  656   Sun Jun 11 16:04:12 2017 DKMonday 12 June 0:00 ~ 8:000:04    Biases and leak currents shown as
attachment #1, 12JunBias1.png
        System-wide checks: nnaida13 fails
 10x 
  852   Tue Jun 18 08:03:20 2019 DKTuesday 18 June 16:00 - 24:00Shift change

16:00 
 15x 
  30   Tue Feb 10 16:01:50 2015 Chris Griffin, Alfredo EstradeHigh data rate - Pause/Resume06/02/15
 A look at the data rate at
which Pause/Resumes start to cause missing
 6x 
  14   Wed Oct 1 18:37:42 2014 Chris Griffin01/10/2014 Tests @ DLKept largely the same settings at the entry https://elog.ph.ed.ac.uk/AIDA/4
Same ASIC
settings
 11x 
  16   Sun Oct 5 22:42:56 2014 Chris GriffinDL tests on 02/10/14 A late entry for the work I carried
out on Thursday.
With the Emco box providing the HV,
 17x 
  886   Wed Aug 9 14:40:28 2023 Carole, Nic, JeroenAIDA HV SUPPLY & PULSER TESTTests with the HV supply (CAEN N1419ET)
and Pulse Generator ( BNC PB-5 ) in the detector
lab on the crate behind the DEGAS detectors,
 AIDA_PulserTest_0908_FullPulse.pngAIDA_PulserTest_09.08_5mV_10us_HVOFF.pngAIDA_PulserTest_0908_10mV_10us_50HV.pngHV_0V_090823_1500_wPulser.pngHV_-50V_090823_1500_wPulser.png 
  190   Fri Apr 29 11:11:20 2016 CG,PV,TDFriday 29 April
MSL type BB18 serial # 2977-20 bias +100V
I_L +12.0uA T=23 deg C
 6x 
  191   Sat Apr 30 07:46:47 2016 CG,PV,TDSaturday 30 April 2016MSL type BB18 serial # 2977-20 bias +100V
I_L +12.45uA T=23 deg C
(biased by nnaida # 3 & 5 )
 11x 
  193   Sun May 1 07:59:08 2016 CG,PV,TDAIDA Detector Configuration
UPSTREAM
  
  197   Mon May 2 12:13:25 2016 CG,PV,TDMonday 2 May 2016   22x 
  213   Thu May 5 11:10:36 2016 CG,PV,TDThursday 5 May 2016 Detector configuration - see https://elog.ph.ed.ac.uk/AIDA/193

Ribbon cable to nnaida19 FEE adaptor PCB
 8x 
  59   Mon Apr 20 09:07:59 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply

    

       
            
  
  60   Mon Apr 20 09:38:15 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply
  
  61   Mon Apr 20 09:45:38 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply ++

    

       
            
  
  120   Sat Nov 14 20:19:43 2015 CG, TD, PJCS13 Nov 2015 - new Kapton cable tests at DL

    

       
            
  
  126   Wed Nov 25 19:24:39 2015 CG, TD, PJCSNew Kapton cable tests at DLPowered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra
 6x 
  137   Wed Jan 6 16:06:32 2016 CG, TD, PJCSReport: Low - RPi power cable can't be fully inserted due to case conflict - solved


   
        
            
  
  423   Sat Nov 5 01:55:15 2016 CG, TD, OHSaturday 5th November10.55 DAQ found to have stopped at 06:47 during
LN fill cycle.
 20x 
  436   Tue Nov 8 15:10:16 2016 CG, TD, DK, OHNP1412 R5 R600.15 Setting changed to 71,72,73Ni. All variable
degraders in.
      Will remove while watching rates to
 bias1.pngbias2.png 
  291   Tue Jun 7 19:19:34 2016 CG, TD, DK, AEWednesday 8th June(4 mm Al mask was put upstream of AIDA
near 20:20 on 7 June)
 
 27x 