|
ID |
Date |
Author |
Subject |
Text |
|
|
446
|
Wed Nov 9 09:50:50 2016 |
TD | NP1412 R20, R21 |
DAQ start (R20) failed - nnaida5 dropped
data transfer #1 link
|
|
|
445
|
Wed Nov 9 08:47:03 2016 |
OH, TD | NP1412 R16, R17 and R18 | start 17:44
stop 17:49
AIDA filename R16
|
|
|
444
|
Wed Nov 9 07:16:59 2016 |
OH, TD | NP1412 R15 | Run 15
start 16:14
|
6x |
|
443
|
Wed Nov 9 02:14:08 2016 |
OH, TD | NP1412 R14 | 11.13 Still waiting to get beam back got access
so took temp measurement.
T=25.6 DP=0.0 H=18.1
|
|
|
442
|
Wed Nov 9 00:49:03 2016 |
TD, OH | NP1412 R13 | 09.50 Run 13 Start
Thick C target (6mm) removed from F11.
All variable Al degraders put in place
|
|
|
441
|
Tue Nov 8 23:36:56 2016 |
DK, TD | NP1412 R12 | Takechi team changes the condition: F5
carbon; F7 empty; F11 carbon
F11 Plastic is 1.1kHz |
10x |
|
440
|
Tue Nov 8 23:16:15 2016 |
DK, TD | NP1412 R11 | Recovered AIDA after power cycle (unknown
cause of crash from the end of R10)
Corresponding run in BRIKEN: 161109_0814_747576Ni_012 |
|
|
439
|
Tue Nov 8 22:04:21 2016 |
DK | NP1412 R10 | Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)
Takechi team switches the condition: |
|
|
438
|
Tue Nov 8 21:01:40 2016 |
CG, DK | NP1412 R9 | 06.02 R9 started with Takechi group C target
out and all variable degraders in.
F5 C in. F7 empty. F11 empty.
|
|
|
437
|
Tue Nov 8 18:52:32 2016 |
CG, DK | NP1412 R7 R8 | 03.50 74-76Ni beam delivered to F11.
F11 plastic rate ~1kHz.
F5 C target in. F7 empty. F11 C target |
|
|
436
|
Tue Nov 8 15:10:16 2016 |
CG, TD, DK, OH | NP1412 R5 R6 | 00.15 Setting changed to 71,72,73Ni. All variable
degraders in.
Will remove while watching rates to |
|
|
435
|
Tue Nov 8 14:29:34 2016 |
TD, OH, DK | NP1412 Run 4 | 23:28 Run 4 Start
Thick 6mm C target in beam
|
|
|
434
|
Tue Nov 8 14:22:16 2016 |
TD, OH, DK | NP1412 R3 | 11:21 Run 3 Started
Degrader moved upstream. AIDA moved
to centre of BRIKEN. Fixed degrader moved |
|
|
433
|
Tue Nov 8 13:37:06 2016 |
TD, OH, DK | NP1412 R2 | 10:36 Run 2 Start
Degraders (5.4mm Al) in at start and
all removed once started.
|
6x |
|
432
|
Tue Nov 8 13:06:18 2016 |
DK, TD, CG, OH | NP1412 Run 1 | AIDA run with Takechi experiment. 71~73
Ni beam setting
F5 carbon target is: |
|
|
431
|
Tue Nov 8 00:52:59 2016 |
OH, TD | FEE Settings and Options files | Used a program to sort through the settings
files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3...
and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
|
|
|
430
|
Tue Nov 8 00:12:56 2016 |
TD | Report - medium - TapeServer changes volume name following request for existing filename |
When you request a filename that already
exists and select OK to the prompt
|
|
|
429
|
Mon Nov 7 23:15:14 2016 |
TD, CG, OH | Tuesday 8 November | 08.15 DAQ found stalled
Soft reset OK
|
12x |
|
428
|
Mon Nov 7 02:13:05 2016 |
CG, OH, TD, DK | Monday 7 November | 11.10 DAQ found stopped. No storage mode so
can't tell when, but presumably at 06.30
during LN2 fill cycle.
|
10x |
|
427
|
Sun Nov 6 05:16:22 2016 |
OH | Update | Leakage current spreadsheet has now been uploaded
to google docs for ease of access.
|
|
|