Entry  Wed Aug 6 11:20:52 2025, Selin, Pulser Test front_2V.pngfront_less2V.pngfront_less1V.pngback_2V.png
The pulser test was performed with a frequency of 500 Hz and with voltage settings of: 2V, 1.6V, 1.2V, 0.8V, 0.6V, 0.4V, 0.3V, 0.2V, 0.1V, 0.05V, 0.025V.

The run was started with calibration settings and then the voltage was changed every 2.5-3 minutes.

From the attached plots, it can be seen that everything is as expected. This means that the pulser multipolarity is consistent with front and
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
 20 micron (see 2015-10-05_12.46.59.jpg
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg 
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
Fairly self explanatory, note that images with time-stamps before 13.08.29 were taken before fitting the o-ring on the flange and therefore lateral positions
will be different to photos after 13.08.29. Individual detector heights were not changed.
Entry  Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings 
 Note that detailed DAQ information available from project-ntof.cern.ch erunbook ear2.
As a rough guide: 
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
 Leakage tues am
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
 Pulser out of 5,6,7 EFED- extended to 32ms
Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Alpha source in - containing 148Gd, 241Am, 239Pu, 244Cm    (4x 1kBq)
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Removed source and removed Li sample for blank frame test

Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
 Leakage before take down:
Entry  Wed Jul 27 13:20:53 2016, Sarah, Gafchromic images 6x
 
Entry  Thu Jul 28 16:00:43 2016, Sarah, List of to-dos 
Process alpha data
- Compare pulser width and alpha width to calibration spectra (shaping amp with 1us and gain 50x)
- Does photodiode data process OK or is it a problem with the oscillations?
Entry  Sun Jul 31 13:43:56 2016, Sarah, Alpha spectra DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe
 Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
Entry  Sun Jul 31 14:32:34 2016, Sarah, DEED1 Alpha calibration checks (205168) 
 DEED1: (rebin x2 -> 1 bin = 4 ch)
Pulser (DAQ):
- Centroid = 5000(1) ch
Entry  Sun Jul 31 15:02:57 2016, Sarah, DEED6 Alpha calibration checks (205168) 
 DEED6: (1 bin = 2 ch)
Pulser (DAQ):
- Centroid = 5145.6(6) ch
Entry  Sun Jul 31 15:56:32 2016, Sarah, DEED16 Alpha calibration checks (205169) 
***note that DEED 16 was on old sampling rate for 205168- so use next run, also DEED 9-12 not plugged in***

Entry  Tue Aug 2 08:14:26 2016, Sarah, Leakage currents spreadsheet (26/07- 01/08) Leakage_currents.xlsx
 Steady for dE, E. Possibly rising on PHDI- monitor closely.
Entry  Wed Aug 3 09:48:31 2016, Sarah, EFED10 alpha calibration checks 
 

    
        

           
Entry  Wed Aug 3 14:48:09 2016, Sarah, Leakage currents 02.08 - 03.08 
 02.08:
dE = 0.03 uA
E = 0.03 uA
Entry  Mon Aug 8 11:02:13 2016, Sarah, Leakage currents 08.08.16 
 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA