HI (n-n) [Cable 10]
5: Pulser
6: Clock

===DISCUSSION===
The n-n side of the E detector seems to be noisier than the p-n side.  Thus the p-n side is used for the trigger logic, whilst the n-n side is used for the scalar.

However, there seems to be something confusing about using the p-n side for the true trigger but the n-n side for the scalars.  It means we cannot compare the scalars self-
consistently to each other.  That is, the gated or ungated signals do not have a strong correlation with the individual detector scalars.  In principle if we have enough LEMO 
cables and Fan In/Fan Out modules, we should simply propagate the p-n signals to both the trigger (when relevant, i.e. E detector) and the scalars alike.  For now we don't 
touch anything, though.
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheet
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or

https://tinyurl.com/isolde-44ti
  196   Tue Oct 9 10:40:13 2018 DKTo-do Meeting Notes: July, August, September, October
Each month's notes are attached.  Unfinished business naturally carries over to the next month.

This elog will be updated with new notes as necessary.

NB: These are the notes composed *prior* to the meeting, thus do not include any suggestions or corrections.
Attachment 1: 2018-07-todo.txt
ISOLDE 44Ti meeting notes
19 Jul 2018

==To be ordered==

*Entrance window foils, TBD
  6um Ti from Goodfellow?

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance
  No new updates.  Do we really need it?

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: Peter, Daid, CERN Vacuum Team ...

  The old one had a leak, likely from the O-ring
  (Automated fast-acting gate valve could be required)
  At some point, we may have to decide w/o input
  Path of least resistance: fix existing one
  
  (The old manual one should be around Peter's office...what's the beam pipe size?)

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  

*Teflon chamber feet stands
  Responsible: Toby Fu

  The original foot engraving diameter was too small, by mistake.  The chamber could be shifted after alignment
  But what are the design specifications?

  EMAIL Mirco TO PICK THEM UP FOR US FROM ISOLDE

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is another option

*Photodiode degrader foil for isobaric check
  Which Al foil(s) are prepared?
    In Edinburgh or CERN?
  What thickness is sufficient for 44Sc / 44Ti separation?

*Gas cell entrance window material / thickness

==Work==

*Decide beam energies
  Responsible: Conor, Alex, Daid

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

*Model effect of beam spot size. 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available
  He gas bottle needs a mounting support prior to use.
    Everything is in Physics Stores
  We can continue to investigate true leak rate, gas cell handling, assembly

  Gas cell eventually needs to go to CERN.  
  Are we satisfied with the setup, or shall we get new parts?
     (e.g. several new valves, ...)

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  

  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 2: 2018-08-todo.txt
ISOLDE 44Ti meeting notes
28 Aug 2018

==To be ordered==

*Entrance window foils, TBD
  3um Ti from Goodfellow?  Is it light-tight?

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  *FIRST CHECK VACUUM, CHILLER!*
  	NB: Might damage piping during re-assembly
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance -- no need to buy
 We are welcome to use the one in the chem lab on 2nd floor
   Just wear a lab coat, and don't move other people's stuff

*PPE (Safety)
  Boots and hardhats for new members

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: Peter, Daid, Conor, Katie, ...

  The old one had a leak, we don't know where
    It's on top of Peter's PC in his office

  Students can test in Edinburgh...once leak is identified: 
    Fix ourselves or send to Lesker?

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Responsible: Toby, Mirco, Daid

  The original foot engraving diameter was too small, by mistake.  
  But what are the design specifications?

  (Mirco picked these up for us, so they are in Germany?)

*Chamber stand wheel struts
  Responsible: Peter, Daid, ...

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is another option

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)

*Gas cell entrance window material / thickness

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Determine beam energies
  Responsible: Conor, Alex, Daid, Karl, Alberto, ...

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

  Karl mentioned the possibility of a beam test.

  Previous beam was 44Ti+13.  40Ar may be a good pilot?

*Model effect of beam spot size -- still relevant? 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available
  He gas bottle needs regulator, that's it.

  Gas cell eventually needs to go to CERN.  
  Are we satisfied with the setup, or shall we get new parts?
     (e.g. several new valves, ...)

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  

  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 3: 2018-09-todo.txt
ISOLDE 44Ti meeting notes
27 Sept 2018

==To be ordered==

*Entrance window foils, TBD
  4um Ti from Goodfellow?
  9, 12 um Al from Goodfellow?
  (Some existing queries regarding Havar, et al.)

