  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings   IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG 
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set upPhtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
 15x 
  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure.
 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG 
  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target   18x 
  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM   23x 
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics FoilGafchromics foil was mounted on empty brass
frame back to back with Li sample

Neutron beam goes well through
 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering   Al26_Filtering.pptx 
  43   Thu Jul 27 11:53:52 2023 TDMSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOFMSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating
  
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERNBox 1

1. RC412 Cables

2. Screws and parts for rails
  
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement21:15 Changed from detectors in-beam to
boron-10 sample 3 in-beam (in-beam measurement
got 1000 triggers, 500 of which were dedicated).
 14x 
  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no targetAfter long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3.
 12x 
  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target SeparationIncreased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one
 17x 
  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of ConcernDEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline
throughout the campaign.
  
  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser SettingThe pulser has been switched from triggering
from beam trigger to running at a 10 Hz rate,
and will now appear in random places in signal
  
  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 11 microsecond delay from gamma flash to
  