AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 39 of 46  ELOG logo
ID Date Authorup Subject Text Attachments
  938   Mon Dec 11 11:05:27 2023 TDWR timestamp fail aida05 & aida07
MACB config 
1x level 0
 11x 
  939   Mon Dec 11 23:56:36 2023 TDTuesday 12 December00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
      and aida05 ( p+n FEE64 )
 18x 
  943   Thu Mar 28 11:10:09 2024 TDTest of 4x FEE64s at AIDA test station, T9, STFC DLTest of 4x FEE64s at AIDA test station, T9,
STFC DL
 22x 
  944   Thu Mar 28 15:43:47 2024 TDUnable to start MIDAS DAQ with 1x FEE64 ( aida04 )
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 )
 Screenshot_from_2024-03-28_15-43-28.pngScreenshot_from_2024-03-28_15-43-08.pngScreenshot_from_2024-03-28_15-47-49.png 
  946   Wed Apr 10 16:45:59 2024 TDAIDA interlock
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
 cynergy3-fsvplc-v3.pdf 
  104   Sat May 9 03:50:56 2015 TD & CGSaturday 9 May 2015
Gzip'd tar file of /MIDAS/DB - attachment
1
 MIDAS_DB_090515.tar.gzaida_may2015-0001.compressed.rotated.pdf 
  360   Wed Sep 28 06:40:40 2016 TD & CGWednesday 28 September14.40 AIDA power up

      Julabo FL11006 set point +20 deg C
 1.png2.png3.png4.png 
  361   Wed Sep 28 07:51:45 2016 TD & CGNew spectrum display software installed
Spectrum display software updated
    maximum number of galleries increased
  
  362   Thu Sep 29 03:20:38 2016 TD & CGThursday 29 September 11.20 R1 stops

      DSSSD bias/leakage current OK - see
 15x 
  378   Fri Oct 7 02:29:19 2016 TD & CGFriday 7 October10.29 DAQ left running overnight
      Histograms only - no data transfer
to Merger & TapeServer
 22x 
  379   Fri Oct 7 02:43:47 2016 TD & CGAnalysis of Sept2016/R13_47Analysis of R13_47 - the data file that was
being written when DAQ stalled
yesterday evening - see https://elog.ph.ed.ac.uk/AIDA/371
 Unsaved_Document_1 
  383   Wed Oct 12 02:58:19 2016 TD & CGWednesday 12 October10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
 1.png2.png3.png4.png5.png 
  384   Thu Oct 13 06:07:43 2016 TD & CGThursday 13 October
11.40 Power cycle AIDA FEE64s
      Set TS_SYNC_PHASE 0
 1.png2.png3.png4.png5.png 
  385   Thu Oct 13 16:12:06 2016 TD & CGFriday 14 October
DAQ continues (R33)
 14x 
  293   Wed Jun 8 03:46:51 2016 TD & MLTapeServer compression disabled
CHnaged TapeServer configuration file to
disable data compression
  
  365   Sat Oct 1 01:57:56 2016 TD & PJCSLatest MACB firmware - 16 April 2015   macb_top_revB.jed 
  216   Tue May 10 16:03:50 2016 TD & VFEPLatest version of Rly16
Do not forget to backup the current versions
of the attached files before
 Rly16.jsRly16.tclRly16.tml 
  303   Fri Jun 10 14:02:17 2016 TD (courtesy VFEP)[How to] Avoid Power-Cycling/Rebooting FEE64s
If you obtain the 'unable to connect' from
one, or more, of the FEE64s try the
  
  267   Wed Jun 1 09:00:13 2016 TD - Reply PJCSWednesday 1 June 2016> 09.30 Detector biases and leakage currents
- ambient temp +24.9 deg C - attachments
1-2
  
  269   Wed Jun 1 13:58:48 2016 TD - Reply PJCSWednesday 1 June 2016
> Check the Local Controls for the setting
of the LMK3200 control rgister.
 500.png501.png503.png505.png 
ELOG V3.1.4-unknown