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  *FIRST CHECK VACUUM, CHILLER!*
  	NB: Might damage piping during re-assembly
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance
 Daid still needs to show Katie and Conor where the room is and what to do.
 We are welcome to use the one in the chem lab on 2nd floor
   Just wear a lab coat, and don't move other people's stuff

*PPE (Safety)
  Boots and hardhats for new members

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: (Your name here)
  Lesker quotes £123 for a repair kit.  Check the elog.  Does anyone volunteer?

  New one has arrived - plan to leak check it
  We need a KF-50 to ~ KF-25 (need to check) converter

*Photodiodes
  Responsible: Daid
  We have 3 at CERN, but no more in Edinburgh.  Order more!

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Responsible: Toby, Daid

  The original foot engraving diameter was too small, by mistake.  

  They are at Daid's desk, with tracings of the proper size.

*Chamber stand wheel struts
  Responsible: Peter, Daid, Conor, Ruchi

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it
  
  Need a measurement of bolt spacing, Ruchi has a friend who can help us.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
    Daid should contact Paul Morrall
  Alpha scattering in SSDs is most preferred.

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)

*Gas cell entrance window material / thickness

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Determine beam energies
  Responsible: Conor, Alex, Daid, Karl, Alberto, ...

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

  Karl mentioned the possibility of a beam test.

  Previous beam was 44Ti+13.  40Ar may be a good pilot?
  
  WE AWAIT ALBERTO'S OPTICS CALCS  & CRYO MODULE SCHEDULE.

*Model effect of beam spot size -- still relevant? 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control. 

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 4: 2018-10-todo.txt
ISOLDE 44Ti meeting notes
09 Oct 2018 

==To be ordered==

*Windows
  Done

*Gas bottles at CERN - Helium and (likely) Argon.  
  Gas bottle will need a regulator (new or old one)
  Emailed Karl to inquire.  N2 necessary?

*Spanners to help repair water chiller leak.
  Done

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system

*Gas cell stands for each gas cell
  Order was submitted.

*Photodiodes
  We have 3 at CERN, but no more in Edinburgh.  Order more!

*Au foils

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: (Your name here)
  Lesker quotes £123 for a repair kit.  Do we give up?

  New one has arrived - plan to leak check it
  Converter flange to check w/ He sniffer ordered, not arrived.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Done

*Chamber stand wheel struts
  Responsible: Peter, Daid, Conor, Ruchi

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it
  
  Need a measurement of bolt spacing, Ruchi has a friend who can help us.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
    Daid should contact Paul Morrall
  Alpha scattering in SSDs is most preferred.

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control.

  Many windows, washers, etc are now ready to go!

  **Window material / thickness
    9, 12.5 um Al arrived.
    3 um Ti arrived, some holes but maybe serviceable
    6 um Ti had order mixup
    We can get Havar in 2 weeks privately


*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 5: 2018-10-23-todo.txt
ISOLDE 44Ti meeting notes
23 Oct 2018 

==To be ordered==

*Gas bottles at CERN - Helium and (likely) Argon.  
  Gas bottles for He, Ar can be supplied by CERN
  N2 was also approved, but bear in mind volume required

*Spanners to help repair water chiller leak.
  Ordered but did they arrive?

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system

*Gas cell stands for each gas cell
  Order was submitted.

*Photodiodes
  Order of 10 to arrive 7 Nov

*Au foils
  Order placed with Paul at STFC

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  New one has arrived - plan to leak check it
  Converter flange to check w/ He sniffer ordered arrived
    Awaiting clamps that were ordererd

  Repair kit was ordered.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands - done

*Chamber stand wheel struts
  Responsible: Peter, Daid

  We have the necessary preparations, we await Peter.
  We will use 118 cm since garage direction is ~121 cm

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is most preferred.


*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup -- IMPORTANT
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control.

  **Window material / thickness
    9, 12.5 um Al 
    3, 6 um Ti 
    2.5 um Havar 

  3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.


*Chamber alignment
  Responsible: Peter Black

  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 6: 2018-10-31-todo.txt
ISOLDE 44Ti meeting notes
31 Oct 2018 

==ENSAR2 status==
  We have some information from people, but not enough.
  When is the deadline?

==Meetings at CERN next week==

*Beam energy w/ Alberto

*Crane use w/ Olof

*Survey team w/ Peter Skypes

*RILIS people for laser ideas

*Find Liam if we need the alpha source

==To be ordered==

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system
  Done.  Peter will help weld it up later.

