AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 2 of 4  ELOG logo
ID Date Authordown Subject Text Attachments
  14   Sun Jul 31 14:32:34 2016 SarahDEED1 Alpha calibration checks (205168) DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
  
  15   Sun Jul 31 15:02:57 2016 SarahDEED6 Alpha calibration checks (205168) DEED6: (1 bin = 2 ch)
  
  16   Sun Jul 31 15:56:32 2016 SarahDEED16 Alpha calibration checks (205169)***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
  
  17   Tue Aug 2 08:14:26 2016 SarahLeakage currents spreadsheet (26/07- 01/08) Steady for dE, E. Possibly rising
on PHDI- monitor closely.
 Leakage_currents.xlsx 
  18   Wed Aug 3 09:48:31 2016 SarahEFED10 alpha calibration checks 
  
  19   Wed Aug 3 14:48:09 2016 SarahLeakage currents 02.08 - 03.08 02.08:
dE = 0.03 uA
E = 0.03 uA
  
  20   Mon Aug 8 11:02:13 2016 SarahLeakage currents 08.08.16 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA
  
  21   Tue Aug 9 15:57:52 2016 SarahLeakage currents 09.08.16 Morning - 9am
E= 0.03uA
dE= 0.04uA
  
  22   Thu Aug 11 08:19:37 2016 SarahLeakage currents 10.8.16 At lunchtime (12.45)
E = 0.03 uA
dE  = 0.04 uA
  
  23   Wed Aug 17 15:10:05 2016 SarahLeakage currents 12.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA
  
  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16E 0.03
dE 0.05
PHDI 0.12
  
  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed14 bit card replaced for DEED 9-12, to
prevent issue with pulser arriving before
gamma flash.
  
  27   Fri Sep 9 10:01:18 2016 SarahLeakage currents 09.09.16EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA
  
  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulserChanged from LiF 4 to LiF 3 after running
with LiF 4 overnight (run title on n_TOF
DAQ was not updated to refelect the change,
  
  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2Photographs of assembly up to the first
pulser test with LiF3.
 25x 
  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 1.75 microsecond delay from gamma flash
  
  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 11 microsecond delay from gamma flash to
  
  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser SettingThe pulser has been switched from triggering
from beam trigger to running at a 10 Hz rate,
and will now appear in random places in signal
  
  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of ConcernDEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline
throughout the campaign.
  
  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target SeparationIncreased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one
 17x 
ELOG V3.1.4-unknown