ID |
Date |
Author |
Subject |
867
|
Wed Apr 12 12:32:13 2023 |
PJCS | ASIC power short problem | I have taken videos with an Infrared camera of the power being supplied to one isolated ASIC on a mezzanine.
The power supply is a bench supply with current limit set to 3A.
The centre of the ASIC glowed white hot for a short time and then the whole ASIC shows as hot. Ths the short is on the ASIC and not the bond wires IMO.
I am unable to globally publish the videos at present as I only have a private google drive account.
Please contact Tom Davinson for further details. |
865
|
Wed Mar 1 16:42:06 2023 |
Further results from Mezzanine bench tests | PJCS | Carried out some further work on failed mezzanine modules.
Inspected them externally and removed the copper block, internally with a bench microscope.
Found two obvious faults ..... broken components with scrambled pcb tracks.
To help determine problems with loading control registers I've added a new menu item in the ASIC control window to allow all four ASIC return values to be checked. This is only useful at the mezzanine test system.
Tested 7 that were labelled as faulty. Failed all of them. 2 with broken components and 1 with some broken bond wires.
Tested one fresh from the cupboard. It failed with over current on the +5v psu ( > 4A! ).
I propose to create a method of testing these mezzanines which allows better access to the power supply regulators ( LT3080 ) and the associated control voltage.
|
864
|
Thu Feb 23 16:15:31 2023 |
TD PJCS | Bench test of AIDA FEE64 mezzanines |
Attachments 2 & 7 AIDA FEE64 mezzanine with
1) adaptor PCB connected to ERNI input connector
2) test PCB to provide power & control to FEE64 mezzanine
plus probe points for (per ASIC) Data Ready, A0-A3, MUX output, 16x fast comparator, 16x buffered preamp output etc.
Attachments 1, 3 & 4 AIDA FEE64 power (middle & right) and fan power (left)
N.B.
Attachment 1 - mid-upper TTi QL355T FEE64 PSU shows nominal current load ( 5V/1.672A 7V/0.031A ) for configured ASICs
Attachment 5 - AIDA FEE64 mezzanines in T9 AIDA cupboard
left - 2x boxes with U/S FEE64 mezzanines (labelled)
right - 2x boxes with bench test OK FEE64 mezzanines
bottom - untested FEE64 mezzanines
Attachment 6 - AIDA FEE64 mezzanines to be re-tested
Summary of AIDA FEE64 mezzanine bench tests (see Mezzanine logbooks for details)
Garner Osborn Batch 7226-1
9 pass
11 pass
15 fail no signals?
16 fail power?
17 fail power?
19 pass
23 pass
24 fail asic#4
27 fail power?
30 fail power?
37 pass
39 pass
40 fail power?
Batch 0213110101
26 fail asic#2
27 fail asic#3
29 pass
Batch 0216240101
8 pass
It is possible that the mezzanines have dirty electrical contacts - they should be cleaned and re-tested |
863
|
Mon Apr 19 15:10:55 2021 |
OH TD | Less HEC events than expected in DSSD3 | we are noticing we appear to see less implant events in detector 3 than we expect. This was first noticed in the xy spectra of the DSSD in the Go4 online.
As part of testing we have lowered the threshold in aida09 which from the xy appeared to have less events.
Following this we still seemed to see less events.
OH downloaded a selection of recent files to analyse. Looking at the total number of HEC events it appears that aida09, aida10 and aida12 are all seeing less HEC events than I would expect.
The ratio of HEC events in aida09 to aida11 was 0.36.
Looking at the energies of the HEC events there appeared to be less events everywhere and not just a threshold issue. We thought it could then be radiation damage and poor
charge collection. To test this we raised the bias to 120V on DSSD3.
The same test was again performed and the ratio again came out to be 0.36
We did not appear to recover any HEC events
Comparing the scaled energy distributions of aida09 and aida11 we see no evidence of a different energy response other than an increase in lower energy events in aida09 due to the lower threshold
I now think it may be a hardware issue. Will look at the last file before the most recent powercycle.
Using TD's analyser program can confirm the rate between aida09 and aida11 before 08:30 this morning was ~1:1.
