Fri Aug 19 12:41:43 2016, TD, VP, reply PJCS, Friday 19 August
|
> > >
> > > 14.00 Both AIDA NIM bins U/S
> > > Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
|
Fri Nov 17 15:53:03 2023, TD, JB, JG, Friday 17 November contd. 25x
|
AIDA ASIC settuings 2023Nov16-18.55.20
low comparator p+n FEE64s 0xa, n+n 0xf
|
Fri Nov 17 10:03:25 2017, CB, TD, Friday 17 November 32x
|
19.03 DAQ started OK - data transfer not enabled
BNC PB-4
|
Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
|
10.18 DAQ continues OK to file May19/R5_1
alpha background
|
Thu Nov 15 22:55:38 2018, CA, TD, OH, LS, Friday 16th November 08.00 - 16.00 42x
|
07.56 DAQ continues - AIDA file RIBF148/R5_822
165Pm BigRIPS setting + 2.8mm Al degrader
|
Thu Nov 15 15:05:33 2018, LS, Friday 16 November 00.00 to 08.00 9x
|
00.25 System wide checks ok * except nnaida 7 fails adc*
FEE Temps ok - attachment 1
|
Fri Jun 16 02:38:36 2017, TD, Friday 16 June 28x
|
10.35 DAQ continues
AIDA file RIBF148/R10_14
|
Fri Jun 14 10:33:44 2019, OH, CA, TD, CG, CB, DK, Friday 14th June 22x
|
Friday 14th June
Authors: TD, DK, CB
|
Thu Oct 13 16:12:06 2016, TD & CG, Friday 14 October 14x
|
DAQ continues (R33)
|
Fri May 12 02:55:10 2017, TD, OH, Friday 12 May 6x
|
10.55 DAQ continues OK
Current file May2017/R6_181
|
Fri Nov 11 00:50:00 2016, TD, Friday 11 November 11x
|
10.00 DAQ continues (R33) in no storage mode
DSSSD bias & leakage currents OK - see attachments 1 & 2
|
Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
|
11.00 - chiller refilled and switched on
set to 20 degrees celsius
|
Fri Jun 10 02:52:02 2016, TD, ML & YS, Friday 10 June 2016 16x
|
10.50 SyncCheck ... EURICA server refusing connection
[aida@d05 euricatssender]$ ./euricatssender -t
|
Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015
|
diode link threshold 0xca -> 0xb6
0x11 -> 0x2c
|
Fri Feb 20 10:04:29 2015, CG, AE, TD, Fri 20th progress 
|
20/02/15
1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)
1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram). |
Mon Aug 15 09:55:08 2016, Patrick Coleman-Smith, Found a candidate for DAQ failure.
|
The problem :-
The DAQ stops working and can only be fixed by a reboot of the FEE64s.
The Candidate:- |
Mon Aug 1 11:30:07 2016, Patrick Coleman-Smith, First time remotely power up HV in RIKEN from Daresbury
|
Logged into aidas1 and opened the nnrpi1 relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and opened a firefox to aidas1:8015.
By the time the firefox had appeared on my desktop the FEE64s had started up. |
Wed Feb 24 14:53:41 2016, PJCS, First data with two streams merged from one FEE64
|
nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge process.
Merged data is written to file ... attached.
The waveform is running at 100Hz and ASIC data is running at 10Hz. |
Wed Feb 24 16:13:24 2016, PJCS, First data with two streams merged from one FEE64
|
Quote:
nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge |
Thu Feb 25 12:47:43 2016, PJCS, First data with two streams merged from one FEE64
|
My GREAT data analyser program reports that the 'fail' bit is set ?
|