*Gas cell stands for each gas cell
  Order is completed.  We are awaiting M2 screws now.

*Photodiodes
  Order of 10 to arrive 7 Nov

*Au foils
  Paul at STFC confirmed the order.

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  New one has arrived - plan to leak check it
    Awaiting clamps that were ordererd

  Repair kit was ordered.  Maybe Katie can enjoy this.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Chamber stand wheel struts
  These were mailed to CERN attn: Karl Johnston.  He confirmed with DHL.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is most preferred.


*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup -- IMPORTANT
  Peter has made a jig for us, it looks promising.
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Gas cell eventually needs to go to CERN.  
  
  **Window material / thickness
    9, 12.5 um Al 
    3, 6 um Ti 
    2.5 um Havar 

  3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.

*Chamber alignment
  Responsible: Peter Black

  Previously, we contacted the survey team to come assist.
    We'll have a chat next week.  Peter can join w/ Skype.
  Alignment parts are all at CERN, _except a gas cell prism holder_

*DAQ PC has any further issues to get on the network?
  Responsible: Daid, Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)

*Cobbling things together at CERN next week
  Responsible: Daid, Conor, ...

  What should we take?  
    Rainbows and unicorns.
  What should we bring back?
    Some chocolate, maybe

==Simulation code==
  Responsible: Daid, Alex, Conor, ...

  Sounds like some people are reinventing the wheel in Canada.  
  What's the best way to collaborate and share?  Probably git.
  26   Mon Sep 25 14:50:46 2017 dkTo do list before main exp. - update from meeting 28th September
NB: This list may be incomplete!

CERN side: 

     Beam operators hope for a FC which can be automated at the end of SEC: Olof ?

     Gain resistors (and other items) sent to CERN.  Where are they?  KJ has them? Check with Karl

     w26 PC needs to get online.  Contact Olof when we return to ISOLDE to confirm the network port is still free.
Daid. Need to register the device to CERN

     Dry N2 bottle: ask Karl

Edinburgh side:

     Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter

     Cooling line chamber feed through: get spare. Peter
 
     Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15
um for highest beam energy. With lowest beam energy we might need to change the foil: Daid

     Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi

     Sort routines for dE-E plots, etc, for online analysis: Tom

     Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter

     Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer,
We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia

     Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables

     Beam viewer: see target ladder

     Faraday cup SHV to SMA converter: Peter

     Window port for front of chamber? Peter

     Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add
technical drawing on elog. 

     Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter

     Adjustable feet to be produced for radial alignment: Peter / Toby

     Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof. 

     Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator
ahead of his chamber

     Calibration of Target ladder positions. Peter / Daid


Email to Karl & Olof about:
- FC after SEC
- Parcel of gain resistors
- date for connection of SEC to our chamber
- collimator in front of chamber ?
- N2 bottle
  11   Wed Aug 16 12:53:43 2017 DKTo do / missing
Photodiode
     Electronics
     Foil mount (12 um Al seems okay, but check more carefully)

Beam viewing material
     Previous order very delayed

==TDC data==

*Check for remaining LeCroy 622 quad logic unit
      ask Stephan http://www.ph.ed.ac.uk/people/stephan-eisenhardt

*Conversion cables for CAEN V767 TDC input

*RAL ADC output split of ribbon cable

==SSDs==

How to protect the S2s during beam tuning?
     Can the ISOLDE operators easily restore beam optics settings or not?
     (Determines if we can do all the beam tuning at once or if we have to separate them)
     Controlable iris aka Star Wars door -- contact Simon Fox at York

Dynamic range of the preamps is only maximum 200 MeV, so we need a foil to degrade the heavy ion energy

Gain resistors for up to three dynamic range settings
  61   Thu Nov 9 07:15:49 2017 MDTips for Babysitting ISOLDE during shifts
from ISOLDE webpage
Attachment 1: Babysitting_ISOLDE_from_the_CCC.pdf
Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf Babysitting_ISOLDE_from_the_CCC.pdf
  2   Fri Jan 27 11:33:10 2017 DKTesting email server
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not

Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit List Config > Who can 
send messages.
  10   Thu Jun 1 13:09:38 2017 DKTesting email header, part II
Checking some server settings for the elog system regarding the email notification.

And testing updating an elog.


Testing again...
  6   Wed Apr 26 12:10:04 2017 DKTesting email header
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog).  They said they enabled it for ISOLDE.  Let's test 
to see!

