Entry  Sun Apr 26 02:28:59 2015, JA, LHB, TD, AE & CG, Sunday 26 April 2015 33x

Upstream, 207Bi source
Entry  Sat Apr 25 03:56:44 2015, JA, LHB, TD, AE & CG, Saturday 25 April 2015 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG

1130: Rotated forward water inlet connection to point towards rear of AIDA stand to remedy mechanical
      conflict with EURICA support frame - see attachments. During drain and re-fill of Julabo FL1106
Entry  Fri Apr 24 08:11:04 2015, CG, AE & TD, Thursday 23 April 2015 contd IMG_2850.JPG

Image of interior of closed EURICA array with AIDA inserted.
Entry  Thu Apr 23 10:27:59 2015, CG, AE, TD, Thursday 23rd April progress IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG
23/04/15
1800: Spent majority of the day moving AIDA forward and into EURICA.
          So far everything seems to fit very well, we have just noticed a few points of possible
Entry  Wed Apr 22 03:33:01 2015, TD, FEE64 Fast Discriminator OR o/p via MACB tek00000.tiftek00001.tif
Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
MACB front panel Trigger outputs.
    Reply  Thu Apr 23 09:02:57 2015, TD, Patrick, FEE64 Fast Discriminator OR o/p via MACB 
> Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
> MACB front panel Trigger outputs.
Entry  Thu Apr 23 03:21:48 2015, TD, MSL type BB18(DS)-1000 
MSL type BB18

Serial Thickness Depletion Date Note Location
Entry  Wed Apr 22 08:50:59 2015, CG, AE, TD, Wednesday 22nd April progress 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png
22/04/15
1230: Solved problem (empty spectra despite changing modules) with nnaida5 noted in previous progress update.
          During Feb tests, nnaida5 was very noisy compared to other nnaida => switched it to medium
Entry  Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11 AIDA_procedure_document.docx
Attached are Paul Morrall's instructions on how to move new AIDA support table into place, for a setup with 
EURICA at F11 (March 2015).
Entry  Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] LISE_estimates_84Zn.docxLISE_estimates_94Se.docx
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]

Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
Entry  Tue Apr 21 06:01:50 2015, CG, TD, Tuesday 21 April 2015 8x
21/04/15
1325: Recabled the MACB distribution tree as per PC-S instruction yesterday.
          Now have nnaida5+6, 13+14 in MACB3 (nnaida5 in output 1) and nnaida3+4, 11+12 in MACB10
Entry  Mon Apr 20 06:53:24 2015, CG, TD, Progress 20th April + RPi procedure 7x
20/04/15
1200: Complete all points on first part of check list, except checking the PSU voltages.
          System now in powered and has all network/HDMI cables attached.
    Reply  Mon Apr 20 09:07:59 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply 


    
        
            Quote:
        
        
            

           20/04/15
       Reply  Mon Apr 20 09:38:15 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply 


    
        
            Quote:
        
        
            
            
            
          Reply  Mon Apr 20 09:45:38 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply ++  


    
        
            Quote:
        
        
            

           
            
Entry  Mon Apr 20 07:39:49 2015, CG, TD, Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console 

It would appear that you cannot reliably startup the Raspberry Pi (nnrpi1)
connected to both the USB ac mains switch *and* the USB-serial link to FEE64
Entry  Sat Apr 18 09:30:11 2015, CG, To do list 19/04/15 - 21/04/15 
To do (roughly in order):

     Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
    
        3x
3Tb HDD
        NIM floating HV supply
        2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9
Entry  Mon Mar 9 16:51:26 2015, TD, AIDA adaptor PCB configuration - RIKEN - Feb 2015 6x
 
Entry  Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains  7x

3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer
Entry  Mon Mar 9 13:59:32 2015, TD, New AIDA support frame for F11/F12 @ RIKEN IMG_2798.JPG
 
Entry  Mon Mar 9 09:02:03 2015, Patrick Coleman-Smith, Adding Filters to the AIDA PSU.  Assembly_of_the_AIDA_PSU_filter_and_installation_guide.pdf
 This guide is to help with the filter pcb assembly and installation into the AIDA power supply.
Entry  Thu Mar 5 12:11:44 2015, TD, To Do list - March 2015 
A draft 'to do' list in preparation for further AIDA tests at RIKEN from mid-April.

Please feel free to add your comments, suggestions, other items etc.
Entry  Wed Mar 4 17:38:06 2015, CG, Log book for Feb 2015 tests AIDA_Feb2015_labBook_comp.pdf
04/03/15
Please find attached a scan of the log book for the Feb 2015 AIDA tests at RIKEN. 
Entry  Wed Feb 25 09:59:28 2015, CG, AE, Weds 25th Feb progress 2015-02-25_14.25.40.jpg2015-02-25_14.38.43.jpg25Feb_Rly16error.png
25/02/15
1200: Swapped out old green power switch for new one from UoE (having previously tested them both yesterday and found them to work fine).
           With first switch connected and PuTTY session opened cannot get RPi to connect to