Entry  Thu Nov 9 15:55:56 2017, SL, Run 65 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS)         : 
Blocks written         : 179
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 50
3- E                       
Entry  Thu Nov 9 16:30:15 2017, SL, Run 66 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender: 
====================================================
Run
number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS)         : 
Blocks written         : 84
——————————————————————————————
Run
Scalars
0- Ungated                      : 14
1- Gated                        : 12
2- dE                           : 51
3- E                       
Entry  Thu Nov 9 18:56:13 2017, SL, Run 72 

Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 72
Date : 09/11
Start time :
20:14
Stop time : 21:41
Trigger rate (MIDAS) : 
Blocks written : 570
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 12
1- Gated                        : 10
2- dE                           : 59
3- E        
Entry  Thu Nov 9 19:06:08 2017, SL, Run 68-71 
JUNK
Entry  Thu Nov 9 20:46:29 2017, SL, Run 73 Screen_Shot_2017-11-09_at_22.38.49.png

Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run
number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) : 
Blocks written : 263
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 21:31:16 2017, SL, Run 74 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png

Header: 4.7 MeV/u and CH2_30+25. 
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date :
09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) : 
Blocks written : 422
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Fri Nov 10 10:46:54 2017, SL, Investigation of E detector thickness 
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.

The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V
Entry  Fri Nov 10 19:01:13 2017, SL, Run 81 
 


Header: 3.99 MeV/u and CH2_30+25.
Ender: Stopped to check E hardware.
====================================================
Run number :
81
Date : 10/11
Start time : 20:20
Stop time : 20:50
Trigger rate (MIDAS)            :  
Blocks written                  : 70
——————————————————————————————
Run
Entry  Fri Nov 10 19:57:49 2017, SL, Run 82 

Header: 3.99 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 82
Date : 10/11
Start time :
21:03
Stop time : 21:30
Trigger rate (MIDAS)            :  
Blocks written                  : 
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      :  
1- Gated                        :  
2- dE                           :  
3- E           
Entry  Fri Nov 10 20:30:57 2017, SL, Run 83 
 


Header: 3.99 MeV/u and CH2_30+25.
Ender: Recompiling sort code.
====================================================
Run number : 83
Date :
10/11
Start time : 21:30
Stop time : 22:59
Trigger rate (MIDAS)            :  
Blocks written                  : 150
——————————————————————————————
Run
Entry  Tue Nov 14 14:30:51 2017, SL, Photos inside chamber (detectors, IRIS, etc) OneDrive-2017-11-14_2.zip
 
Entry  Wed Nov 8 21:21:31 2017, Ruchi Garg, Daid, RunLogTemplate 
Header:
Ender: 
====================================================
Entry  Tue Nov 7 14:38:25 2017, Ruchi Garg, Target ladder configuration TargetLadder.pdf
 
Entry  Sun Nov 5 20:25:10 2017, Ruchi, Circuit diagram and cable mapping Cabling.pdfPreampsPCBs.pdfCircuit.pdf
 
Entry  Wed Nov 8 22:21:35 2017, Ruchi, Beam transmission 
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
Entry  Thu Nov 16 15:37:35 2017, RG, MD, CLW, Run 167 JUNK 
 
Entry  Sat Nov 11 17:08:50 2017, RG, DK, CL, TD, AM, MD, Run 96 
Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
Entry  Mon Nov 13 17:23:16 2017, RG SL, Run 128 
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
Entry  Mon Nov 13 00:12:24 2017, RG MD DK, Run 116 
Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
Entry  Mon Nov 13 02:59:37 2017, RG MD, Run 118 - short 
Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================