AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 5 of 11  ELOG logo
Entry  Wed Nov 8 23:14:38 2017, Daid, Ruchi, Mirco, Run 53 
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Entry  Wed Nov 8 23:06:48 2017, Daid, Ruchi, Run 52 (junk) 
(Junk -- see comments)
====================================================
Run number : 52
Entry  Wed Nov 8 22:08:55 2017, Daid, Run 51 
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Entry  Wed Nov 8 20:46:23 2017, Daid, Ruchi, Run 50 
Header: First run with irises open.  30 min run.
Ender: Call from PS-Booster.  Stop run.
Entry  Wed Nov 8 20:40:33 2017, Daid, Ruchi, Run 49 
Header: First test with RIB.  Irises closed.
End: End
Entry  Thu Nov 16 16:24:29 2017, RG CLW MD, Run 173 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side, trigger on HI detector this time
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:14:04 2017, RG CLW MD, Run 172 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:06:07 2017, RG CLW MD, Run 171 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 9 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:57:29 2017, RG CLW MD, Run 170 Pulse Walkthrough HI p-side  
Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 10 V in steps of 1, 250 Hz
====================================================
Entry  Thu Nov 16 15:43:48 2017, RG CLW MD, Run 169 Pulse Walkthrough E n-side  
Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 6 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:33:24 2017, RG CLW MD, Run 168 Pulse Walkthrough E p-side  
Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 6 V in steps of 0.5, 250 Hz
====================================================
Entry  Thu Nov 16 15:37:35 2017, RG, MD, CLW, Run 167 JUNK 
 
Entry  Thu Nov 16 15:24:42 2017, RG CLW MD, Run 166 Pulse Walkthrough dE n-side  
Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 7 on
dial, att. 5, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:14:39 2017, RG CLW MD, Run 165 Pulse Walkthrough dE p-side  
Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 1.6 V in steps of 0.2, 250 Hz
====================================================
Entry  Thu Nov 16 11:20:51 2017, RG CLW MD, Run 162 -HI det calibration 
Header: 4alpha source - Heavy Ion detector calibration
Ender: 
====================================================
Entry  Wed Nov 15 16:24:35 2017, RG CLW, Run 160 - strip numbering E detector 
Header: 4alpha source off center (to the top)
Ender: 
====================================================
Entry  Wed Nov 15 16:05:25 2017, RG CLW, Run 159 - E detector calibration 
Header: 4alpha source run for E det calubration
Ender: 
====================================================
Entry  Wed Nov 15 15:41:41 2017, RG CLW, Run 157 - EJunk 
Header: 4alpha source
Ender: 
====================================================
Entry  Wed Nov 15 11:33:31 2017, RG CLW, Run 155 - calibration del E 
Header: 4alpha source run for delE detector calibration
Ender: 
====================================================
Entry  Wed Nov 15 05:26:46 2017, DK, MD, CLW, Run 153 
Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
ELOG V3.1.4-unknown