AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 7 of 11  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Nov 10 10:46:54 2017, SL, Investigation of E detector thickness 
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.

The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V
Entry  Fri Nov 10 08:31:06 2017, TD, CAEN V767 TDC trigger/channel 0 logic change 
Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data

Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
Entry  Fri Nov 10 07:00:14 2017, MD, CLW, ASM, TD, Run 80 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg

Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
Entry  Fri Nov 10 04:53:34 2017, MD, ASM, Run 79 171110_only2of4cycles_problemRing2.jpg
Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Entry  Fri Nov 10 04:18:41 2017, MD, ASM, Run 78 
Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
Entry  Fri Nov 10 02:12:06 2017, MD, ASM, DK, Run 77 

Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender: 
Entry  Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75 
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
Entry  Thu Nov 9 23:10:38 2017, MD, preparation for Carbon C_09 (Run 75) 
10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
Entry  Thu Nov 9 21:31:16 2017, SL, Run 74 Screen_Shot_2017-11-09_at_22.35.20.pngScreen_Shot_2017-11-09_at_22.38.49.pngScreen_Shot_2017-11-10_at_13.54.40.png

Header: 4.7 MeV/u and CH2_30+25. 
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date :
09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) : 
Blocks written : 422
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 20:46:29 2017, SL, Run 73 Screen_Shot_2017-11-09_at_22.38.49.png

Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run
number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) : 
Blocks written : 263
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
Entry  Thu Nov 9 19:06:08 2017, SL, Run 68-71 
JUNK
Entry  Thu Nov 9 18:56:13 2017, SL, Run 72 

Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
Run number : 72
Date : 09/11
Start time :
20:14
Stop time : 21:41
Trigger rate (MIDAS) : 
Blocks written : 570
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 12
1- Gated                        : 10
2- dE                           : 59
3- E        
Entry  Thu Nov 9 17:35:32 2017, RG, Run 67 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 67
Date : 09/11
Start time :
18:30
Stop time : 19:57 
Trigger rate (MIDAS) : 10 
Blocks written : 463
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 10
1- Gated                        : 9
2- dE                           : 48
3- E         
Entry  Thu Nov 9 17:01:49 2017, TD, CAEN V560 Scalers added to datastream 
CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
Entry  Thu Nov 9 16:30:15 2017, SL, Run 66 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender: 
====================================================
Run
number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS)         : 
Blocks written         : 84
——————————————————————————————
Run
Scalars
0- Ungated                      : 14
1- Gated                        : 12
2- dE                           : 51
3- E                       
Entry  Thu Nov 9 15:55:56 2017, SL, Run 65 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS)         : 
Blocks written         : 179
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 50
3- E                       
Entry  Thu Nov 9 15:34:14 2017, SL, Run 64 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run
number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS)         : 
Blocks written         : 102
——————————————————————————————
Run
Scalars
0- Ungated                      : 10
1- Gated                        : 10
2- dE                           : 75
3- E                       
Entry  Thu Nov 9 15:03:21 2017, SL, Run 63 

Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender: 
====================================================
Run
number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS)         : 
Blocks written         : 270
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 56
1- Gated                        : 34
2- dE                           : 43
3- E        
Entry  Thu Nov 9 12:15:33 2017, SL, TIMBER: Faraday Cup Measurements 
Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17).
Entry  Thu Nov 9 12:14:05 2017, SL, Run 62 

Header: 4.7 MeV/u and CH2_30+25. 
Ender: 
====================================================
Run number : 62
Date : 9 / 11
Start time :
13:55
Stop time : 16:03
Trigger rate (MIDAS)         : 50
Blocks written         : 1299
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 
1- Gated                        : 
2- dE                           : 
3- E              
ELOG V3.1.4-unknown