The problem seems to have appeared during the power cycles following this. |
862
|
Tue Feb 9 11:44:21 2021 |
OH, TD, CA, LS | 9th Feb GSI Dry run | Database file - 2019Dec19-16.19.51
Current threshold at 0x64
13:27 Recovered from power cycle
System wide checks all ok - Attachments 1-6
*NB* Synchronise the ASIC clocks doesn't work - Attachment 7
ASIC Control ok
FEE temperatures ok - Attachment 8
Bias and leakage currents ok - Attachment 9
New taper service menu - Attachment 10
Pulser peaks log plot - Attachments 11-12
1.8.L pulser peaks - Attachment 13-14
Waveform plots - Attachment 15-16
FEE7 we aren't seeing a HIT pattern but we are seeing ADC data items -> It was a corrupted options file
15:20 DAQ Crashed after enabling data transfer
Problem was not configuring the tapeserver correctly
Have recovered from this. There are now no histograms for FEE09
This is because the options file has been corrupted during startup.
From the statistics it appear we are still reading data on the FEE
Chosen to let the DAQ run in this state to test stability for the time being |
861
|
Thu Nov 14 07:57:46 2019 |
TD | AIDA moved from in-beam position at F11 |
To make room for the installation of an MR-TOF device at F11, AIDA and DTAS have been removed
from their in-beam position at F11.
The AIDA network and DTAS/BRIKEN optic fibre cables have been coiled and tied to the E17 stairwell
barrier. |
860
|
Fri Jun 21 09:57:15 2019 |
CG | B2F network cables | AIDA network cables in B2F disconnected, looped and cable tied to hand rail, out of the way.
Labelled AIDA1/AIDA2 according to which network switch they belong to. |
859
|
Fri Jun 21 01:08:35 2019 |
CA, CB | Friday 21 June | 09.08 all system wide checks okay *except* naida7 fails adc calibration
mismatch between sync pulses received from master and FEE64 - attachment 1
FEE64 temperatures ok - attachment 2
detector bias/leakage currents ok - attachment 3
leakage currents slightly ramping since last night
RH 50.7%, Temperature 22.2 deg, dew point 11.6 deg
09.30 AIDA powered off and now in safe state |
858
|
Thu Jun 20 07:42:54 2019 |
CA, TD | AIDA shutdown checklist | stop the daq
pause merger
stop TapeServer
housekeeping checks
bias off
individually turn power relays off
switch off 2x NIN bins, 1x fan tray
do not turn off clock!!
turn off aida circuits at power box (careful!)
turn chiller off - press and hold arrow button
front panel switch on chiller - off
wall 3 phase power - off
withdraw aida clear from DTAS - slowly!
return power tool, temperature probe and water container to corral
*if cables*
network cables - blue, disconnect at switch, reel up at stairwell
disconnect clock
aida plastic high voltage and signal
cables from root macb trigger and reset to DTAS
mains cables from mains box
then move aida! |
857
|
Thu Jun 20 07:35:46 2019 |
CA, TD | Bias & leakage current spreadsheet |
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343 |
856
|
Thu Jun 20 02:37:55 2019 |
CA, CB, TD, CG, DK | Thursday 20 June | 10.37 Post - beam, AIDA & DTAS run only
DTAS stop run 164
AIDA file R2_1012
10.54 DTAS start run 165
AIDA file R2_1015
DTAS begins calibration with 24Na source
11.06 DAQ continues running OK
All system wide checks ok *except* nnaida7 fails ADC calibration
FEE64 temperature OK - see attach 1
Good events rate OK - see attach 2
Leakage currents OK - see attach 3
Merger & Tape server OK - see 4 & 5
11.47 DTAS stop run 166
AIDA file R2_1022
12.03 DTAS start run 167
AIDA file R2_1025
