AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 44 of 46  ELOG logo
Entry  Sat Nov 10 03:50:00 2018, CA, CB, TD, OH, Saturday 10 November 9x

12.35 DAQ continues OK - data transfer disabled
Entry  Sat Nov 10 21:53:29 2018, CA, CB, TD, OH, Sunday 11 November 21x
06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon Jun 17 08:03:37 2019, CA, CB, TD, OH, Mon Jun 17 16:00-24:00 19x
16:04  DAQ continues running OK
       All system-wide checks OK except nnaida7 ADC calibration fails
       FEE64 temperatures OK - attach 1
Entry  Sat Jun 15 01:05:41 2019, CA, CB, TD, CG, OH, DK, ML, Saturday 15 June 47x
09.05 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +24.1 deg C dew point +8.3 deg C RH 36.2%
Entry  Mon Jun 10 01:43:16 2019, CA, CB, TD, CG, OH, DK, Monday 10 June 19x
09:45 DAQ continues ok 

      all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon Jun 10 07:39:35 2019, CA, CB, TD, CG, OH, DK, Varying per DSSSD slow comparator thresholds 32x

DSSSDs #1-6 slow comparator 0xa = 100keV - attachments 1-4
Entry  Tue Jun 11 01:45:55 2019, CA, CB, TD, CG, OH, DK, Tuesday 11 June 17x
09:46 DAQ continues ok

      all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Thu Jun 13 00:30:17 2019, CA, CB, TD, CG, OH, DK, Thursday 13 June 18x
08.32 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers + 0.5 jugful -> c. 80% M-H markers
      Temperature +24.0 deg C dew point +9.6 deg C RH 39.0%
Entry  Thu Jun 20 02:37:55 2019, CA, CB, TD, CG, DK, Thursday 20 June 23x
10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
Entry  Sun Jun 16 04:09:40 2019, CA, CB, ML, TD, CG, Sunday 16 June noon-midnight 16x
12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
Entry  Fri Jun 21 01:08:35 2019, CA, CB, Friday 21 June 21junSync.png20june_2319_temps.png21jun_bias.png
09.08 all system wide checks okay *except* naida7 fails adc calibration
      mismatch between sync pulses received from master and FEE64 - attachment 1
Entry  Wed Nov 14 14:46:47 2018, CA, Thursday 15th November 00:00 - 08:00 25x
23.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7 ADC calibration failure
Entry  Fri Nov 16 06:01:47 2018, CA, High Energy Channel Ex vs Ey for different degrader thicknesses 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png
15.04 Plots of X Energy vs Y Energy for each detector, and for 4 different Al degrader thicknesses, as indicated
on each graph. (Attachments 1-4)
Entry  Sun May 19 02:21:43 2019, CA, Tests of low energy calibration on Alpha Data 25x
10.23 Low energy calibration program now produces relative gain coefficients in a format that can be used with AIDASort

      using sorted alpha data Oct18/R29*
Entry  Thu Jun 13 05:49:37 2019, CA, Further tests of calibration on Alpha data 27x
Alpha data used: /May19/{R1,R2,R7,R8,R9,R11} (c. 380 hr.)

Absolute calibration calculated with relative calibrated data
Entry  Sun Jun 16 04:50:03 2019, CA, Tests of calibration on beta data 25x
Analysis of RIBF148/R5_170_190, with 500 < E < 1000 keV energy cut

Note also a 600 keV energy difference cut was applied when sorting the data.
Entry  Tue Jun 18 16:14:03 2019, CA, Wednesday 19 June 00.00 - 08.00 shift 32x
00.00 Shift Change

      DAQ continues ok 
Entry  Thu Jan 22 13:50:33 2015, Alfredo and Tom, Further measurements with filtered PSU 
Jan 20, 2015

Test settings: DSSD biased at 100V, with 3.5 uA leakage current. Pulser at 0.5 V, split and inverted for both
Entry  Thu Jan 22 14:26:10 2015, Alfredo and Tom, [DATA] R49: alpha background radioactivity ASIC_settings_Jan20_2015.pngR49few_a_bckgrnd_multiplicity.pngR49few_a_bckgrnd_xy.pngR49few_a_bckgrnd_dt_event.pngR49few_a_bckgrnd_EfEb.png
Jan20-21, 2015

Entry  Fri Oct 24 16:02:26 2014, Alfredo Estrade, bench tests with pulser nnaida13_1.2.L_pulser_noDSSD.pngpulser_nnaida13_sample.pngnoise_nnaida11_DSSD_sample2.pngnoise_nnaida12_DSSD_sample.png
Performed pulser measurements with test setup at Daresbury lab, with main purpose of remembering how to operate the system! The status is similar to
what Chris observed in Elog entry #14. Confirmed ASIC settings as in entry#4 of elog.
 
The pulser spectra shows FWHM of ~ 13.5 ch for all FEE64 cards with no DSSD connected to the system (i.e. Kapton cables unplugged).
ELOG V3.1.3-7933898