Fri Nov 10 10:46:54 2017, SL, Investigation of E detector thickness
|
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.
The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V |
Fri Nov 10 08:31:06 2017, TD, CAEN V767 TDC trigger/channel 0 logic change
|
Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data
Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
|
Fri Nov 10 07:00:14 2017, MD, CLW, ASM, TD, Run 80 
|
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
|
Fri Nov 10 04:53:34 2017, MD, ASM, Run 79
|
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
|
Fri Nov 10 04:18:41 2017, MD, ASM, Run 78
|
Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
|
Fri Nov 10 02:12:06 2017, MD, ASM, DK, Run 77
|
Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender:
|
Fri Nov 10 01:29:51 2017, ASM, MD, DK, run 75
|
Header: 4.7 MeV/u and C_09. PS back, but need to check how much beam actually there was before next issue
Ender: no beam at our sample; IHS cavity (part of normal conducting linac) tripped
====================================================
|
Thu Nov 9 23:10:38 2017, MD, preparation for Carbon C_09 (Run 75)
|
10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
Thu Nov 9 21:31:16 2017, SL, Run 74  
|
Header: 4.7 MeV/u and CH2_30+25.
Ender: STOP due to PSB fire.
====================================================
Run number : 74
Date :
09/11
Start time : 22:33
Stop time : 23:42
Trigger rate (MIDAS) :
Blocks written : 422
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E |
Thu Nov 9 20:46:29 2017, SL, Run 73
|
Header: 4.7 MeV/u and CH2_30+25.
Ender: NO BEAM FROM PSB - called CCC and stopped run.
====================================================
Run
number : 73
Date : 09/11
Start time : 21:44
Stop time : 22:25
Trigger rate (MIDAS) :
Blocks written : 263
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E |
Thu Nov 9 19:06:08 2017, SL, Run 68-71
|
JUNK |
Thu Nov 9 18:56:13 2017, SL, Run 72
|
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 72
Date : 09/11
Start time :
20:14
Stop time : 21:41
Trigger rate (MIDAS) :
Blocks written : 570
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated : 12
1- Gated : 10
2- dE : 59
3- E |
Thu Nov 9 17:35:32 2017, RG, Run 67
|
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 67
Date : 09/11
Start time :
18:30
Stop time : 19:57
Trigger rate (MIDAS) : 10
Blocks written : 463
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated : 10
1- Gated : 9
2- dE : 48
3- E |
Thu Nov 9 17:01:49 2017, TD, CAEN V560 Scalers added to datastream
|
CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
|
Thu Nov 9 16:30:15 2017, SL, Run 66
|
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run
number : 66
Date : 9 / 11
Start time : 18:09
Stop time : 18:30
Trigger rate (MIDAS) :
Blocks written : 84
——————————————————————————————
Run
Scalars
0- Ungated : 14
1- Gated : 12
2- dE : 51
3- E |
Thu Nov 9 15:55:56 2017, SL, Run 65
|
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (E - corrected, not HI, now ~50% live time)
Ender:
====================================================
Run
number : 65
Date : 9 / 11
Start time : 16:56
Stop time : 17:27
Trigger rate (MIDAS) :
Blocks written : 179
——————————————————————————————
Run
Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 50
3- E |
Thu Nov 9 15:34:14 2017, SL, Run 64
|
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (JUST E, not HI, now ~50% live time)
Ender: Stopping as trigger seems slightly off
====================================================
Run
number : 64
Date : 9 / 11
Start time : 16:38
Stop time : 16:56
Trigger rate (MIDAS) :
Blocks written : 102
——————————————————————————————
Run
Scalars
0- Ungated : 10
1- Gated : 10
2- dE : 75
3- E |
Thu Nov 9 15:03:21 2017, SL, Run 63
|
Header: 4.7 MeV/u and CH2_30+25. UPDATED Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run
number : 63
Date : 9 / 11
Start time : 16:03
Stop time : 16:33
Trigger rate (MIDAS) :
Blocks written : 270
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated : 56
1- Gated : 34
2- dE : 43
3- E |
Thu Nov 9 12:15:33 2017, SL, TIMBER: Faraday Cup Measurements
|
Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17). |
Thu Nov 9 12:14:05 2017, SL, Run 62
|
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run number : 62
Date : 9 / 11
Start time :
13:55
Stop time : 16:03
Trigger rate (MIDAS) : 50
Blocks written : 1299
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated :
1- Gated :
2- dE :
3- E |