Another test (June 1st)
  195   Mon Oct 8 17:02:47 2018 DKTarget ladder photo from previous experiment
From Alex, attached.
Attachment 1: IMG_1274.jpg
IMG_1274.jpg
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration
Attachment 1: TargetLadder.pdf
TargetLadder.pdf
  67   Thu Nov 9 12:15:33 2017 SLTIMBER: Faraday Cup Measurements

Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17).

  200   Wed Oct 31 14:50:36 2018 DKStrut shipping info
http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement request
For posterity

==========

Hi Ruchi,

Could you ask a friend for me to make a measurement with a ruler?  I
attach a PDF you may send along.  It shows a basic picture of the blue
chamber stand, a picture of the broken part, and an arrow with what I
need to know.  Second page of PDF shows what kind of signage should be
on the items of interest.

The steel wheel mounts have two bolts which connect them to the
struts.  We want to know the spacing between the *center* of one bolt
to the second bolt, so that we know the spacing to drill into the new
struts.  There are 4 such steel wheel mounts, two on a pair of struts.

My guess is the value is something around 12 cm give or take.  But I
need a precise value and I forgot to measure it in August.

The chamber stand is located to the beam left of XT01 (Miniball) in
ISOLDE hall, or it was ...

Cheers,
daid
Attachment 1: edinburgh-chamber-query.pdf
edinburgh-chamber-query.pdf edinburgh-chamber-query.pdf
  60   Thu Nov 9 06:30:35 2017 Daid, MircoSpectra (Shift 1)
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2 target.
Attachment 1: Screenshot_091117night_delE_1.png
Screenshot_091117night_delE_1.png
Attachment 2: Screenshot_091117night_delE_2.png
Screenshot_091117night_delE_2.png
Attachment 3: Screenshot_091117night_delE_3.png
Screenshot_091117night_delE_3.png
Attachment 4: Screenshot_091117night_delE_4.png
Screenshot_091117night_delE_4.png
Attachment 5: Screenshot_091117night_E_1.png
Screenshot_091117night_E_1.png
Attachment 6: Screenshot_091117night_E_2.png
Screenshot_091117night_E_2.png
Attachment 7: Screenshot_091117night_E_3.png
Screenshot_091117night_E_3.png
Attachment 8: Screenshot_091117night_E_4.png
Screenshot_091117night_E_4.png
Attachment 9: Screenshot_091117night_HI_1.png
Screenshot_091117night_HI_1.png
Attachment 10: Screenshot_091117night_HI_2.png
Screenshot_091117night_HI_2.png
Attachment 11: Screenshot_091117night_HI_3.png
Screenshot_091117night_HI_3.png
Attachment 12: Screenshot_091117night_HI_4.png
Screenshot_091117night_HI_4.png
  Draft   Wed Aug 16 15:29:57 2017 DKShipping Inventory
==BOX A==
VME crate
26 ribbon cables
    12 for analog
    12 for discrim
    2 extra

==BOX B==
RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes

==BOX C==
RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes

==BOX D==
Scrolling pump
Backflow interlock
  13   Wed Aug 16 15:30:04 2017 DK, MDShipping Inventory
==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
    7 Silena ADCs
    1 S9418 ACQ controller
    2 CAEN V767 TDC
    CAEN 560
    MVME 24XX Motorola crate Controller
26 ribbon cables
    12 for analog
    12 for discrim
    2 extra


==BOX B==  49kg - 600mm x 600mm x 800mm

RAL amp crate (full with modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes


==BOX C==  40kg - 600mm x 600mm x 800mm

RAP amp crate (only 5 modules)
Ribbon cables for patch
1 NIM Fan
2 Cable patch boxes


==BOX D==  29kg - 450mm x 450mm x 450mm

Scrolling pump
Backflow interlock


==BOX E==  

Target ladder and components


==BOX F==  92kg - 600mm x 600mm x 800mm

Large TMP
Small TMP
2 TMP controllers
2 Preamp feedthrough
   Bolts and washers
   2 O-Rings + 1 spare
2 Preamp power supplies
TMP bolts (large and small)
20x IEC leads
2x Swiss to UK leads
Box E
Box G
2x spare HVBNC cables
middle foot sections of blue frame
2x vacuum hoses


==BOX G==

2 inverse magnetron ion gauges
1 thermocouple vacuum gauge


==BOX H==

Multi gauge reader


==Box I==

Chiller & Pipes
Chamber, sliding mount
Box H (gauge reader)
Box E (target ladder)
4 Long ribbon cables
3 Power Bars


