AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 38 of 46  ELOG logo
    Reply  Fri Aug 19 12:41:43 2016, TD, VP, reply PJCS, Friday 19 August 
> > > 
> > > 14.00 Both AIDA NIM bins U/S 
> > >       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
Entry  Fri Nov 17 15:53:03 2023, TD, JB, JG, Friday 17 November contd. 25x

AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
Entry  Fri Nov 17 10:03:25 2017, CB, TD, Friday 17 November 32x
19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
Entry  Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
10.18 DAQ continues OK to file May19/R5_1

      alpha background
Entry  Thu Nov 15 22:55:38 2018, CA, TD, OH, LS, Friday 16th November 08.00 - 16.00 42x
07.56 DAQ continues - AIDA file RIBF148/R5_822
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Thu Nov 15 15:05:33 2018, LS, Friday 16 November 00.00 to 08.00 9x

00.25 System wide checks ok * except nnaida 7 fails adc*
      FEE Temps ok - attachment 1
Entry  Fri Jun 16 02:38:36 2017, TD, Friday 16 June 28x
10.35 DAQ continues
      AIDA file RIBF148/R10_14
Entry  Fri Jun 14 10:33:44 2019, OH, CA, TD, CG, CB, DK, Friday 14th June 22x
Friday 14th June 

Authors: TD, DK, CB
Entry  Thu Oct 13 16:12:06 2016, TD & CG, Friday 14 October 14x

DAQ continues (R33)
Entry  Fri May 12 02:55:10 2017, TD, OH, Friday 12 May 6x
10.55 DAQ continues OK 
      Current file May2017/R6_181
Entry  Fri Nov 11 00:50:00 2016, TD, Friday 11 November 11x
10.00 DAQ continues (R33) in no storage mode

      DSSSD bias & leakage currents OK - see attachments 1 & 2
Entry  Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
11.00 - chiller refilled and switched on
        set to 20 degrees celsius
Entry  Fri Jun 10 02:52:02 2016, TD, ML & YS, Friday 10 June 2016 16x
10.50 SyncCheck ... EURICA server refusing connection

[aida@d05 euricatssender]$ ./euricatssender -t
Entry  Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015 
      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
Entry  Fri Feb 20 10:04:29 2015, CG, AE, TD, Fri 20th progress bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png2015-02-20_20.27.57.jpg
20/02/15
1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)
1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram).
Entry  Mon Aug 15 09:55:08 2016, Patrick Coleman-Smith, Found a candidate for DAQ failure. 
The problem :-
The DAQ stops working and can only be fixed by a reboot of the FEE64s.
The Candidate:-
Entry  Mon Aug 1 11:30:07 2016, Patrick Coleman-Smith, First time remotely power up HV in RIKEN from Daresbury 
Logged into aidas1 and opened the nnrpi1 relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and opened a firefox to aidas1:8015.
By the time the firefox had appeared on my desktop the FEE64s had started up.
Entry  Wed Feb 24 14:53:41 2016, PJCS, First data with two streams merged from one FEE64 R1_0.gz
nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge process.
Merged data is written to file ... attached.
The waveform is running at 100Hz and ASIC data is running at 10Hz.
    Reply  Wed Feb 24 16:13:24 2016, PJCS, First data with two streams merged from one FEE64 


    
        
            Quote:
        
        
            

           nnaida2 running Version 8 Firmware and data acquisition software outputting both and ASIC data stream and a Waveform data stream to the Merge
    Reply  Thu Feb 25 12:47:43 2016, PJCS, First data with two streams merged from one FEE64 analyser.f

My GREAT data analyser program reports that the 'fail' bit is set ?
ELOG V3.1.3-7933898