ID Date Author Subject Text Attachments
  74   Tue Apr 16 12:24:01 2024 EmmanuelMWD amplitude (dE and E)   26Al_PDF.pdf 
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  72   Thu Dec 7 09:48:23 2023 EmmanuelMWDdetector and User InputMWDdetector and UserInput  UserInput_Silicons.hMWDdetector.cc 
  71   Mon Oct 2 08:53:06 2023 EmmanuelEmpty FrameAn empty frame (on the top) was placed
on Friday night.
 Empty_Frame.jpeg 
  70   Thu Sep 28 15:32:16 2023 EmmanuelLiF sample inWe switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day.
 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg 
  69   Wed Sep 27 09:54:06 2023 Emmanuel10B sample inWe switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg 
  68   Tue Sep 5 16:09:45 2023 EmmanuelDrop in gain for DEED 14Dear all,

There was an issue with one of
the strips of the deltaE detector (DEED 14),
 alndeed14.pngalndeed14b.pngalndeed14old.png 
  67   Mon Aug 21 12:08:59 2023 TDRAL108 +/-15V PSU test - JCMB 21.8.23PSU Calex

Setup, PSU and ac mains filter - attachments
 13x 
  66   Sat Aug 19 14:14:26 2023 TDRAL108 +/-15V PSU test - JCMB 18.8.23PSU Calex

Setup and PSU details - attachments 1-3
 10x 
  65   Thu Aug 17 10:26:51 2023 Nikolay SosninData ProcessingTo run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using
  
  64   Tue Aug 15 11:41:27 2023 TD, NSMonday 14 August - vacuum chamber pressure
08.35 Vacuum chamber pressure OK - see attachment
1
 20230814_083514.jpg 
  63   Tue Aug 15 10:17:39 2023 TD, NSRAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 AugustOn the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
 7x 
  62   Mon Aug 14 11:00:13 2023 TDRAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
 13x 
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al ProtonsHere is a Google spreadsheet for counting
protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
  
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
 EDET24_Card.JPGEDET24_Cable.JPG 
  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect CablingE front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
  
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet infoSpreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
 IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG 
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check   IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG 
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU
 20230811_104233.jpg20230811_104253.jpg 
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scansProcessed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye.
 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG 
  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings   IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG 
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set upPhtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
 15x 
  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure.
 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG 
  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target   18x 
  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM   23x 
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics FoilGafchromics foil was mounted on empty brass
frame back to back with Li sample

Neutron beam goes well through
 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering   Al26_Filtering.pptx 
  43   Thu Jul 27 11:53:52 2023 TDMSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOFMSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating
  
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERNBox 1

1. RC412 Cables

2. Screws and parts for rails
  
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement21:15 Changed from detectors in-beam to
boron-10 sample 3 in-beam (in-beam measurement
got 1000 triggers, 500 of which were dedicated).
 14x 
  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no targetAfter long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3.
 12x 
  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target SeparationIncreased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one
 17x 
  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of ConcernDEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline
throughout the campaign.
  
  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser SettingThe pulser has been switched from triggering
from beam trigger to running at a 10 Hz rate,
and will now appear in random places in signal
  
  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 11 microsecond delay from gamma flash to
  
  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser DelayStill using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 1.75 microsecond delay from gamma flash
  
  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2Photographs of assembly up to the first
pulser test with LiF3.
 25x 
  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulserChanged from LiF 4 to LiF 3 after running
with LiF 4 overnight (run title on n_TOF
DAQ was not updated to refelect the change,
  
  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cablingSetup 5.10.22

dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg 
  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next runMissing/broken items identified

- long rails for fixing chamber
on support
 20221005_122654.pdf 
  28   Thu May 26 09:20:32 2022 Nick / ClaudiaInventory of Items at n_TOF for (n,cp) experimentsDetectors currently in the boxes:

2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um)
 rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpgrn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg 
  27   Fri Sep 9 10:01:18 2016 SarahLeakage currents 09.09.16EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA
  
  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed14 bit card replaced for DEED 9-12, to
prevent issue with pulser arriving before
gamma flash.
  
