Sun Nov 12 09:16:01 2017, CLW, PJW, TD, Run 106
|
junk - ignore |
Sun Nov 12 09:17:49 2017, CLW, PJW, TD, Run 107
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
Sat Nov 11 15:17:24 2017, CLW, PJW, RG, TD, MD, DK, Run 95
|
Header: Continue with 4.0 MeV/u on Carbon after laser cleaning
Ender:
====================================================
|
Sat Nov 11 11:21:22 2017, CLW, PJW, RG, Run 92
|
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
|
Sat Nov 11 12:16:28 2017, CLW, PJW, RG, Run 93
|
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
|
Sat Nov 11 14:15:12 2017, CLW, PJW, RG, Run94
|
Header: 3.99 MeV/u and C_25.
Ender: We stop because the lasers are being cleaned, and we saw the scalars drop. See Comment below.
====================================================
|
Sun Nov 12 11:19:06 2017, CLW, PJW, Run 108
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|
Sun Nov 12 13:24:51 2017, CLW, PJW, Run 109
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
|
Sat Nov 11 09:20:56 2017, CLW, MD, PJW, Run 91
|
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
|
Tue Nov 14 16:00:29 2017, CLW, MB, SJL,RG, Run 145
|
Header: 5 MeV/u on CH2 33,10,01
Ender: End to allow laser cleaning
====================================================
|
Tue Nov 14 08:09:31 2017, CLW, Run 142
|
Header: Protons are back, continue 3.6 MeV/u on CH2
Ender:
====================================================
|
Tue Nov 14 15:59:42 2017, CLW, Run 144 JUNK
|
valve closed |
Thu Nov 23 13:16:56 2017, CLW, Beam energies
|
Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE
https://op-webtools.web.cern.ch/elogbook/
measurements for all energies were: |
Wed Nov 7 14:27:45 2018, CBH, DK, Beam Plan for Miguel and Alberto (ISOLDE beam operators)
|
Presently, we are scheduled for 9 days:
Nov 26-28
are three (3) days nominally for beam development
Nov 29-Dec 4 are six (6) days nominally for physics data taking
Dec 5-6: Shutdowns and important
tests are planned by ISOLDE team
Dec 7th - power gets shut off to ISOLDE
==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High |
Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
|
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in. |
Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip   
|
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
|
Mon Nov 5 13:52:46 2018, CBH, CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies
|
Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:
3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV
3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV |
Mon Nov 12 11:25:58 2018, CBH, Expected Proton Energy Plots   
|
Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom
plot showing the total energy of the particles.
Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance |
Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75
|
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
|
Sat Nov 11 17:19:54 2017, ASM, CL, TD..., halflife
|
Placed a hand held rad monitor near the faraday cup and took rate readings every 20 seconds, right after inserting the gate valve in front of SEC:
seconds counts/s
0 590 |