Entry  Thu Nov 9 10:15:38 2017, Sarah Lonsdale, Run 61 

Header: 5.0 MeV/u and Carbon (C_25). 
Ender: 
====================================================
Run number : 61
Date : 9 / 11
Start
time : 11:19
Stop time : 12:04
Trigger rate (MIDAS)         : 1205
Blocks written         : 482
——————————————————————————————
Run
Scalars (approx rates)
0- Ungated                      : 500
1- Gated                        : 100
2- dE                           : 5
3- E       
Entry  Thu Nov 9 09:49:03 2017, Sarah Lonsdale, Run 60 

Header: 5.0 MeV/u and Empty Frame.  Tuned beam to lower scatter, solved dE counting issue. Pulser scaler has been added.
Ender: 
====================================================
Run
number : 60
Date : 9 / 11
Start time : 10:50
Stop time : 11:14
Trigger rate (MIDAS)         : 20
Blocks written         : 180
——————————————————————————————
Beam
energy : 5.0 MeV/u
Beam intensity         : 1.5 to 2.0 epA **
Target : #7 Empty Frame
Ladder position         : 52.09 mm
HI Degrader foil (um) :
Entry  Thu Nov 9 08:20:21 2017, Claudia, Restarting Target Current & Line Current 
0) If target or line drop, STOP THE BEAM!!

1) If you SEE target or line current go down (top right window of monitors next to the corridor): 

Use Knobs open application (monitor below); remember set value; type 0 in set window; click Mode - Reset; click Mode - On. increase current in
Entry  Thu Nov 9 07:15:49 2017, MD, Tips for Babysitting ISOLDE during shifts Babysitting_ISOLDE_from_the_CCC.pdf
from ISOLDE webpage
Entry  Thu Nov 9 06:30:35 2017, Daid, Mirco, Spectra (Shift 1) 12x
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2
target.
Entry  Thu Nov 9 06:02:41 2017, Daid. Mirco, Run 57 
Header: Continue with 5.0 MeV/u and CH2.  Laser back on.
Ender: 
====================================================
Entry  Thu Nov 9 05:35:44 2017, Daid. Mirco, Run 56 

Header: 5.0 MeV/u CH2, Laser 2 is turned off on purpose to check background.
Ender: Could not see many real events beside pulser and current was very low
Entry  Wed Nov 8 23:46:32 2017, Daid, Charge State Distributions  charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.

The effect could be as much as 10 to 20%.  At some point, we should check the Faraday cup reading with the CH2 target and with the empty target.
    Reply  Thu Nov 9 05:33:50 2017, TD, Charge State Distributions  
> Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu 
beam energy.
Entry  Thu Nov 9 03:32:55 2017, Daid. Mirco, Run 55 gps-r55.jpgpsb-run55.jpg
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Entry  Thu Nov 9 01:24:01 2017, Daid. Mirco, Run 54 
Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.  Target current is 2 A (low...should be 430 A).  No beam seen at our FC, although MIDAS seemed to have events.
NB: You can monitor the target current on any network computer via: https://op-webtools.web.cern.ch/Vistar/vistars.php?usr=GPS 
Entry  Wed Nov 8 23:14:38 2017, Daid, Ruchi, Mirco, Run 53 
Header: Restart 5.0 MeV/u w/ CH2 after PS comes back (3 rings until the morning)
Ender: End
====================================================
Entry  Wed Nov 8 23:06:48 2017, Daid, Ruchi, Run 52 (junk) 
(Junk -- see comments)
====================================================
Run number : 52
Entry  Wed Nov 8 22:21:35 2017, Ruchi, Beam transmission 
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
Entry  Wed Nov 8 22:08:55 2017, Daid, Run 51 
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Entry  Wed Nov 8 22:00:00 2017, daid, Scalars 
Present scalars:
0: Ungated
1: Gated
Entry  Wed Nov 8 21:21:31 2017, Ruchi Garg, Daid, RunLogTemplate 
Header:
Ender: 
====================================================
Entry  Wed Nov 8 20:46:23 2017, Daid, Ruchi, Run 50 
Header: First run with irises open.  30 min run.
Ender: Call from PS-Booster.  Stop run.
Entry  Wed Nov 8 20:40:33 2017, Daid, Ruchi, Run 49 
Header: First test with RIB.  Irises closed.
End: End
Entry  Wed Nov 8 17:12:01 2017, TD, MIDAS logs snoop.logvmecpu.log
Attachment 1 - snoop -d bge1 log following MVME CPU reset

Attachment 2 - VME CPU system console
Entry  Tue Nov 7 14:38:25 2017, Ruchi Garg, Target ladder configuration TargetLadder.pdf
 