Caesium measurement
13.18 DTAS stop run 169
AIDA file R2_1035
14.59 DTAS opens file run 172
AIDA file R2_1049
14.57 DAQ continues OK file RIBF147/R2_352
postrun background and gamma source tests
ASIC settings 2019Jun13-08.56.35
DSSSD#1 slow comparator 0x1d
DSSSD#2 slow comparator 0x8
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 25Hz range, variable min. c. 2.5Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
all system wide checks OK *except* nnaida7 fails ADC calibration
detector biases & leakage currents OK - see attachments 6 & 7
FEE64 temperatures OK - see attachment 8
good event statistics - OK - see attachment 9
11x <20k 22x < 50k 23x <100k
Merger - 1x Q 21 error see attachment 10
TapeServer OK - see attachment 11
p+n FEE64s 1.8.W spectra 20us FSR - attachment 12
n+n FEE64s 1.8.W spectra 20us FSR - attachment 13
1.8.L spectra - see attachments 14 & 15
nnaida1 78 ch FWHM, nnaida3 81 ch FWHM
1.8.H spectra - see attachments 16 & 17
FEE64 Rate spectra - attachment 18
Check ASIC Control x1
11.04 analysis of file RIBF147/R2_1051 - attachment 19
deadtime <<1% all FEE64s *except* nnaida19 ~2%
no timewarps
16.00 AIDA file R2_1058
DTAS sends sync pulse
DTAS having issues with DAQ speed
16.30 DTAS stop 175
AIDA file R2_1062
16.32 pulser walkthrough start
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 250Hz range, variable min. c. 25Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
90000 - 10000 in 10000 steps walkthrough file R3 - see attachments 20 & 21
12000 - 2000 in 2000 steps walkthrough file R5 - see attachments 22 & 24
ignore file R4
17.08 pulser walkthrough end
22.57 DAQ stop
AIDA file TapeData/RIBF147/R6_49
DTASD stop on run 191 |
855
|
Wed Jun 19 08:30:36 2019 |
CG | Wed Jun 19 16.00 - end of run | 16.10 DAQ continues as before.
Merger rate ~700k items/s and ~5.3Kb/s
Individual FEE rates remain roughly constant
Temps and bias ok.
17.33 DTAS run 149 stopped
DTAS run 150 started
BigRIPS run 2057
AIDA run ~1.3GB in R2_865
19.30 DTAS run 152 stopped
DTAS run 153 started
BigRIPS run 2058
AIDA run ~1.8GB in R2_884
Temps and bias ok.
Rates in merger, tape server and individual FEEs as before.
19.50 In looking at previous data, AIDA is seeing ~30% fewer implants that what is observed at F11Plastic
Beam spot is not central on AIDA and some ions will be lost over sides of DSSD, but does not look
like it would account for a ~30% reduction
AIDA implant profile shown in Attachment 1 - from file
merged_a2_687_708_br190618_2315_100Sn118_121bgrun2049_sw_Tsi.root
21.01 Beam stopped.
DTAS run 155 stopped.
AIDA file R2_899.
DTAS and AIDA will continue with background measurements.
21.04 DTAS run 156 started
AIDA run R2_899
Chiller is full.
Lead bricks upstream of moderator.
That's all folks. |
854
|
Tue Jun 18 23:58:46 2019 |
CB | Wed Jun 19 8:00-16:00 | 08:00 Shift change
No change in settings
DAQ continues running OK
Good events rate OK - see attach 1
FEE64 temperature OK - see attach 2
Merger & Tape server OK - see 3 & 4
Leakage currents OK - see attach 5
Online HEC xy plot OK, most implants in DSSD2 - see attach 6
Zeroed online histograms
09:29 DTAS DAQ stops on run 135
AIDA on run R2_787
09:32 DTAS DAQ restarts on run 136
AIDA on run R2_787
BigRIPS on run 2053
09:33 DAQ continues OK
Good events rate OK - see attach 7
Merger ~ 700k items/s
Tape ~ 5400 Kbytes/s
Leakage currents OK - see attach 8
Online HEC xy plot OK - see attach 9
10:31 Good event rate in nnaida 19, 24 steadily creeping up. See attach 10.
