Entry  Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x
19.12 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 9
      detector biases & leakage currents OK - see attachments 10 & 11
      good event statistics OK - see attachment 12
      all FEE64s <100k, 10x < 20k

      1.8.W spectra 20us FSR - see attachments 13 & 14
Entry  Fri May 17 02:15:56 2019, CA, TD, OH, Friday 17 May 15x
10.18 DAQ continues OK to file May19/R5_1

      alpha background

      ASIC settings 2018Oct03-13.26.58
      *except* slow comparator 0xa -> 0x64

      BNC PB-4 Pulser OFF

      all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 1 & 2

      FEE64 temperatures OK - see attachment 3
      good event statistics OK - see attachments 4

      Merger OK - see attachment 5
      TapeServer OK - see attachment 6

      1.8.W spectra 20us FSR - attachments 7 & 8
      1.8.W spectra 20ms FSR - attachments 9 & 10

      Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C - water topped up
      Temperature +24.8 deg C dew point +8.3 deg C RH 35.3%

10.42 DAQ stop May19/R5_2

      slow comparator 0x64 -> 0xa
      Check ASIC Control *all* ASICs & FEE64s

10:52 AIDA inserted ~4cm into DTAS
      60Co (~40kBq) + 137Cs (~8kBq) sources located approximately 4cm in front of the front face of the snout

10.54 DAQ start May19/R6

      good event statistics OK - see attachments 11
      *all* FEE64s <100k, 9x < 20k
      data rate 4.9Mb/s 0.64M data items/s

11.04 nnaida17 good events c. 350k returns to 13k following Check ASIC Control (nnaida1 OK - see
https://elog.ph.ed.ac.uk/AIDA/801 )
      AIDA disc statistics indicate that fast discriminators were source of higher rate - next time this 
      happens we should check HitRate to see whether this is a specific channel or channels and possibly 
      mask

11.17 DTAS DAQ issues correlation scaler reset 
      AIDA data file May19/R6_3

      use files *from* R6_4

11.39 DAQ stop file May19/R6_8

      nnrpi1 is offline - we suspect wrench or power tool placed too close to RPi when we moved AIDA
      into DTAS and we jostled one or other of the cables connected to nnrpi1

      nnrpi1 power cycled to reboot
      *all* FEE64s OK
      USB ac mains relay controls recovered OK
      CAEN N1419 contrs recovered OK

11.48 AIDA withdrawn from DTAS for installation of upstream (CH2)n shield and additional Pb wall

11.52 DAQ starts to file May19/R7

      alpha background resumes

      ASIC settings 2018Oct03-13.26.58
      *except* slow comparator 0xa -> 0x64

      BNC PB-4 Pulser OFF

18.06 DAQ continues ok, on file May19/R7_0

      all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachment 13

      FEE64 temperatures OK - see attachment 14
      good event statistics OK - see attachment 15

      Merger and TapeServer ok

      Temperature +25.0 deg C dew point +4.4 deg C RH 27.0%



  
Entry  Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
10.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader

      ASIC settings 2019Jun13-08.56.35
      DSSSD#1 slow comparator 0xa -> 0x1d
      DSSSD#3 slow comparator 0xa -> 0x8

      BNC PB-4 Pulser 
      Amplitude 90,000
      x5 attenuator IN
      Frequency 25Hz range, variable min. c. 2.5Hz
      t_r 100ns, tau_d 50us
      - polarity
      Delay MIN, tail pulse

      all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 1 & 2

      FEE64 temperatures OK - see attachment 3

      good event statistics - OK - see attachment 4
      11x <20k 21x < 50k 24x <100k
      Merger OK - see attachment 5
      TapeServer OK - see attachment 6

      p+n FEE64s 1.8.W spectra 20us FSR - attachment 7
      n+n FEE64s 1.8.W spectra 20us FSR - attachment 8
      1.8.L spectra - see attachments 9 & 10
      nnaida1 73 ch FWHM, nnaida3 78 ch FWHM

