AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 5 of 44  ELOG logo
Entry  Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg
Carried out some further work on failed mezzanine modules.

Inspected them externally and removed the copper block, internally with a bench microscope.

Found two obvious faults ..... broken components with scrambled pcb tracks.
Entry  Thu Feb 23 16:15:31 2023, TD PJCS, Bench test of AIDA FEE64 mezzanines 7x

Attachments 2 & 7 AIDA FEE64 mezzanine with
                  1) adaptor PCB connected to ERNI input connector
Entry  Mon Apr 19 15:10:55 2021, OH TD, Less HEC events than expected in DSSD3 Capture.PNG
we are noticing we appear to see less implant events in detector 3 than we expect. This was first noticed in the xy spectra of the DSSD in the Go4 online.
As part of testing we have lowered the threshold in aida09 which from the xy appeared to have less events.
Entry  Tue Feb 9 11:44:21 2021, OH, TD, CA, LS, 9th Feb GSI Dry run 16x
Database file - 2019Dec19-16.19.51
Current threshold at 0x64
Entry  Thu Nov 14 07:57:46 2019, TD, AIDA moved from in-beam position at F11 

To make room for the installation of an MR-TOF device at F11, AIDA and DTAS have been removed 
from their in-beam position at F11.
Entry  Fri Jun 21 09:57:15 2019, CG, B2F network cables 
AIDA network cables in B2F disconnected, looped and cable tied to hand rail, out of the way.

Labelled AIDA1/AIDA2 according to which network switch they belong to.
Entry  Fri Jun 21 01:08:35 2019, CA, CB, Friday 21 June 21junSync.png20june_2319_temps.png21jun_bias.png
09.08 all system wide checks okay *except* naida7 fails adc calibration
      mismatch between sync pulses received from master and FEE64 - attachment 1
Entry  Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist 
stop the daq

pause merger
Entry  Thu Jun 20 07:35:46 2019, CA, TD, Bias & leakage current spreadsheet AIDA_leakage_current(1).xlsx

https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=1560332343
Entry  Thu Jun 20 02:37:55 2019, CA, CB, TD, CG, DK, Thursday 20 June 23x
10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
Entry  Wed Jun 19 08:30:36 2019, CG, Wed Jun 19 16.00 - end of run AIDAimplants.png
16.10 DAQ continues as before.
      Merger rate ~700k items/s and ~5.3Kb/s
      Individual FEE rates remain roughly constant
Entry  Tue Jun 18 23:58:46 2019, CB, Wed Jun 19 8:00-16:00  19x
08:00 Shift change
      No change in settings
Entry  Tue Jun 18 16:14:03 2019, CA, Wednesday 19 June 00.00 - 08.00 shift 32x
00.00 Shift Change

      DAQ continues ok 
Entry  Tue Jun 18 08:03:20 2019, DK, Tuesday 18 June 16:00 - 24:00 15x
Shift change

16:00 
Entry  Mon Jun 17 16:01:27 2019, CB, CG, OH, TD, Tuesday 18 June 00:00 - 16:00 34x
00:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of Sn100
Entry  Mon Jun 17 08:03:37 2019, CA, CB, TD, OH, Mon Jun 17 16:00-24:00 19x
16:04  DAQ continues running OK
       All system-wide checks OK except nnaida7 ADC calibration fails
       FEE64 temperatures OK - attach 1
Entry  Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates 2hrPID.pdf
PID plot produced from 2 hours of merged data - attachment 1

Z on y-axis, A/Q on x-axis
Entry  Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
10.41 DAQ continues OK file RIBF147/R2_352

      100Sn setting, no degrader
Entry  Sun Jun 16 16:00:58 2019, ML, CG, OH, Monday 17 June 2019 17x
It's a new day, it's a new log entry !!

01:25 DTAS run 46 started
Entry  Sun Jun 16 10:06:21 2019, TD, CG, FEE64 nnaida14 noise issues 16x

Attachments 1, 3, 5 & 7 *.L spectra log scale
ELOG V3.1.4-unknown