Currently 160k and 120k
Merger ~ 710 k items/s
Tape ~ 5689 kbytes/s
All system-wide checks OK, except nnaida7 fails ADC calibration as usual
11:20 Good event rate stable - see attach 11
FEE64 temperatures OK - see attach 12
Merger ~700k items/s
Tape server ~ 5500 Kbytes/s
Leakage currents OK - see attach 13 & 14
11:30 DTAS stops DAQ on run 139
BigRIPS on run 2053
AIDA on run R2_806
11:32 DTAS restarts on run 140
BigRIPS 2053
AIDA R2_807
13:14 DAQ continues OK
Good statistics events stable - see attach 15
Merger ~ 730k items/s
Tape server ~ 5500 KBytes/s
Leakage current OK - see attach 16
13:34 DTAS stops DAQ on AIDA R2_826
13:37 DTAS restarts DAQ on run 144
BigRIPS run 2055
AIDA run 827
15:10 DTAS DAQ reports 20% drop in F11 counting rate
AIDA plastic unchanged, beam current unchanged. Focusing issue?
Reset online histograms to check we are still implanting. We are.
Acquisition continues uninterrupted.
15:17 Good statistics OK - see attach 17
FEE64 temperature OK - see attach 18
Merger ~ 700k items/s
TapeServer ~ 5500 Kbytes/s
Detector leakage current OK - see attach 19
15:30 DTAS stops DAQ on AIDA run R2_845
15:33 DTAS restarts DAQ on run 147
BigRIPS run 2056
AIDA run R2_846
|
853
|
Tue Jun 18 16:14:03 2019 |
CA | Wednesday 19 June 00.00 - 08.00 shift | 00.00 Shift Change
DAQ continues ok
AIDA file RIBF147/R2_697
DTAS run 118
BigRips run 2048
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 25Hz range, variable min. c. 2.5Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
0.3mm Al degrader
00.15 System wide checks all ok *except* naida7 fails ADC calibration
00.19 FEE64 temperatures ok - attachment 1
good event statistics ok - attachment 2
detector bias/leakage currents ok - attachment 3
tape service ok - attachment 4
merger ok - attachment 5
01.19 DTAS stop/start (verified with DTAS2019 ELOG)
DTAS Stop: 01:19
DTAS run: 121
AIDA run: 708
BigRIPS run: 2049
DTAS Start: 01:19
DTAS run: 122
AIDA run: 708
BigRIPS run: 2049
01.46 Primary beam at 120 pnA; implants around 250 cps at F11
01.48 High Energy Spectra (1.8.H) for front and back strips, respectively (attachments 6 & 7)
02.35 HEC XY hit pattern - implants mostly in DSSD2 - attachment 8
HEC multiplicity n vs p - attachment 9
HEC Ey vs Ex - attachment 10
Implant - decay time vs Energy - attachment 11
02.46 zeroed all histograms, online sort stats zeroed
02.49 HEC XY hit pattern - ~3 minutes after zeroing - attachment 12
02.52 Primary beam at 120 pnA; implants around 250 cps at F11
03.20 analyser output file R2_726 - attachment 13
no timewarps
~1s deadtime on nnaida19
~0.8s deadtime on nnaida24
0s for rest
03.23 DTAS stop run 125
AIDA file R2_728
BigRIPS run 2049
DTAS start run 126
AIDA file R2_728
BigRIPS run 2050
03.28 Check ASIC control
04.16 HEC XY hit pattern - less implants than expected - attachment 14
HEC XY hit pattern - change refresh rate to 10s.... looks ok. Sorry Tom! - attachment 15
04.26 FEE64 temperatures ok - attachment 16
04.28 System wide checks all ok *except* naida7 fails ADC calibration
good event statistics ok - attachment 17
detector bias/leakage currents ok - attachment 18
merger & TapeServer ok - attachments 19 & 20
05.32 Primary beam at 120 pnA; implants around 250 cps at F11
05.36 DTAS stop run 129
AIDA file R2_749
BigRIPS run 2050
05.40 DTAS send sync pulse AIDA file R2_750
05.43 DTAS start run 130
AIDA file R2_751
BigRIPS run 2051
06.31 HEC XY hit pattern - implants mostly in DSSD2 - attachment 21