      FEE64 Rate spectra - attachment 11
      Note high rate issues observed for *some* strips in nnaida14 ASIC #3 & #4 fixed (temporarily) by Check
ASIC Control
      FEE64 Rate spectra - attachment 12

10.58 ADC data synchronised - attachment 13

      Online MIDASsort spectra - attachments 14-18

11.04 analysis of file RIBF147/R2_353 - attachment 19
      deadtime <<1% *all* FEE64s
      no timewarps

11.12 HitRate spectra - attachment 20
      disable nnaida14 *hot* channels 29, 30 & 35 

11.15 zero all histograms
      zero DAQ stats

12.31 DTAS and BigRIPS stop
      AIDA on file R2_368

      DTAS starts file 63
      BigRIPS run 2025
      AIDA file R2_368

13:08 R2_374
      The putty window for USB2 had frozen with a 1 in the voltage set as shown in attachment 1
      The window was no longer updating.
      When regaining the window the voltage limit was applied and the detector
      began to ramp down
      The set voltage was reset to 100V and bias was regained.
      Total time with less than 100V was around 30sec

14:28 DTAS and BigRIPS stop
      AIDA on run R2_386

      DTAS Starts file 66
      BigRIPS run 2026
      AIDA on file R2_387

14:32 Bias and leakage currents ok - attachment 21

15:07 Rate spectra showing no spikes in DSSD 3
      System wide checks

15:08 DTAS and BigRIPS stop
      AIDA onfile R2_393
      BigRIPS chaning slit positions

14:14 DTAS starts file: 
      AIDA on file R2_394
      BigRIPS file 2027 (In control by bigRIPS)

15.30 TAS and BigRIPS stop
      AIDA onfile R2_396
Entry  Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates 2hrPID.pdf
PID plot produced from 2 hours of merged data - attachment 1

Z on y-axis, A/Q on x-axis

numbers estimated by gating on each isotope and integrating

94Ag - 10584 events in 2hrs

97In - 42 events in 2 hrs

100Sn - 56 events in 2 hrs

94Pd - 383030 events in 2 hrs
Entry  Mon May 20 02:16:58 2019, CA, TD, Monday 20 May 2019 16x
10:18 DAQ Continues ok
      Alpha run continues - Currently on file R8_2

      System wide checks all ok

      Detector bias/leakage currents ok - attachment 1
     
      Temp +25.6 deg C, Humidity 34.5% AND D.P +8.8 deg C
      
      FEE Temperatures ok - attachment 2

      Good event statistics ok - attachment 3

      Merger & TapeServer ok - attachments 4 & 5


17.15 DAQ continues OK to file May19/R8_2

      alpha background

      ASIC settings 2019May19-17.54.03
      slow comparator 0x64

      BNC PB-4 Pulser OFF

      all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 6 & 7

      FEE64 temperatures OK - see attachment 8
      good event statistics OK - see attachments 9

      Merger OK - see attachment 10
      TapeServer OK - see attachment 11

      1.8.L spectra - see attachments 12 & 13
      p+n FEE64s 1.8.W spectra 20us FSR - attachment 14 
      n+n FEE64s 1.8.W spectra 20us FSR - attachment 15

17.25 analysis of May19/R8_2 - see attachment 16
      deadtime OK
      ADC data for FEE64s nnaida5 & nnaida6 hot channels (Stat spectrum channel # 104)
      Also observed at a much lower rate for nnaida1 & nnaida2

17.27 Check ASIC Control *all* ASICs & FEE64s

13.27 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 60% M-H markers - water topped up (1x jugful) to H level marker
      Temperature +25.4 deg C dew point +9.6 deg C RH 36.3%
Entry  Thu Jun 20 07:35:46 2019, CA, TD, Bias & leakage current spreadsheet AIDA_leakage_current(1).xlsx
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
Entry  Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist 
stop the daq

pause merger

stop TapeServer

housekeeping checks

bias off

individually turn power relays off

switch off 2x NIN bins, 1x fan tray

do not turn off clock!!

turn off aida circuits at power box (careful!)

turn chiller off - press and hold arrow button

front panel switch on chiller - off

wall 3 phase power - off

withdraw aida clear from DTAS - slowly!

