AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 3 of 4
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
73 Entries
Goto page
Previous
1
,
2
, 3,
4
Next
All
ID
Date
Author
Subject
Text
33
Thu Oct 6 14:58:29 2022
Nikolay Sosnin
Change of Pulser Delay
Still using pulser triggered from protons.
12 microsecond delay from protons to gamma-flash
+ 1.75 microsecond delay from gamma flash
32
Thu Oct 6 11:45:39 2022
Nikolay Sosnin
Assembly Setup Days 1 and 2
Photographs of assembly up to the first
pulser test with LiF3.
25x
31
Thu Oct 6 11:07:47 2022
Nikolay Sosnin
Change of sample/Addition of pulser
Changed from LiF 4 to LiF 3 after running
with LiF 4 overnight (run title on n_TOF
DAQ was not updated to refelect the change,
30
Thu Oct 6 09:34:30 2022
Claudia
Test setup Photos and cabling
Setup 5.10.22
dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
29
Thu Oct 6 09:28:33 2022
Claudia
Items to be replaced for next run
Missing/broken items identified
- long rails for fixing chamber
on support
28
Thu May 26 09:20:32 2022
Nick / Claudia
Inventory of Items at n_TOF for (n,cp) experiments
Detectors currently in the boxes:
2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um)
27
Fri Sep 9 10:01:18 2016
Sarah
Leakage currents 09.09.16
EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA
26
Fri Sep 2 12:03:40 2016
Sarah
SPD card changed
14 bit card replaced for DEED 9-12, to
prevent issue with pulser arriving before
gamma flash.
25
Fri Sep 2 12:01:57 2016
Sarah
Leakage currents 02.09.16
E 0.03
dE 0.05
PHDI 0.12
24
Tue Aug 23 15:34:38 2016
Claudia
Leakage currents 23.08.16
E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
23
Wed Aug 17 15:10:05 2016
Sarah
Leakage currents 12.08.16
E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA
22
Thu Aug 11 08:19:37 2016
Sarah
Leakage currents 10.8.16
At lunchtime (12.45)
E = 0.03 uA
dE = 0.04 uA
21
Tue Aug 9 15:57:52 2016
Sarah
Leakage currents 09.08.16
Morning - 9am
E= 0.03uA
dE= 0.04uA
20
Mon Aug 8 11:02:13 2016
Sarah
Leakage currents 08.08.16
E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA
19
Wed Aug 3 14:48:09 2016
Sarah
Leakage currents 02.08 - 03.08
02.08:
dE = 0.03 uA
E = 0.03 uA
18
Wed Aug 3 09:48:31 2016
Sarah
EFED10 alpha calibration checks
17
Tue Aug 2 08:14:26 2016
Sarah
Leakage currents spreadsheet (26/07- 01/08)
Steady for dE, E. Possibly rising
on PHDI- monitor closely.
16
Sun Jul 31 15:56:32 2016
Sarah
DEED16 Alpha calibration checks (205169)
***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
15
Sun Jul 31 15:02:57 2016
Sarah
DEED6 Alpha calibration checks (205168)
DEED6: (1 bin = 2 ch)
14
Sun Jul 31 14:32:34 2016
Sarah
DEED1 Alpha calibration checks (205168)
DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
Goto page
Previous
1
,
2
, 3,
4
Next
All
ELOG V3.1.4-unknown