| ID |
Date |
Author |
Subject |
Text |
 |
|
772
|
Sat Nov 10 03:50:00 2018 |
CA, CB, TD, OH | Saturday 10 November |
12.35 DAQ continues OK - data transfer disabled
|
9x | |
774
|
Sat Nov 10 21:53:29 2018 |
CA, CB, TD, OH | Sunday 11 November | 06.53 DAQ continues OK - data transfer disabled
06.55 all system wide checks OK *except* |
21x | |
850
|
Mon Jun 17 08:03:37 2019 |
CA, CB, TD, OH | Mon Jun 17 16:00-24:00 | 16:04 DAQ continues running OK
All system-wide checks OK except nnaida7
ADC calibration fails
|
19x | |
842
|
Sat Jun 15 01:05:41 2019 |
CA, CB, TD, CG, OH, DK, ML | Saturday 15 June | 09.05 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
47x | |
835
|
Mon Jun 10 01:43:16 2019 |
CA, CB, TD, CG, OH, DK | Monday 10 June | 09:45 DAQ continues ok
all system wide checks OK *except* |
19x | |
836
|
Mon Jun 10 07:39:35 2019 |
CA, CB, TD, CG, OH, DK | Varying per DSSSD slow comparator thresholds |
DSSSDs #1-6 slow comparator 0xa = 100keV
- attachments 1-4
|
32x | |
837
|
Tue Jun 11 01:45:55 2019 |
CA, CB, TD, CG, OH, DK | Tuesday 11 June | 09:46 DAQ continues ok
all system wide checks OK *except* |
17x | |
839
|
Thu Jun 13 00:30:17 2019 |
CA, CB, TD, CG, OH, DK | Thursday 13 June | 08.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers + 0.5 |
18x | |
856
|
Thu Jun 20 02:37:55 2019 |
CA, CB, TD, CG, DK | Thursday 20 June | 10.37 Post - beam, AIDA & DTAS run only
DTAS stop run 164
AIDA file R2_1012
|
23x | |
844
|
Sun Jun 16 04:09:40 2019 |
CA, CB, ML, TD, CG | Sunday 16 June noon-midnight | 12.10 DAQ continues OK file RIBF147/R2_145
100Sn setting, no degrader
|
16x | |
859
|
Fri Jun 21 01:08:35 2019 |
CA, CB | Friday 21 June | 09.08 all system wide checks okay *except*
naida7 fails adc calibration
mismatch between sync pulses received |
  | |
784
|
Wed Nov 14 14:46:47 2018 |
CA | Thursday 15th November 00:00 - 08:00 | 23.58 DAQ continues ok (RIBF148/R5_505)
00.09 system wide checks ok, except nnaida7 |
25x | |
790
|
Fri Nov 16 06:01:47 2018 |
CA | High Energy Channel Ex vs Ey for different degrader thicknesses | 15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
|
   | |
805
|
Sun May 19 02:21:43 2019 |
CA | Tests of low energy calibration on Alpha Data | 10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
|
25x | |
840
|
Thu Jun 13 05:49:37 2019 |
CA | Further tests of calibration on Alpha data | Alpha data used: /May19/{R1,R2,R7,R8,R9,R11}
(c. 380 hr.)
|
27x | |
845
|
Sun Jun 16 04:50:03 2019 |
CA | Tests of calibration on beta data | Analysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
|
25x | |
853
|
Tue Jun 18 16:14:03 2019 |
CA | Wednesday 19 June 00.00 - 08.00 shift | 00.00 Shift Change
DAQ continues ok
|
32x | |
22
|
Thu Jan 22 13:50:33 2015 |
Alfredo and Tom | Further measurements with filtered PSU | Jan 20, 2015
Test settings: DSSD biased at 100V, with |
| |
23
|
Thu Jan 22 14:26:10 2015 |
Alfredo and Tom | [DATA] R49: alpha background radioactivity | Jan20-21, 2015
|
    | |
18
|
Fri Oct 24 16:02:26 2014 |
Alfredo Estrade | bench tests with pulser | Performed pulser measurements with test
setup at Daresbury lab, with main purpose
of remembering how to operate the system! |
   |
|