HEC multiplicity n vs p - attachment 22
HEC Ey vs Ex - attachment 23
Implant - decay time vs Energy - attachment 24
06.34 High Energy Spectra (1.8.H) for front and back strips, respectively (attachments 25 & 26)
06.36 3.20 analyser output file R2_731 - attachment 27
no timewarps
~1.7s deadtime on nnaida19
~0.8s deadtime on nnaida24
0s for rest
07.19 System wide checks all ok *except* naida7 fails ADC calibration
good event statistics ok - attachment 28
FEE64 temperatures ok - attachment 29
detector bias/leakage currents ok - attachment 30
07.21 Merger & TapeServer ok - attachments 31 & 32
07.30 DTAS stop run 132
AIDA file R2_768
BigRIPS run 2051
DTAS start run 133
AIDA file R2_768
BigRIPS run 2052
|
852
|
Tue Jun 18 08:03:20 2019 |
DK | Tuesday 18 June 16:00 - 24:00 | Shift change
16:00
115 pnA primary, 290 cps implants at F11
Presently at AIDA R2_616
DAQ is running smoothly - passes all system checks (except ADC calib of nnaida7)
Stats okay, though nnaida19 and 24 running a bit high (seems consistent w/ previous shift) - attach 1
(Consistent with lower thresholds, pasted below)
100Sn setting, 0.3mm Al degrader
ASIC settings 2019Jun13-08.56.35
DSSSD#1 slow comparator 0xa -> 0x1d
DSSSD#2 slow comparator 0xa -> 0x8
DSSSD#3 slow comparator 0x8 -> 0xa
Biases fine - attach 2
Merger okay - attach 3
TapeServer okay - attach 4
16:13 New DTAS run 105
AIDA R2_618
BigRIPS is still 2044 as at 15:03
Temperatures okay - attach 5
16:20 Implant spectra look good, mainly into DSSSD2 - attach 6
Spectra saved in ~spectra/specs-2019Jun18-16.24.33
16:30 Zero stats, histograms
17:03 Old runs ending
AIDA R2_626
In principle DTAS 106 but it switches quickly to 107
BigRIPS 2045
17:10 New run DTAS 108, AIDA R2_627
18:09 New implant profile - attach 6
New stats - attach 7
Looks okay
19:08 AIDA R2_647, DTAS 110
19:14 AIDA R2_648, DTAS 111, BigRIPS 2046
20:08 XY implants - attach 8
Bias - attach 9
Merger - attach 10
TapeServer - attach 11
Stats - attach 12
21:15 New runs: BigRIPS 2047, DTAS 115, AIDA R2_668
22:37 XY - attached 13; stats - attached 14
Primary beam at 120 pnA; implants around 250 cps at F11
23:14 DTAS closes the run
23:20 New runs: AIDA R2_688, DTAS 118, BigRIPS 2048 |
851
|
Mon Jun 17 16:01:27 2019 |
CB, CG, OH, TD | Tuesday 18 June 00:00 - 16:00 | 00:00 New day. The DAQ continues OK
Beam setting 2 for enhanced yield of Sn100
No degrader
Statistics OK - see attach 1
FEE64 temps OK - see attach 2
Merger & Tape server OK - see attach 3 & 4
Bias OK - see attach 5
All system-wide checks OK, except nnaida7 fails ADC calibration
00:19 AIDA R2_473
DTAS 82
BigRIPS 2036
01:50 FEE temps and bias/leakage currents OK
Data rate continues at ~620k items/s and ~5.1MB/s
ASIC check performed successfully
02:29 DTAS run 85
BigRIPS run 2037
AIDA ~1.5GB into R2_492
02:30 DTAS reset correlation scaler at start of R2_493
Confirmed by change in value in Correlation status & control @ aidas1 window.
02:36 DTAS run 86 started
BigRIPS run 2038
AIDA file R2_494
04:38 DTAS run 88 stopped. AIDA run R2_512.
DTAS run 89 started.
BigRIPS run 2039
AIDA run R2_512 (1.8GB)
Temps + bias/leakage currents still ok
Data rate still ~600k items/s and ~5MB/s
Individual Good data rates remain roughly constant (see attachment 6)
All system-wide checks passed, except nnaida7 fails ADC calibration
05:48 Stats and histograms zeroed
06:28 DTAS run 91 stopped. AIDA run R2_528 at the time.
