AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nTOFCapture, Page 3 of 4  ELOG logo
ID Date Authorup Subject
  14   Mon Sep 7 13:57:28 2020 Nikolay SosninSAMMY Fits Au197: Monday Meeting 07.08.2020
Attachment 1: SAMMY_Gold.pptx
  15   Mon Sep 14 13:47:26 2020 Nikolay SosninSummed WF: Monday Meeting 14.09.2020
Attachment 1: Sum_Spectra.pptx
  16   Tue Sep 29 18:36:03 2020 Nikolay SosninSAMMY Fits to Known Se77 Resonances: Meeting 28.09.2020
Attachment 1: SAMMY_Fits_Se77.pptx
  21   Mon Oct 5 14:54:55 2020 Nikolay SosninOverall Progress: Monday Meeting 05.10.2020
Attachment 1: Selenium_Data.pptx
  23   Mon Jan 25 16:11:54 2021 Nikolay Sosnin25.01.2021: Cross-section Calculation Update
Attachment 1: Unresolved_Normalization_1.pptx
  25   Sat Mar 19 17:29:43 2022 Nikolay SosninAl26 Experimental Inventory at n_TOF

Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached and photos can be found on Dropbox:

https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0

Attachment 1: Al26_Inventory.pdf
Al26_Inventory.pdf Al26_Inventory.pdf Al26_Inventory.pdf
  33   Sat Jul 15 07:33:32 2023 Nikolay Sosnin30Si EAR2

8 sTED + 2 C6D6

C6D6: distance = 14 cm, angle = 135 degrees

sTED horizontal ring, distance for each detector from target = 4.5 cm. sTED labeled 8 in the DAQ is actually sTED #9 at n_TOF (actual sTED #8 showed no signal)

sTED1 809V, sTED2 793V, sTED3 813V, sTED4 779V, sTED5 785V, sTED6 800V, sTED7 791V, sTED8 837V

C6D61 (labeled C6D6_M in HV log) 854V, C6D62 (labeled C6D6_N in HV log) 871V

Attachment 1: C6D6_sTED.JPG
C6D6_sTED.JPG
Attachment 2: sTED_Ring_Cs137.JPG
sTED_Ring_Cs137.JPG
Attachment 3: C6D6_sTED_Side.JPG
C6D6_sTED_Side.JPG
Attachment 4: Beam_Kapton_Setup.JPG
Beam_Kapton_Setup.JPG
Attachment 5: EAR2_Setup2.JPG
EAR2_Setup2.JPG
Attachment 6: EAR2_Setup.JPG
EAR2_Setup.JPG
  34   Mon Jul 17 10:06:35 2023 Nikolay SosninState of the Union: Campaign Update 17.07.2023

EAR1: Si-nat sample fell off the holder during maintenance (before run 116544), appears intact and undamaged. Placed it back in-beam for further EAR1 measurements and subsequent transfer to EAR2.

EAR2: Replaced DUMMY with 30Si. Photo during alignment and photo of sample in holder attached.

Attachment 1: Sinat_PostFall.JPG
Sinat_PostFall.JPG
Attachment 2: EAR2_30Si_Alignment.JPG
EAR2_30Si_Alignment.JPG
Attachment 3: EAR2_30Si.JPG
EAR2_30Si.JPG
  36   Mon Jul 17 12:30:28 2023 Nikolay SosninSi-nat Goodfellow Sample Properties

Goodfellow sample has been deposited on a single Mylar foil and glue is drying.

mass = 2.932 g

diameter = 20.0 mm

thickness = 3.98 mm

Attachment 1: Sinat_Sample_Properties.JPG
Sinat_Sample_Properties.JPG
  37   Mon Jul 17 14:49:16 2023 Nikolay SosninMounted Si-nat Sample