==BOX J==

6 feet for chamber stand
All bolts for chamber stand
Spacers


==BOX K==

Valve for TP 1 & 2
vacuum clamps


==BOX L==

Upstream beamline pipe
    Gate valve, nipple, adaptor flange to SEC
N2 pipe with valve
Mechanical pressure gauge and "plus" type connector
Swagelok nylon and brasss ferrels for gas line / coolant piping


==BOX M==

Bolts, nuts and spacers for chamber end flanges and center


==BOX N=

Blanking kindey plate
bellows
bellow cage
o-ring for ribbon feedthroughs
spare straight and right angle swagelok fittings
TMP/gauge mounting pipe
Faraday cup
dummy detectors
thermocouple cbable
cctv camera power lead
BNC to Lemo 
Lemo to Ribbon box
lemo cables
20 ~1 cm spacers for SSD mounting
9 ~2 cm spacers for SSD mounting


==BOX O==  84kg - 600mm x 600mm x 800mm

Box J, K. L. M, N, S, T
Old inv magnetron vac gauge meter
thin green polymer tubing (gas lines, cooling system)
current integrator for FC
3 large O-Rings for chamber (spare)
thermometer
short bits of blue frame
braces off blue frame
16way BNC multicore


==BOX P==  83kg - 600mm x 600mm x 800mm

Camac crate
     5x Logic Shaped Outputs (CAMAC)
     2x CAMAC / VME converter
     1 LeCroy 622 Quad Logic (NIM)
     1 Ortec 566 TAC (NIM)
     1 Lecroy 222 dual GDG
     1 Ortec 459 bias supply

NIM crate
     1 BNC PB-5 digital pulse generator
     1 BNC PB-4 analog pulse generator
     1 Analog ratemeter 4678
     1 ECL-NIM-ECL EC 1601
     1 Silena Quad Bias Supply 7710
     2 LeCroy 419A Logic FI/FO

     
==BOX Q==  52kg - 600mm x 600mm x 800mm

Sun Microsystems Tower


==BOX R==  37kg - 600mm x 450mm x 700mm

Wheels for frame
Tools
Safety boots and helmets-
    -Daid
    -Toby
    -Mirco
    -Claudia


==BOX S==

2 S2 1000 um SSDs


==BOX T==

3 S2 75 um SSDs


==Box U==

1 green gremlin
2 pink unicorns


==Bundle 1==  16kg - 1600mm x 400mm x 150mm


==Bundle 2==  8kg - 700mm x 150mm x 150mm


==Bundle 3==  15kg - 1400mm x 300mm x 150mm


==Bundle 4==  12kg - 650mm x 1150mm x 100mm


==Bundle 5==  23kg = 2300mm x 150mm x 150mm


Number of Packages: 10 Boxes, 5 Bundles


NET WEIGHT: ~800kg
  5   Tue Apr 18 11:05:43 2017 Mirco / ClaudiaSetup Preparation

status of the setup - 07/04/2017

status of the setup - 21/04/2017

Attachment 1: ISOLDE_-_chamber_status070417.pdf
ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf ISOLDE_-_chamber_status070417.pdf
Attachment 2: ISOLDE_-_chamber_status210417.pdf
ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf ISOLDE_-_chamber_status210417.pdf
  24   Tue Sep 19 14:54:47 2017 Claudia, TobySetup Photos
Attachment 1: DSC01138.JPG
DSC01138.JPG
Attachment 2: DSC01141.JPG
DSC01141.JPG
Attachment 3: DSC01146.JPG
DSC01146.JPG
Attachment 4: DSC01148.JPG
DSC01148.JPG
Attachment 5: DSC01169.JPG
DSC01169.JPG
Attachment 6: DSC01170.JPG
DSC01170.JPG
Attachment 7: DSC01171.JPG
DSC01171.JPG
Attachment 8: DSC01172.JPG
DSC01172.JPG
Attachment 9: DSC01176.JPG
DSC01176.JPG
Attachment 10: DSC01182.JPG
DSC01182.JPG
Attachment 11: image1.JPG
image1.JPG
Attachment 12: image2.JPG
image2.JPG
Attachment 13: image3.JPG
image3.JPG
Attachment 14: image4.JPG
image4.JPG
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell tests
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
Attachment 1: in_atmosphere.png
in_atmosphere.png
Attachment 2: Feedthrough.png
Feedthrough.png
ELOG V3.1.4-unknown