return power tool, temperature probe and water container to corral

*if cables*

network cables - blue, disconnect at switch, reel up at stairwell

disconnect clock

aida plastic high voltage and signal

cables from root macb trigger and reset to DTAS

mains cables from mains box

then move aida!
Entry  Fri May 10 05:58:01 2019, CA, OH, TD, Friday 10 May 2019 12x
11.00 - chiller refilled and switched on
        set to 20 degrees celsius

        AIDA stand moved and secured in F11
        clock connected -> 50 MHz square wave at 5.0 V

        AIDA connected to power box
        network cables attached
        NIM modules switched on

        Raspberry Pis switched on
        Detector bias switched on for detectors 1-6
     
        
        
13.58 - AIDA power relay 1,2,5,6 sequenced on
       bias/leakage currents ok (attachment 1)
       DAQ setup
       System wide checks ok, except naida07 fails ADC calibration, and clock status check returns error in
nnaida06, 5.

       Above issue with clock no longer present

       FEE temperatures ok (attachment 2)
       good event statistics (attachment 3)

16.30 1.8.W spectra n+n strips
      FSR 20us, 200us, 2ms, 20ms attachments 4-7

      1.8.W spectra p+n strips
      FSR 20us, 200us, 2ms, 20ms attachments 8-11
       
      compare with https://elog.ph.ed.ac.uk/AIDA/746

      naida19, naida20, naida23 show low frequency noise structure, worse than in above elog entry

17.22 1.8.L spectra p+n strips

      peaks:

      aida01 72
      aida02 112
      aida03 80
      aida04 78
      aida05 74
      aida06 95
      aida07 78
      aida08 71
      aida09 82
      aida10 85
      aida11 93
      aida12 96
      aida13 101
      aida14 70
      aida15 87
      aida16 87
      aida17 69
      aida18 83
      aida19 127
      aida20 116
      aida21 84
      aida22 74
      aida23 108
      aida24 117
      

      
Entry  Sat May 11 02:50:14 2019, CA, OH, TD, Saturday 11th May 2019 190511_1053_stats.png190511_1053_temp.png190511_1054_bias.png
10:52 system wide checks ok, except naida07 fails ADC calibration
      good event statistics, rates in naida19,20,23,24 high (attachment 1)
      FEE temperatures ok (attachment 2)
      detector bias/leakage currents stable (attachment 3)
Entry  Tue May 14 02:19:20 2019, CA, OH, TD, Tuesday 14th May 2019 11x
10.20 System wide checks ok (except naida07 ADC calibration failure)

      FEE temperatures ok (attachment 1)

      good event statistics ok (attachment 2)

      detector bias and leakage currents ok (attachment 3)

      DAQ stopped

10.40 pulser switched off

      slow comparator threshold raised to 0x64
      
      DAQ, merger, TapeServer started - all ok (attachments 4 and 5)

      writing to file R1 in TapeData/May19 at 70 kb/s

      good event statistics (attachment 6)

16:11 Tapeserver and merger still ok
      DAQ still running
      System wide checks all ok *except nnaida7 fails ADC calibration*
      Bias and leakage currents ok - attachment 7
      FEE Temperatures ok - attachment 8
      Statistics still ok
      
      Spectrum are showing alpha events (Layout 4) - attachment 9

18:25 Tektronix clock accidentally unplugged. DAQ has stalled as a result.
      Clock reset to 50MHz 5V TTL signal

18:29 System wide check of clock status shows error message in attachment 10

      DAQ Reset
      With slow comp at oxa statistics are still good - attachment 11
      System wide checks all ok *except nnaida7 fails ADC calibration*
      Resync to the ASIC clock
      All histograms zeroed

18:37 Slow comp threshold raised to 0x64 for alpha run
      Writing to file:
      May19/R2_0
      

      

      

      