Goodfellow Si-nat mounted at EAR1. First run: 116551

Attachment 1: Sinat_Back.JPG
Sinat_Back.JPG
Attachment 2: Sinat_Front.JPG
Sinat_Front.JPG
Attachment 3: Sinat_Sample.JPG
Sinat_Sample.JPG
  42   Mon Jul 31 12:00:02 2023 Nikolay SosninEAR2 Silicon Samples
Attachment 1: EAR2_30Si.JPG
EAR2_30Si.JPG
Attachment 2: EAR2_Sinat_Closeup.JPG
EAR2_Sinat_Closeup.JPG
Attachment 3: Goodfellow_Sinat_Sample.JPG
Goodfellow_Sinat_Sample.JPG
Attachment 4: Laser_Alignment.JPG
Laser_Alignment.JPG
  17   Fri Oct 2 13:47:59 2020 RGMonday meeting slides: 07 Sep

Proton consistency test (BCT, SiMon, weighted, unweigted, dedicated, parasitic) - Au cal1 and Se78
BG subtraction
TOF to En conversion
 

Attachment 1: 2020_09_07.pdf
2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf 2020_09_07.pdf
  18   Fri Oct 2 13:55:52 2020 RGMonday meeting slides: 14 Sep

Discrepancy between dedicated and parasitic pulses histograms in the 5eV gold resonance plateau region.

Corrected tof to En conversion.

E_excitation and flux normalisation of yield.

Attachment 1: 2020_09_14.pdf
2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf 2020_09_14.pdf
  19   Fri Oct 2 13:59:05 2020 RGMonday meeting slides: 21 Sep

Dedicated and parasitic discrepancy (Au 5eV resonance plateau) - quantified.

Flux and E_exc numalisation after sum WF.

Attachment 1: 2020_09_21.pdf
2020_09_21.pdf 2020_09_21.pdf 2020_09_21.pdf 2020_09_21.pdf 2020_09_21.pdf
  20   Fri Oct 2 14:01:24 2020 RGMonday meeting slides: 28 Sep

Further investigation into dedicated and parasitic discrepancy.

Attachment 1: 2020_09_28.pdf
2020_09_28.pdf 2020_09_28.pdf 2020_09_28.pdf 2020_09_28.pdf 2020_09_28.pdf
  22   Mon Oct 5 15:01:04 2020 RGMonday meeting slides: 05 Oct

Summary of work done so far.

Attachment 1: 2020_10_05_SummarySoFar.pdf
2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf 2020_10_05_SummarySoFar.pdf
  26   Fri Jul 29 17:21:47 2022 RaganEnriched Si-30

Attached are the pictures of enriched Si-30 metal pieces.

Attachment 1: IMG_2692.jpg
IMG_2692.jpg
Attachment 2: IMG_2693.jpg
IMG_2693.jpg
  4   Mon Oct 28 16:15:32 2019 RuchiZn68 measurement setup
Attachment 1: IMG_3009.JPG
IMG_3009.JPG
Attachment 2: IMG_3010.JPG
IMG_3010.JPG
  8   Fri Aug 7 10:39:18 2020 RuchiTTOFSort processing macro and files path

/eos/user/r/rugarg/public/2017_10_ng_ZnSe/

Latest 4 processing scripts:
1. process_runs_Au1_Jul20.C = Au runs (Se78 part), empty holder runs (Se78 part), and beam-off runs (Se78 part) processed with Au weighting function and set1 of calibration parameters.
2. process_runs_Au2_Jul20.C = Au runs (Se77 part), empty holder runs (Se77 part), and beam-off runs (Se77 part) processed with Au weighting function and set2 of calibration parameters.
3. process_runs_Se78_Jul20.C = Se78 runs, empty holder runs, beam-off runs, C runs, and filter runs processed with Se78 weighting function and set1 of calibration parameters.
4. process_runs_Se77_Jul20.C = Se77 runs, empty holder runs, beam-off runs, and filter runs processed with Se77 weighting function and set2 of calibration parameters.

  9   Fri Aug 7 10:50:57 2020 RuchiMonday meeting slides: 06 Jul
Attachment 1: 2020_07_06.pdf
2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf 2020_07_06.pdf
ELOG V3.1.4-unknown