DTAS run 92 started
BigRIPS run 2040
AIDA run R2_528
07:50 Made some basic observations with the first file merged after the setting change
Attachment 7 shows implant x:y plots for each DSSD
Attachment 8 show PID for second setting with 100Sn highlighted in red and 96Ag in magenta
08:21 PID per DSSD Attachment 9
Sn100 per DSSD attachment 10
Sn100 Velocity against DSSD 11
Sn100 Velocity against DSSD Energy attachment 12
08:29 DTAS and BigRIPS stop
AIDA on file R2_546
DTAS starts file 95
BigRIPS run 2041
AIDA on file R2_547
08:53 Stats ok - attachment 13
Temps ok - attachment 14
System wide checks ok
ASIC check ok
Bias and leakage still ok though DSSD3 continues to rise - attachment 15
Merger continues with data rate around 700k - attachment 16
09:43 With the new implantation profile depositing most of the Sn100 in DSSD2 but some in the 3rd the
plan is to put in place a 200 micron degrader to bring the deposition into the centre of detector
2
10:15 Overnight MIDAS analysis has been completed.
Spectra have been exported to: /homes/npg/spectra/specs-2019Jun18-10.14.36
MIDAS will be switched to online mode with the change in degrader setting
10.33 DAQ stop
AIDA file RIBF147/R2_566
OH/AA/SN add 0.3mm Al degrader to Pb wall immediately upstream of the (CH2)n shield
10.35 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
Water level c. 50% M-H markers
Temperature +24.1 deg C dew point +9.7 deg C RH 39.8%
10.39 DTAS starts file 98
BigRIPS run 2042
AIDA on file R2_567
11:06 Implantation events for the 2nd setting with 0,3mm Al plate - attachments 17-19
FEE64 Rate spectra - attachment 20
FEE64 HitRate spectra - attachment 21
1.8.L spectra - see attachments 22-25
nnaida1 73 ch FWHM, nnaida3 77 ch FWHM - cf. 73 & 78 ch FWHM respectively 10.41 yesterday
1.8.H spectra - see attcahments 26-27
p+n FEE64s 1.8.W spectra 20us FSR - attachment 28
n+n FEE64s 1.8.W spectra 20us FSR - attachment 29
11.30 Check ASIC Control *all* FEE64s & ASICs
zero *all* histograms
zero DAQ stats
11.50 analysis of RIBF147/R2_576
deadtime *all* FEE64s <<1%
no timewarps
11.57 ADC data synchronised - attachment 30
per FEE64 ADC data / 20.48us - attachment 31
12:39 DTAS and BigRIPS stop runs
AIDA on file R2_585
DTAS file 101
BigRIPS run 2043
AIDA on File R2_585
13:23 System wide checks ok
14:38 DTAS and BigRIPS stop runs
AIDA on file R2_683
OH offline analysis of BigRIPS-implant correlations for previous 2h indicates >90% of 100Sn are
now in DSSSD#2 with small d=fraction remaining in DSSSD#3
100Sn setting, 0.3mm Al degrader
ASIC settings 2019Jun13-08.56.35
DSSSD#1 slow comparator 0xa -> 0x1d
DSSSD#2 slow comparator 0xa -> 0x8
DSSSD#3 slow comparator 0x8 -> 0xa
DAQ stats before & after chn age of slow comparator thresholds above - see attachments 33 & 34
before 11x <20k 21x <50k 24x <100k cf after 11x <20k 22x <50k 23x <100k
merger 664k items/s cf 560k data items/s
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 25Hz range, variable min. c. 2.5Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
15.03 DAQ start
AIDA file R2_606
DTAS file 104
BigRIPS run 2044
|
850
|
Mon Jun 17 08:03:37 2019 |
CA, CB, TD, OH | Mon Jun 17 16:00-24:00 | 16:04 DAQ continues running OK
All system-wide checks OK except nnaida7 ADC calibration fails
FEE64 temperatures OK - attach 1
Merger and Tape Server OK - see attach 2 & 3
16:30 DTAS and BigRIPS stop
AIDA on file R2_406
16:35 Beam stop.