      
Entry  Wed May 15 02:17:23 2019, CA, OH, TD, Wednesday 15 May 20x
10.18 DAQ continues OK to file May19/R2

      alpha background

      ASIC settings 2018Oct03-13.26.58
      *except* slow comparator 0xa -> 0x64

      BNC PB-4 Pulser OFF

      all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 1 & 2

      FEE64 temperatures OK - see attachment 3
      good event statistics OK - see attachments 4

      Merger OK - see attachment 5
      TapeServer OK - see attachment 6

      1.8.L spectra - attachments 7 & 8
      1.8.W spectra 20us FSR - attachments 10 & 11
      1.8.W spectra 20ms FSR - attachments 10 & 11

      Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C - water topped up
      Temperature + deg 24.7C dew point +7.5 deg C RH 33.3%

      FEE64 nnaida1-4 temperature logs - see attachments 12-15
      all FEE64 temperatures appear to be stable 

11.05 check ASIC control *all* FEE64s and ASICs

11.13 analysis of file May19/R2_1 - see attachment 16
      ADC rate c. 72Hz dominated by same, single hot channel (Stat spectrum ch# 104) in each of FEE64s nnaida1,
2, 5 & 6 otherwise looks OK
      sync pulser rate 10Hz confirmed by JA

17.25 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 18
      good event statistics OK - see attachments 19

      detector biases & leakage currents OK - see attachment 20

      Temperature + deg 24.5C dew point +8.2 deg C RH 34.1%

      Merger and TapeServer ok
Entry  Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 1
      good event statistics OK - see attachments 2

      detector biases & leakage currents OK - see attachment 3

      Temperature + deg 24.7C dew point +8.6 deg C RH 35.0%

      Merger and TapeServer ok

10:30 DAQ, merger, TapeServer stop 

      Alpha run stopped at AIDA file TapeData/May19/R2_5

      slow comparator threshold lowered to 10 keV (0xa)

      DAQ start, not writing to file

      good event statistics after lowering threshold, ok (attachment 4)

10:49 1.8.W spectra 20ms FSR - attachments 5 & 6

11:25 started writing to file R3 (sync test)
      low threshold run at 5mb/s

11:33 DAQ stop (R3)

      slow comparator threshold raised to 100 kev (0x64)

      DAQ start, alpha run

      Writing to file TapeData/May19/R4

18.49 alpha background

      ASIC settings 2018Oct03-13.26.58
      *except* slow comparator 0xa -> 0x64

      BNC PB-4 Pulser OFF

      FEE64 temperatures OK - see attachment 7
      good event statistics - see attachments 8 - nnaida1 405k & nnaida17 368k, all other FEE64s c. 380Hz as
expected
      ASIC check for *all* ASICs & FEE64s restored all FEE64 rates to expected c. 380Hz - see attachment 13

      detector biases & leakage currents OK - see attachments 9 & 10

      Merger OK - no error messages - see attachment 11
      TapeServer OK - see attachment 12

      all system wide checks OK *except* nnaida7 fails ADC calibration *and* Check Sync errors not counted Since
Baseline - see attachment 14

      DAQ stopped May19/R4_3

aidas1> ls -l /TapeData/May19
total 19808048
-rw-rw-rw-. 1 npg npgstaff 1908736000 May 14 18:28 R1_0
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 15 02:30 R2_0
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 15 10:20 R2_1
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 15 18:08 R2_2
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 16 01:57 R2_3
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 16 09:45 R2_4
-rw-rw-rw-. 1 npg npgstaff  190447616 May 16 10:28 R2_5
-rw-rw-rw-. 1 npg npgstaff 1109327872 May 16 11:28 R3_0
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 16 18:39 R4_0
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 16 18:45 R4_1
-rw-rw-rw-. 1 npg npgstaff 2097152000 May 16 18:50 R4_2
-rw-rw-rw-. 1 npg npgstaff  225312768 May 16 18:54 R4_3
-rw-rw-rw-. 1 npg npgstaff   52494336 May 16 19:10 R5_0

      Wahtever the issue was it probably occurred before 18.39

      DAQ RESET
      DAQ SETUP
      ASIC check for *all* ASICs & FEE64s
      all system wide checks OK *except* nnaida7 fails ADC calibration
      Sync all ASIC clocks using Re-SYNC