  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16E 0.03
dE 0.05
PHDI 0.12
  
  24   Tue Aug 23 15:34:38 2016 ClaudiaLeakage currents 23.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
  
  23   Wed Aug 17 15:10:05 2016 SarahLeakage currents 12.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA
  
  22   Thu Aug 11 08:19:37 2016 SarahLeakage currents 10.8.16 At lunchtime (12.45)
E = 0.03 uA
dE  = 0.04 uA
  
  21   Tue Aug 9 15:57:52 2016 SarahLeakage currents 09.08.16 Morning - 9am
E= 0.03uA
dE= 0.04uA
  
  20   Mon Aug 8 11:02:13 2016 SarahLeakage currents 08.08.16 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA
  
  19   Wed Aug 3 14:48:09 2016 SarahLeakage currents 02.08 - 03.08 02.08:
dE = 0.03 uA
E = 0.03 uA
  
  18   Wed Aug 3 09:48:31 2016 SarahEFED10 alpha calibration checks 
  
  17   Tue Aug 2 08:14:26 2016 SarahLeakage currents spreadsheet (26/07- 01/08) Steady for dE, E. Possibly rising
on PHDI- monitor closely.
 Leakage_currents.xlsx 
  16   Sun Jul 31 15:56:32 2016 SarahDEED16 Alpha calibration checks (205169)***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
  
  15   Sun Jul 31 15:02:57 2016 SarahDEED6 Alpha calibration checks (205168) DEED6: (1 bin = 2 ch)
  
  14   Sun Jul 31 14:32:34 2016 SarahDEED1 Alpha calibration checks (205168) DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
  
  13   Sun Jul 31 13:43:56 2016 SarahAlpha spectra Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
 DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe 
  12   Thu Jul 28 16:00:43 2016 SarahList of to-dosProcess alpha data
- Compare pulser width and alpha width
to calibration spectra (shaping amp with
  
  11   Wed Jul 27 13:20:53 2016 SarahGafchromic images   6x 
  10   Fri Oct 16 16:11:41 2015 Sarah Lonsdale09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current   2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg 
  9   Fri Oct 16 16:01:41 2015 Sarah Lonsdale08/10/15 Removed source and sample, leakage current checkRemoved source and removed Li sample for
blank frame test
  
  8   Fri Oct 16 15:56:01 2015 Sarah Lonsdale07/10/15 Alpha source in, change to pulser delay   6x 
  7   Fri Oct 16 15:41:14 2015 Sarah Lonsdale06/10/15 Changes to DAQ and pulser settings   2015-10-06_delay.jpg2015-10-06_trig.jpg 
  6   Fri Oct 16 15:36:13 2015 Sarah Lonsdale06/10/15 Leakage, dE signal problem solving and external pulser trigger   6x 
  5   Tue Oct 13 21:04:49 2015 Claudia LedererPhotos of Test Setup 5-10 October 2015some photos in high resolution of the test
setup 5-10 October 2015
 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG 
  4   Mon Oct 12 12:07:24 2015 Sarah Lonsdale05/10/15 Changes to DAQ settings Note that detailed DAQ information
available from project-ntof.cern.ch erunbook
ear2.
  
  3   Mon Oct 12 12:04:51 2015 Sarah Lonsdale05/10/15 Photo of detector distances and layoutFairly self explanatory, note that images
with time-stamps before 13.08.29 were taken
before fitting the o-ring on the flange and
 8x 
  2   Mon Oct 12 11:50:52 2015 Sarah Lonsdale05/10/15 Pulser, Wiring information and DAQ initial set up   2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg 
  1   Mon Oct 12 11:27:02 2015 Sarah Lonsdale05/10/15 - Set up notes   8x 