Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x
|
19.12 all system wide checks OK *except* nnaida7 fails ADC calibration
|
Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
|
10.18 DAQ continues OK to file May19/R5_1
alpha background
|
Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
|
10.41 DAQ continues OK file RIBF147/R2_352
100Sn setting, no degrader
|
Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates
|
PID plot produced from 2 hours of merged data - attachment 1
Z on y-axis, A/Q on x-axis
|
Mon May 20 02:16:58 2019, CA, TD, Monday 20 May 2019 16x
|
10:18 DAQ Continues ok
Alpha run continues - Currently on file R8_2
|
Thu Jun 20 07:35:46 2019, CA, TD, Bias & leakage current spreadsheet
|
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343 |
Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist
|
stop the daq
pause merger
|
Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
|
11.00 - chiller refilled and switched on
set to 20 degrees celsius
|
Sat May 11 02:50:14 2019, CA, OH, TD, Saturday 11th May 2019  
|
10:52 system wide checks ok, except naida07 fails ADC calibration
good event statistics, rates in naida19,20,23,24 high (attachment 1)
FEE temperatures ok (attachment 2)
|
Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
|
10.20 System wide checks ok (except naida07 ADC calibration failure)
FEE temperatures ok (attachment 1)
|
Wed May 15 02:17:23 2019, CA, OH, TD, Wednesday 15 May 20x
|
10.18 DAQ continues OK to file May19/R2
alpha background
|
Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
|
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration
FEE64 temperatures OK - see attachment 1
|
Sat Oct 27 01:22:43 2018, CA, OH, Saturday 27 October   
|
09:22 DAQ found crashed. Appears to have crashed at 20:23 last night whilst writing R3_0 to file.
Run Control is non responsive
Leakage currents okay - attachment 1
|
Sun Oct 28 01:33:34 2018, CA, OH, Sunday 28 October    
|
09:33 DAQ still running, file R4_11.
Bias/leakage ok (attachment 1)
|
Sun Nov 4 01:11:41 2018, CA, CB, TD, OH, PJW, Sunday 4 November 20x
|
10.03 DAQ continues OK - current file Oct18/R16_9
FEE64 LEC/MEC slow comparator threshold 0x64
beam background
|
Mon Nov 5 01:40:10 2018, CA, CB, TD, OH, PJW, Monday 5 November 16x
|
10.40 Lowered slow comparator threshold from 100 to 10
Good event statistics ok (attachment 1)
System wide checks ok, except for nnaida7 ADC calibration failure
|
Wed Nov 7 01:00:58 2018, CA, CB, TD, OH, PJW, Wednesday 7 November 13x
|
10.02 DAQ still running, on file Oct18/R27_9
Merger and TapeServer ok, no error warnings in terminals
|
Fri Nov 2 00:57:24 2018, CA, CB, TD, OH, Friday 2 November 14x
|
09.58 DAQ continues OK - current file Oct18/R15_6
alpha background run
|
Sat Nov 3 00:37:29 2018, CA, CB, TD, OH, Saturday 3 November 9x
|
09.37 DAQ continues OK - data transfer disabled
FEE64 LEC/MEC slow comparator threshold 0xa
|
Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
|
09.57 DAQ still running (R29_29)
System wide checks ok, except nnaida7 ADC calibration failure
|