      DAQ started May19/R5

19.23 1.8.W spectra - see attachments 15 & 16
Entry  Sat Oct 27 01:22:43 2018, CA, OH, Saturday 27 October 181027_0927_bias.png181027_1004_temp.png181027_1410_temp.png181027_1409_bias.png
09:22 DAQ found crashed. Appears to have crashed at 20:23 last night whilst writing R3_0 to file.
      Run Control is non responsive
      Leakage currents okay - attachment 1

      Unable to ping any of the nnaida FEEs
      Restarted merger in an attempt to clear links still no response.
      Have powered down FEE64
      
      Replaced blown fuse
      Checked temperatures of FEEs, all okay - attachment 2
      

10:19 Restarted alpha run, write to file Oct18/R4.
      System wide checks - all ok.
      Slow comparator threshold changed to 100 from 10

14:12 FEE temperatures ok (attachment 3)
      Bias/leakage currents ok (attachment 4)
      System wide checks ok
      Alpha run on R4_1

17.45 DAQ continues OK, file Oct18/R4_3
Entry  Sun Oct 28 01:33:34 2018, CA, OH, Sunday 28 October 181028_0933_bias.png181028_0937_temp.png181028_1023_1.8.W.png181028_1024_layout8.png181028_1734_bias.png
09:33 DAQ still running, file R4_11. 
      Bias/leakage ok (attachment 1)

      Leakage currents whilst still acceptable are up around 400nA on yesterday
      Have checked all detectors and rates and pulser peak widths are still good across the board
      Will keep an eye on but for now it appears to be ok
      BRIKEN is currently doing a Cf source test so could be a result of charging from the source

      Humidity: 33.1, Temperature: 24.6, Dew point: 7.1
      FEE temperatures ok (attachment 2)

09:38 System wide checks ok

10:25 Pulser peak widths all checked
      Widths comparable to 26th apart from 24 which is much wider from ~70 -> ~120
      Waveforms, layout 7 and 8 - attachments 3 and 4

10:37 Started new run on file R5 at time 10:37
      Threshold changed back to 100 from 10
      Pulser on at 2Hz

16:34 Stopped R5 alpha run
      Lowered thresholds to 0xa to produce higher rate data to test AIDA<->BRIKEN synchronisation
      Started file R6 to do this
      DAQ crashed on start ASIC readout with unable to connect to nnaida19 message appearing.
      Could not clear despite attempts at restarting the merge if that was the cause.

      FEE power cycle

17:03 DAQ recovered, R7 started
      AIDA did not crash
      BRIKEN started Ge fill cycle
      AIDA did not crash during or after

17:17 R7 Stopped sync program is being worked on by Jorge,

17:32 Thresholds raised back to 100 from 10
      Pulser switched off
      R8 started
      leakage current dropping down (attachment 5)
Entry  Sun Nov 4 01:11:41 2018, CA, CB, TD, OH, PJW, Sunday 4 November 20x
10.03 DAQ continues OK - current file Oct18/R16_9
      FEE64 LEC/MEC slow comparator threshold 0x64
      beam background

10.05 all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 1 & 2

      FEE64 temperatures OK - see attachment 3
      good event statistics OK *except* nnaida2 - see attachment 4
      nnaida2 rate due to one hot channel as before

      Merger OK - see attachment 5
      TapeServer OK - see attachment 6
      no errors or warnings shown by server terminal sessions 

  
      1.8.L spectra - see attachments 7 & 8

       N.B. evidence of minimally ionising particles (presumably protons) from beam to F11 E detector
            ~10-15cm Pb bricks were placed within BRIKEN (CH2)n stack to stop heavy particles

      1.8.W spectra 20us FSR - see attachments 9 & 10

      online analysis with MIDASsort

      attachment 11 - per DSSSD m_p versus m_n
                 12 - per DSSSD x versus y
                 13 - per DSSSD E_p versus E_n
                 14 - channel versus E_p
                 15 - hit pattern (ASIC & DSSSD order)