AIDA plastic gain increased by a factor 2
Moved the lead bricks between AIDA and F11, 1 cm further away to the sides
Chiller water level OK
Humidity 34.6%
Temperature 23.4 C
Dew point 7.1 C
16:40 Beam restart
AIDA run R2_408
DTAS 70 (from DTAS ELOG)
BigRIPS 2030 (from DTAS ELOG)
No obvious changes to the implantation pattern. May need more stats.
Detector leakage current OK - see attach 4
17.31 nnaida14 3.*.H & 4.*.H spectra - attachments 5 & 6
Corresponds to RHS DSSSD#3 - decrease in rate observed but no evidence of systematic variation of HEC energy
Modified implantdecay4.f to select events with x & y energy > ADC ch 1600 (c. 1MeV) to observe x-y hit pattern
of light particles - see attachments 7 & 8
Low stats but light particle distribution appears to be symmetric with no obvious RHS cut
17:37 DTAS & BigRIPS DAQ stop
Beam stop
Lead moved back as before
AIDA plastic gain decreased by a factor 5
17:40 DTAS and BigRIPS stop
AIDA on file R2_416
17.48 zero *all* SortSas spectra
17:50 Beam restarting
AIDA R2_418
DTAS 73 (72 is a mistake - ignore)
BigRIPS 2031
18:43 DAQ continues OK
All system wide checks OK - except nnaida7 fails ADC calibration as usual
FEE64 temperature OK - see attach 9
Stats OK - see attach 10
Merger & Tape Server OK - see attach 11 & 12
Leakage currents OK - see attach 13
HEC & LEC events plots attached - attach 14 & 15 - note LEC in DSSD#3 are > 3 MeV only (light particle-like)
18:50 AIDA R2_427
DTAS 74
BigRIPS 2031
19.08 DTAS & BigRIPS DAQ stop - beam lost
AIDA file R2_429
21:15 Beam is back - briefly
AIDA R2_446
21:17 Beam lost - operators advise "this will take a long time"
22:16 Beam is back!
AIDA R2_454
DTAS 78
BigRIPS 2034
Statistics OK - attach 15
FEE64 temperatures OK - attach 16
Merger & Tape Server OK - see attach 17 & 18
System-wide checks as usual
DTAS reports rate in F11 down by 20%, and rate in AIDA plastic sees similar drop. |
849
|
Mon Jun 17 03:01:04 2019 |
CA, TD, OH | PID plot and selected isotope implantation rates | PID plot produced from 2 hours of merged data - attachment 1
Z on y-axis, A/Q on x-axis
numbers estimated by gating on each isotope and integrating
94Ag - 10584 events in 2hrs
97In - 42 events in 2 hrs
100Sn - 56 events in 2 hrs
94Pd - 383030 events in 2 hrs |
848
|
Mon Jun 17 02:31:53 2019 |
CA, TD, OH | Monday 17 June 08.00-16.00 | 10.41 DAQ continues OK file RIBF147/R2_352
100Sn setting, no degrader
ASIC settings 2019Jun13-08.56.35
DSSSD#1 slow comparator 0xa -> 0x1d
DSSSD#3 slow comparator 0xa -> 0x8
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 25Hz range, variable min. c. 2.5Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
all system wide checks OK *except* nnaida7 fails ADC calibration
detector biases & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
good event statistics - OK - see attachment 4
11x <20k 21x < 50k 24x <100k
Merger OK - see attachment 5
TapeServer OK - see attachment 6
p+n FEE64s 1.8.W spectra 20us FSR - attachment 7
n+n FEE64s 1.8.W spectra 20us FSR - attachment 8
1.8.L spectra - see attachments 9 & 10
nnaida1 73 ch FWHM, nnaida3 78 ch FWHM
FEE64 Rate spectra - attachment 11
Note high rate issues observed for *some* strips in nnaida14 ASIC #3 & #4 fixed (temporarily) by Check
ASIC Control
FEE64 Rate spectra - attachment 12
10.58 ADC data synchronised - attachment 13
Online MIDASsort spectra - attachments 14-18
11.04 analysis of file RIBF147/R2_353 - attachment 19
deadtime <<1% *all* FEE64s
no timewarps
11.12 HitRate spectra - attachment 20
disable nnaida14 *hot* channels 29, 30 & 35
11.15 zero all histograms
zero DAQ stats
12.31 DTAS and BigRIPS stop
AIDA on file R2_368
DTAS starts file 63
BigRIPS run 2025
AIDA file R2_368
13:08 R2_374
The putty window for USB2 had frozen with a 1 in the voltage set as shown in attachment 1
The window was no longer updating.
