AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 10 of 11  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Nov 12 09:16:01 2017, CLW, PJW, TD, Run 106 
junk - ignore
Entry  Sun Nov 12 09:17:49 2017, CLW, PJW, TD, Run 107 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Entry  Sat Nov 11 15:17:24 2017, CLW, PJW, RG, TD, MD, DK, Run 95 
Header: Continue with 4.0 MeV/u on Carbon after laser cleaning
Ender: 
====================================================
Entry  Sat Nov 11 11:21:22 2017, CLW, PJW, RG, Run 92 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 12:16:28 2017, CLW, PJW, RG, Run 93 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Sat Nov 11 14:15:12 2017, CLW, PJW, RG, Run94 
Header: 3.99 MeV/u and C_25. 
Ender: We stop because the lasers are being cleaned, and we saw the scalars drop.  See Comment below.
====================================================
Entry  Sun Nov 12 11:19:06 2017, CLW, PJW, Run 108 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
Entry  Sun Nov 12 13:24:51 2017, CLW, PJW, Run 109 
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
Entry  Sat Nov 11 09:20:56 2017, CLW, MD, PJW, Run 91 

Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender: 
Entry  Tue Nov 14 16:00:29 2017, CLW, MB, SJL,RG, Run 145 
Header: 5 MeV/u on CH2 33,10,01
Ender:  End to allow laser cleaning
====================================================
Entry  Tue Nov 14 08:09:31 2017, CLW, Run 142 
Header: Protons are back, continue 3.6 MeV/u on CH2
Ender: 
====================================================
Entry  Tue Nov 14 15:59:42 2017, CLW, Run 144 JUNK 
valve closed
Entry  Thu Nov 23 13:16:56 2017, CLW, Beam energies 
Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/

measurements for all energies were:
Entry  Wed Nov 7 14:27:45 2018, CBH, DK, Beam Plan for Miguel and Alberto (ISOLDE beam operators) 





Presently, we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  Nov 29-Dec 4 are six (6) days nominally for physics data taking
  Dec 5-6: Shutdowns and important
tests are planned by ISOLDE team
  Dec 7th - power gets shut off to ISOLDE

==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High
Entry  Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in.
Entry  Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
Entry  Mon Nov 5 13:52:46 2018, CBH, CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies 
Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:

3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV

3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV
Entry  Mon Nov 12 11:25:58 2018, CBH, Expected Proton Energy Plots  ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png
Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom
plot showing the total energy of the particles.

Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance
Entry  Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75 
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Entry  Sat Nov 11 17:19:54 2017, ASM, CL, TD..., halflife Screen_Shot_2017-11-11_at_18.25.54.png
Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:

seconds counts/s

0    590
ELOG V3.1.4-unknown