14.35 DAQ continues OK - current file Oct18/R16_11
      FEE64 LEC/MEC slow comparator threshold 0x64
      beam background

14.35 all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 15 & 16

      FEE64 temperatures OK - see attachment 17
      good event statistics OK *except* nnaida2 - see attachment 18
      nnaida2 rate due to one hot channel as before

14.51 analysis file Oct18/R16_10 - attachment 19
Entry  Mon Nov 5 01:40:10 2018, CA, CB, TD, OH, PJW, Monday 5 November 16x
10.40 Lowered slow comparator threshold from 100 to 10
      Good event statistics ok (attachment 1)
      System wide checks ok, except for nnaida7 ADC calibration failure
      FEE64 temperatures ok (attachment 2)
      Bias/Leakage currents ok (attachment 3)
      1.0.L spectra obtained, look ok (attachment 4)
      DAQ stopped (R16)
 
10.49 Slow comparator threshold raised from 10 to 100
      DAQ restarted (R17)
      Merger and TapeServer ok, no error messages in terminals
      Good event statistics ok (attachment 5)
      nnaida2 is now at a good rate, after fixing kapton connection.

15:09 DAQ still running (Oct18/R17_0)
      Merger and TapeServer ok
      System wide checks ok, except for nnaida7 ADC calibration failure
      FEE64 temperatures ok (attachment 6)
      Bias/Leakage currents ok (attachment 7)
      Good event statistics ok (attachment 8)


18.48 good event statistics OK *except* nnaida17 c. 400k
      ASIC Control -> Check ASIC Control
      *all* FEE64 good events statistics now OK
      DAQ stop - current file Oct18/R17_20

18.50 DAQ start - file Oct18/R18
      BNC PB-4 OFF
      LEC/MEC slow comparator 0x64

      alpha background run

18.54 all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 9 & 10
      FEE64 temperatures OK - see attachment 11
      good event statistics OK - see attachment 12
      Merger - Link16 errors reported - see attachment 13
      TapeServer OK - see attachment 14

      1.8.W spectra - attachment 15 & 16


      
Entry  Wed Nov 7 01:00:58 2018, CA, CB, TD, OH, PJW, Wednesday 7 November 13x
10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error warnings in terminals

10.07 Good event statistics ok, except nnaida6 rate being high (attachment 1)
      nnaida17 rate ok, but counts very high. May have run fast at some point overnight.
      System wide checks ok, except nnaida7 failure in ADC calibration
      FEE64 temperatures ok (attachment 2)

10.13 Bias/leakage currents slightly higher, but ok (attachment 3)

10:30 1.8.W spectra (attachment 4)

11.10 Stopped the DAQ (R27_9)
      Checked ASIC control - ok
      Started the DAQ again (Oct18/R28_0)
      good event statistics ok, aside from nnaida6 running slightly fast (attachment 5)

15.07 DAQ stop - file Oct18/R28_2

      Detector bias OFF 

      Move AIDA downstream to check position of Clover G7 

16.05 Move back upstream into BRIKEN (CH2)n moderator assembly

      Detector bias ON

16.12 all system wide checks OK *except* nnaida7 fails ADC calibration
      sync all ASIC clocks using ReSYNC
      detector biases & leakage currents OK - see attachments 6 & 7
      FEE64 temperatures OK - see attachment 8
      good event statistics OK *except* nnaida2 - see attachment 9
                                                  see attachment 10 for comparison to statistics 5.1.18

16.41 1.8.W spectra 20us FSR - see attachments 11 & 12

16.55 slow comparator thresholds raised from 10 to 100
      DAQ start (Oct18/R29_0)
      Merger and TapeServer ok - no error warnings in terminals
      good event statistics ok, except nnaida6 running fast (attachment 13)




      
Entry  Fri Nov 2 00:57:24 2018, CA, CB, TD, OH, Friday 2 November 14x
09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run

