AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 2 of 5  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Authordown Subject Text Attachments
  4   Mon Oct 12 12:07:24 2015 Sarah Lonsdale05/10/15 Changes to DAQ settings Note that detailed DAQ information
available from project-ntof.cern.ch erunbook
ear2.
  
  6   Fri Oct 16 15:36:13 2015 Sarah Lonsdale06/10/15 Leakage, dE signal problem solving and external pulser trigger   6x 
  7   Fri Oct 16 15:41:14 2015 Sarah Lonsdale06/10/15 Changes to DAQ and pulser settings   2015-10-06_delay.jpg2015-10-06_trig.jpg 
  8   Fri Oct 16 15:56:01 2015 Sarah Lonsdale07/10/15 Alpha source in, change to pulser delay   6x 
  9   Fri Oct 16 16:01:41 2015 Sarah Lonsdale08/10/15 Removed source and sample, leakage current checkRemoved source and removed Li sample for
blank frame test
  
  10   Fri Oct 16 16:11:41 2015 Sarah Lonsdale09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current   2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg 
  11   Wed Jul 27 13:20:53 2016 SarahGafchromic images   6x 
  12   Thu Jul 28 16:00:43 2016 SarahList of to-dosProcess alpha data
- Compare pulser width and alpha width
to calibration spectra (shaping amp with
  
  13   Sun Jul 31 13:43:56 2016 SarahAlpha spectra Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
 DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe 
  14   Sun Jul 31 14:32:34 2016 SarahDEED1 Alpha calibration checks (205168) DEED1: (rebin x2 -> 1 bin = 4
ch)
Pulser (DAQ):
  
  15   Sun Jul 31 15:02:57 2016 SarahDEED6 Alpha calibration checks (205168) DEED6: (1 bin = 2 ch)
  
  16   Sun Jul 31 15:56:32 2016 SarahDEED16 Alpha calibration checks (205169)***note that DEED 16 was on old sampling
rate for 205168- so use next run, also DEED
9-12 not plugged in***
  
  17   Tue Aug 2 08:14:26 2016 SarahLeakage currents spreadsheet (26/07- 01/08) Steady for dE, E. Possibly rising
on PHDI- monitor closely.
 Leakage_currents.xlsx 
  18   Wed Aug 3 09:48:31 2016 SarahEFED10 alpha calibration checks 
  
  19   Wed Aug 3 14:48:09 2016 SarahLeakage currents 02.08 - 03.08 02.08:
dE = 0.03 uA
E = 0.03 uA
  
  20   Mon Aug 8 11:02:13 2016 SarahLeakage currents 08.08.16 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA
  
  21   Tue Aug 9 15:57:52 2016 SarahLeakage currents 09.08.16 Morning - 9am
E= 0.03uA
dE= 0.04uA
  
  22   Thu Aug 11 08:19:37 2016 SarahLeakage currents 10.8.16 At lunchtime (12.45)
E = 0.03 uA
dE  = 0.04 uA
  
  23   Wed Aug 17 15:10:05 2016 SarahLeakage currents 12.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA
  
  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16E 0.03
dE 0.05
PHDI 0.12
  
ELOG V3.1.4-unknown