  70   Thu Nov 9 15:55:56 2017 SLRun 65
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender: 
====================================================
Run
  
  71   Thu Nov 9 16:30:15 2017 SLRun 66
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:

====================================================
Run
  
  74   Thu Nov 9 18:56:13 2017 SLRun 72
Header: 4.7 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 72
Date : 09/11
Start time :
  
  75   Thu Nov 9 19:06:08 2017 SLRun 68-71JUNK   
  76   Thu Nov 9 20:46:29 2017 SLRun 73
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run
 Screen_Shot_2017-11-09_at_22.38.49.png 
  77   Thu Nov 9 21:31:16 2017 SLRun 74
Header: 4.7 MeV/u and CH2_30+25. 
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time :
 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png 
  85   Fri Nov 10 10:46:54 2017 SLInvestigation of E detector thicknessWhile changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
  
  88   Fri Nov 10 19:01:13 2017 SLRun 81 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Stopped to check E hardware.
====================================================
Run
  
  89   Fri Nov 10 19:57:49 2017 SLRun 82
Header: 3.99 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 82
Date : 10/11
Start time :
  
  90   Fri Nov 10 20:30:57 2017 SLRun 83 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Recompiling sort code.
====================================================
Run
  
  157   Tue Nov 14 14:30:51 2017 SLPhotos inside chamber (detectors, IRIS, etc)   OneDrive-2017-11-14_2.zip 
  48   Wed Nov 8 21:21:31 2017 Ruchi Garg, DaidRunLogTemplateHeader:
Ender: 
====================================================
  
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration   TargetLadder.pdf 
  38   Sun Nov 5 20:25:10 2017 RuchiCircuit diagram and cable mapping   Cabling.pdfPreampsPCBs.pdfCircuit.pdf 
  51   Wed Nov 8 22:21:35 2017 RuchiBeam transmissionBy the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber:
  
  179   Thu Nov 16 15:37:35 2017 RG, MD, CLWRun 167 JUNK    
  106   Sat Nov 11 17:08:50 2017 RG, DK, CL, TD, AM, MDRun 96Header: Continue with 4.0 MeV/u Empty Frame
Ender: 
====================================================
  
  142   Mon Nov 13 17:23:16 2017 RG SLRun 128Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
  
  130   Mon Nov 13 00:12:24 2017 RG MD DKRun 116Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
  
  132   Mon Nov 13 02:59:37 2017 RG MDRun 118 - shortHeader: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
  