ID |
Date |
Author |
Subject |
Text |
 |
52
|
Thu Aug 10 16:11:57 2023 |
TD, NS, AR | Noise |
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure. |
  |
56
|
Fri Aug 11 10:02:08 2023 |
TD, NS, AR | Noise |
Check RAL108 +/-15V PSU
|
 |
63
|
Tue Aug 15 10:17:39 2023 |
TD, NS | RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August | On the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether |
7x |
64
|
Tue Aug 15 11:41:27 2023 |
TD, NS | Monday 14 August - vacuum chamber pressure |
08.35 Vacuum chamber pressure OK - see attachment
1 |
|
43
|
Thu Jul 27 11:53:52 2023 |
TD | MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF | MSL type W1(SS)-20
3186-9 20um Depletion voltage 3V Operating |
|
62
|
Mon Aug 14 11:00:13 2023 |
TD | RAL108 +/-15V PSU test in ISOLDE hall |
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE |
13x |
66
|
Sat Aug 19 14:14:26 2023 |
TD | RAL108 +/-15V PSU test - JCMB 18.8.23 | PSU Calex
Setup and PSU details - attachments 1-3
|
10x |
67
|
Mon Aug 21 12:08:59 2023 |
TD | RAL108 +/-15V PSU test - JCMB 21.8.23 | PSU Calex
Setup, PSU and ac mains filter - attachments |
13x |
79
|
Sat Sep 14 09:30:40 2024 |
TD | Neutron beam profile |
Neutron beam profile - film exposure overnight
12/13.9.24 |
|
80
|
Mon Sep 16 12:36:45 2024 |
TD | 34-way IDC to 37-way D connector ribbon cables |
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha |
   |
1
|
Mon Oct 12 11:27:02 2015 |
Sarah Lonsdale | 05/10/15 - Set up notes | |
8x |
2
|
Mon Oct 12 11:50:52 2015 |
Sarah Lonsdale | 05/10/15 Pulser, Wiring information and DAQ initial set up | |
   |
3
|
Mon Oct 12 12:04:51 2015 |
Sarah Lonsdale | 05/10/15 Photo of detector distances and layout | Fairly self explanatory, note that images
with time-stamps before 13.08.29 were taken
before fitting the o-ring on the flange and |
8x |
4
|
Mon Oct 12 12:07:24 2015 |
Sarah Lonsdale | 05/10/15 Changes to DAQ settings | Note that detailed DAQ information
available from project-ntof.cern.ch erunbook
ear2. |
|
6
|
Fri Oct 16 15:36:13 2015 |
Sarah Lonsdale | 06/10/15 Leakage, dE signal problem solving and external pulser trigger | |
6x |
7
|
Fri Oct 16 15:41:14 2015 |
Sarah Lonsdale | 06/10/15 Changes to DAQ and pulser settings | |
 |
8
|
Fri Oct 16 15:56:01 2015 |
Sarah Lonsdale | 07/10/15 Alpha source in, change to pulser delay | |
6x |
9
|
Fri Oct 16 16:01:41 2015 |
Sarah Lonsdale | 08/10/15 Removed source and sample, leakage current check | Removed source and removed Li sample for
blank frame test
|
|
10
|
Fri Oct 16 16:11:41 2015 |
Sarah Lonsdale | 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current | |
    |
11
|
Wed Jul 27 13:20:53 2016 |
Sarah | Gafchromic images | |
6x |