09.20 all system wide checks OK *except*
        nnaida7 fails ADC calibration
        SYNC errors since baseline - see attachment 1 - baseline not zero'd following reboot of nnaida2 and
setup of all FEE64s yesterday
        SYNC errors OK following new baseline check

      detector biases & leakage currents OK - see attachments 2 & 3

      FEE64 temperatures OK - see attachment 4
      good event statistics OK - see attachment 5
      nnaida2 rate due to one hot channel

      Merger OK - see attachment 6
      TapeServer OK - see attachment 7
      no errors or warnings shown by server terminal sessions 

      1.8.L spectra - see attachments 8 & 9

       N.B. evidence of minimally ionising particles (presumably protons) from beam to F11 E detector
            ~10-15cm Pb bricks were placed within BRIKEN (CH2)n stack to stop heavy particles

      1.8.W spectra - see attachments 10 & 11 - trace updates for 9/12 p+n FEE64s have stopped, n+n FEE64s OK

15.54 DAQ continues - current file Oct18/R15_15
      nnaida17 good event rate c. 400kHz


15.57 FEE64 reset, setup, system wide checks
      all ASIC clocks sync'd using ReSYNC
      all spectra zero'd
      ASIC check load
      
      DAQ go - data transfer disabled

      good events statistics - attachment 12

      1.8.W spectra - see attachments 13 & 14
      changed LED threshold 7700 -> 8500 for 9/12 p+n FEE64s
Entry  Sat Nov 3 00:37:29 2018, CA, CB, TD, OH, Saturday 3 November 9x
09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold 0xa

09.39 all system wide checks OK *except* nnaida7 fails ADC calibration

      detector biases & leakage currents OK - see attachments 1 & 2

      FEE64 temperatures OK - see attachment 3
      good event statistics OK *except* nnaida17 c. 400k - see attachment 4
      nnaida2 rate due to one hot channel as before
  
      1.8.L spectra - see attachments 5 & 6

       N.B. evidence of minimally ionising particles (presumably protons) from beam to F11 E detector
            ~10-15cm Pb bricks were placed within BRIKEN (CH2)n stack to stop heavy particles

      1.8.W spectra 20us FSR - see attachments 7 & 8


10.10 LEC/MEC slow comparator from 0xa to 0x64
      3x ASIC check load
      DAQ stop
      all histograms zero'd
      enable data transfer
      DAQ start - file Oct18/R16

      beam background

      good event statistics OK *except* nnaida2 20kHz - see attachment 9
Entry  Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7 ADC calibration failure
      
09.59 FEE64 temperatures ok (attachment 1)
      TapeServer ok
      Link16 error reported in Merger (attachment 2)

10.04 Bias/Leakage currents ok (attachment 3)

10.07 Good event statistics ok, except nnaida17, 18, 22 which appears to intermittently run fast overnight, and
      nnaida2 which runs fast due to hot channel (attachment 4)

10.11 1.8.W spectrum (attachment 5)

10.56 2.15.H spectra - show hot high energy channel in nnaida2 (attachment 6)

11.09 attachments 7,8,9 - High energy channels spectra, show hot channel in nnaida17 

11.45 Stats - Attachment 10 


15.07 analysis RIBF/R1_1 - see attachment 11
      <1% deadtime for high rate FEE64s nnaida19 & nnaida20

15.14 AIDA shield (c. 3" Pb) in position between F11 and upstream BRIKEN (CH2)n shield - checked by TD & GK
      Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C, water added to 80% level (L-H) or 2/3 (M-H) 

16:41 DAQ stopped
      slow comparator threshold at 10
      DAQ restarted (\RIBF148\R2)
      DAQ stopped (\RIBF148\R2_3)
      slow comparator threshold raised back to 100
      DAQ start (\RIBF148\R3_0)
17.10 DAQ stop (\RIBF148\R3_0)
      slow comparator threshold lowered back to 10
      DAQ start (not writing to file)
      good event statistics ok (attachment 12)

17.15 system wide checks ok
      FEE64 temperatures ok (attachment 13)
      bias/leakage currents ok (attachment 14)

18:35 R4_0 started for background measurement for Phong.
      R4_0 should be discarded as FEE1 was running fast at start. recovered with ASIC check

18:51 R1_2 stopped