|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
nToF, Page 2 of 5 |
 |
|
Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings
|
Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
|
Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 
|
Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
|
Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check
|
Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current    
|
Wed Jul 27 13:20:53 2016, Sarah, Gafchromic images 6x
|
Thu Jul 28 16:00:43 2016, Sarah, List of to-dos
|
Sun Jul 31 13:43:56 2016, Sarah, Alpha spectra    
|
Sun Jul 31 14:32:34 2016, Sarah, DEED1 Alpha calibration checks (205168)
|
Sun Jul 31 15:02:57 2016, Sarah, DEED6 Alpha calibration checks (205168)
|
Sun Jul 31 15:56:32 2016, Sarah, DEED16 Alpha calibration checks (205169)
|
Tue Aug 2 08:14:26 2016, Sarah, Leakage currents spreadsheet (26/07- 01/08)
|
Wed Aug 3 09:48:31 2016, Sarah, EFED10 alpha calibration checks
|
Wed Aug 3 14:48:09 2016, Sarah, Leakage currents 02.08 - 03.08
|
Mon Aug 8 11:02:13 2016, Sarah, Leakage currents 08.08.16
|
Tue Aug 9 15:57:52 2016, Sarah, Leakage currents 09.08.16
|
Thu Aug 11 08:19:37 2016, Sarah, Leakage currents 10.8.16
|
Wed Aug 17 15:10:05 2016, Sarah, Leakage currents 12.08.16
|
Fri Sep 2 12:01:57 2016, Sarah, Leakage currents 02.09.16
|
|