AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 25 of 44  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Nov 8 13:37:06 2016, TD, OH, DK, NP1412 R2 6x
10:36 Run 2 Start
      Degraders (5.4mm Al) in at start and all removed once started.
      Other settings same as R1.
Entry  Tue Nov 8 13:06:18 2016, DK, TD, CG, OH, NP1412 Run 1 14_JST_2016.png
AIDA run with Takechi experiment. 71~73 Ni beam setting

F5 carbon target is:    IN

F7 CH2 target is:        OUT
Entry  Tue Nov 8 00:52:59 2016, OH, TD, FEE Settings and Options files FEE_Settings.xlsx
Used a program to sort through the settings files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3... and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
By comparing the parameter values we got from this to the value we know they should be set to we found some discrepancies in FEEs 1 and 3-8 with values
being set
Entry  Tue Nov 8 00:12:56 2016, TD, Report - medium - TapeServer changes volume name following request for existing filename 9.png

When you request a filename that already exists and select OK to the prompt
suggesting a new filename, TapeServer adds an additional character to the 
Entry  Mon Nov 7 23:15:14 2016, TD, CG, OH, Tuesday 8 November 12x
08.15 DAQ found stalled

      Soft reset OK
Entry  Mon Nov 7 02:13:05 2016, CG, OH, TD, DK, Monday 7 November 10x
11.10 DAQ found stopped. No storage mode so can't tell when, but presumably at 06.30 during LN2 fill cycle.
      Unable to regain control of (see errors after merger restart in attachment 1) system so power cycling FEEs.
Entry  Sun Nov 6 05:16:22 2016, OH, Update 
Leakage current spreadsheet has now been uploaded to google docs for ease of access.

It can be accessed and edited from the following link: https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?usp=sharing
Entry  Sun Nov 6 01:34:15 2016, TD, OH, CG, Sun 6th November 18x
10:34 Detector Bias a leakage currents all ok. (Attachments 1 and 2)
      Temperatures all ok (Attachment 3)
      All system wide checks ok other than clock status see attachment 4
Entry  Sat Nov 5 09:40:02 2016, OH, Updated Leakage Current Spreadsheet AIDA_leakage_current.odsLeakage_Plot_Ex.PNGAIDA_leakage_current.csv
Attached is the updated leakage current spreadsheet (Attachment 1)  as pf 5/11/2016 it is up to date with the elog.

Also added is the recording of ambient temperature. This is recorded in degrees C and plotted relative to 21 degrees C to better show on the same plot
Entry  Sat Nov 5 01:55:15 2016, CG, TD, OH, Saturday 5th November 20x
10.55 DAQ found to have stopped at 06:47 during LN fill cycle.

10:57 Screen shots of system after stop
Entry  Fri Nov 4 08:10:46 2016, CG, Pb bricks upstream 
Stack of Pb bricks upstream of AIDA+BRIKEN to protect from incoming beam.
Entry  Fri Nov 4 04:35:03 2016, TD, CG, DK, Friday 4 November part 2 36x
13.35 Swapped HDMI cables from master MACB to MACB #3 & #7
      for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9
Entry  Thu Nov 3 17:42:37 2016, TD, CG, DK, Friday 4 November 32x

00.40-02.30 Discussion with PJCS
 
Entry  Thu Nov 3 02:29:45 2016, TD, [How To] Startup AIDA (October 2016) 29x
Assumes 3-phase ac power (to Julabo FL11006 recirculating chiller) and single-phase ac power
(to AIDA NIM bins, PSUs, network switches, USB-controlled ac mains relay and Raspberry Pi)
is connected and switched on.
Entry  Thu Nov 3 01:25:30 2016, TD, CG, Thursday 3 November 11x
10.20 DAQ found stalled

      DSSSD bias & leakage current OK - see attachments 1 & 2
Entry  Tue Nov 1 23:55:33 2016, TD, CG, Wednesday 2 November 12x
08.56 DAQ continues OK

      DSSSD bias & leakage current OK - see attachments 1 & 2
Entry  Tue Nov 1 02:24:05 2016, TD, Tuesday 1 November 8x
11.24 DAQ found stalled
      Most recent file R95_168 last accessed 06.31
Entry  Mon Oct 31 04:50:59 2016, TD, [How to] Monitor AIDA (October 2016) 

All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.
Entry  Mon Oct 31 04:02:11 2016, TD, [How To] Stop Runs (October 2016)  200.png201.png202.png203.png204.png

All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.
Entry  Mon Oct 31 02:26:32 2016, TD, [How To] Start Runs (October 2016) 12x
All AIDA operations are controlled from the Dell T410 Workstation aidas1 using web browsers.

AIDA has multiple, independent data acquisition servers connected by an Ethernet network.
ELOG V3.1.4-unknown