When regaining the window the voltage limit was applied and the detector
began to ramp down
The set voltage was reset to 100V and bias was regained.
Total time with less than 100V was around 30sec
14:28 DTAS and BigRIPS stop
AIDA on run R2_386
DTAS Starts file 66
BigRIPS run 2026
AIDA on file R2_387
14:32 Bias and leakage currents ok - attachment 21
15:07 Rate spectra showing no spikes in DSSD 3
System wide checks
15:08 DTAS and BigRIPS stop
AIDA onfile R2_393
BigRIPS chaning slit positions
14:14 DTAS starts file:
AIDA on file R2_394
BigRIPS file 2027 (In control by bigRIPS)
15.30 TAS and BigRIPS stop
AIDA onfile R2_396 |
847
|
Sun Jun 16 16:00:58 2019 |
ML, CG, OH | Monday 17 June 2019 | It's a new day, it's a new log entry !!
01:25 DTAS run 46 started
BigRIPS run 2019
AIDA run R2_268
DAQ running smoothly
No change in Stat and Rate (stat zeroed at the beginning of this DTAS run)- See attachment 1
Merger rate: 630k item/sec - See Attachment 2
TapeServer rate still ~5 Mbytes/sec - See attachment 3
Temperature and HV ok - See attachment 5 & 6
System-wide checks OK except nnaida7 fails ADC calibration as usual.
!!!
Victor said that the run AIDA R2_249 is missing in the correlation merge data. This is the run when the
correlation scaler was reset (as DTAS was running out of range in some of their timing histograms) (See
elog end of Sunday)
!!!
02:23 Rate in DSSD#3 card 9 and 12 slowly reaching 100kHz while 14 and 15 ~ 50kHz. See attachment 7
TapeServer rate ~ 5.5 kHz
03:25 Change of DTAS run:
DTAS run 49 started
BigRIPS run 2020
AIDA run R2_286
Experiment still running smoothly. No significant change since last comments 2h ago.
Leakage current in detector 3 is increasing slowly see attachment 8 & 9
05:25 Change of DTAS run:
Note: DTAS run stopped during AIDA R2_305 and re-started during R2_306.
DTAS run 52 started
BigRIPS run 2021
AIDA run R2_306
Pretty quiet night shift.
Stat & Rate in attachment 10 - DSSD#3 FEE card 9 back down to 60kHz
Merger rate: 650k item/sec - See attachment 11
TapeServer rate still ~5.1 Mbytes/sec - See attachment 12
System-wide checks OK except nnaida7 fails ADC calibration as usual.
X vs Y HEC spectrum in attachment 13
LEC E vs HEC-LEC spectrum in attachment 14
Both spectra zeroed
Bias in attachment 15
Temperature unchanged
07:30 DTAS and BigRIPS stop runs
AIDA on file R2_323
07:33 New Run numbers
DTAS Run: 55
BigRIPS Run: 2022
AIDA on File: R2_324
07:56 System wide checks ok
Fee temps ok - attachment 16
100Sn setting, no degrader
ASIC settings 2019Jun13-08.56.35
BNC PB-4 Pulser
Amplitude 90,000
x5 attenuator IN
Frequency 25Hz range, variable min. c. 2.5Hz
t_r 100ns, tau_d 50us
- polarity
Delay MIN, tail pulse
08:28 Bias and leakage ok - attachment 17
08:48 ASIC check successful
09:32 DTAS and BigRIPS stop
AIDA on file R2_342
DTAS starts file 58
BigRIPS run 2023
AIDA still on file R2_342 |
|