AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 43 of 46  ELOG logo
Entry  Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x

19.12 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
10.18 DAQ continues OK to file May19/R5_1

      alpha background
Entry  Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
10.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader
Entry  Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates 2hrPID.pdf
PID plot produced from 2 hours of merged data - attachment 1

Z on y-axis, A/Q on x-axis
Entry  Mon May 20 02:16:58 2019, CA, TD, Monday 20 May 2019 16x
10:18 DAQ Continues ok
      Alpha run continues - Currently on file R8_2
Entry  Thu Jun 20 07:35:46 2019, CA, TD, Bias & leakage current spreadsheet AIDA_leakage_current(1).xlsx

https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
Entry  Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist 
stop the daq

pause merger
Entry  Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
11.00 - chiller refilled and switched on
        set to 20 degrees celsius
Entry  Sat May 11 02:50:14 2019, CA, OH, TD, Saturday 11th May 2019 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png
10:52 system wide checks ok, except naida07 fails ADC calibration
      good event statistics, rates in naida19,20,23,24 high (attachment 1)
      FEE temperatures ok (attachment 2)
Entry  Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
10.20 System wide checks ok (except naida07 ADC calibration failure)

      FEE temperatures ok (attachment 1)
Entry  Wed May 15 02:17:23 2019, CA, OH, TD, Wednesday 15 May 20x
10.18 DAQ continues OK to file May19/R2

      alpha background
Entry  Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 1
Entry  Sat Oct 27 01:22:43 2018, CA, OH, Saturday 27 October 181027_0927_bias.png181027_1004_temp.png181027_1410_temp.png181027_1409_bias.png
09:22 DAQ found crashed. Appears to have crashed at 20:23 last night whilst writing R3_0 to file.
      Run Control is non responsive
      Leakage currents okay - attachment 1
Entry  Sun Oct 28 01:33:34 2018, CA, OH, Sunday 28 October 181028_0933_bias.png181028_0937_temp.png181028_1023_1.8.W.png181028_1024_layout8.png181028_1734_bias.png

09:33 DAQ still running, file R4_11. 
      Bias/leakage ok (attachment 1)
Entry  Sun Nov 4 01:11:41 2018, CA, CB, TD, OH, PJW, Sunday 4 November 20x
10.03 DAQ continues OK - current file Oct18/R16_9
      FEE64 LEC/MEC slow comparator threshold 0x64
      beam background
Entry  Mon Nov 5 01:40:10 2018, CA, CB, TD, OH, PJW, Monday 5 November 16x
10.40 Lowered slow comparator threshold from 100 to 10
      Good event statistics ok (attachment 1)
      System wide checks ok, except for nnaida7 ADC calibration failure
Entry  Wed Nov 7 01:00:58 2018, CA, CB, TD, OH, PJW, Wednesday 7 November 13x
10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error warnings in terminals
Entry  Fri Nov 2 00:57:24 2018, CA, CB, TD, OH, Friday 2 November 14x
09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
Entry  Sat Nov 3 00:37:29 2018, CA, CB, TD, OH, Saturday 3 November 9x
09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold 0xa
Entry  Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7 ADC calibration failure
      
ELOG V3.1.3-7933898