AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 5 of 46  ELOG logo
Entry  Wed Jun 7 00:10:24 2017, NN, TD, Wednesday 7 June 08:00 - 16:00 30x
08:12    Analysis of file RIBF128/R6_438 - zero timewarps, four MBS timewarps - see attachment 1

08:23    Online analysis (per DSSSD rates) of R6_443,  see attachment 2
Entry  Tue May 5 16:40:23 2015, JA, TD, AE, CG & JLT, Wednesday 6 May 2015 140.png
00.00 Degrader changed to 4mm + some of variable (need to confirm)
      Extra 1mm removed.
Entry  Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
Entry  Wed Jun 5 06:57:38 2019, TD, Wednesday 5 June 13x
14.50 DAQ continues OK

      ASIC settings 2019May19-17.54.03
Entry  Wed May 4 03:01:15 2016, TD, Wednesday 4 May 2016 11x

10.30 Power up.
Normal DAQ startup.
Entry  Wed Oct 31 00:18:12 2018, TD, OH, CA, Wednesday 31 October 20x
09.18 DAQ continues OK - current file Oct18/R10_7
      alpha background run
Entry  Wed May 31 08:00:26 2017, NN, CB, Wednesday 31 May 16:00 - 24:00 15x
16:30  Check online data ok (R1_533) see attachment 1

16:39  BigRips and BRIKEN stop their runs
Entry  Wed May 31 00:02:41 2017, VP, CB, Wednesday 31 May 08:00 - 16:00 10x
08:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
Entry  Tue May 30 16:05:12 2017, OH, Wednesday 31 May 00:00 - 08:00 9x
00:05 BigRIPS and BRIKEN stop their daqs
      AIDA currently on file R1_312
Entry  Tue Nov 29 15:12:33 2016, CG, AE, TD, DK, Wednesday 30 November 13x
00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
Entry  Wed Oct 3 01:48:21 2018, OH, TD, Wednesday 3 October 30x
09.42 DAQ continues OK - current file Sep18/R2_36

09.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Wed May 29 06:11:34 2019, TD, Wednesday 29 May 12x
14.10 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 75% M-H markers
      Temperature +25.7 deg C dew point +8.2 deg C RH 32.4%
Entry  Wed Mar 29 00:02:49 2017, TD, Wednesday 29 March 21x
08.02 DAQ halted overnight

      System checks OK *except* for nnaida1 global clocks error 6 and some SYNC errors - see attachments 1-5
Entry  Wed Apr 29 11:00:29 2015, TD, Wednesday 29 April 2015 - R20 screenshots 10x
1230: Attachments 

19.00 Screenshots taken during R20
Entry  Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
Overnight
      Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks 
      DAQ ran OK (not to disk)
Entry  Wed Sep 28 06:40:40 2016, TD & CG, Wednesday 28 September 1.png2.png3.png4.png
14.40 AIDA power up

      Julabo FL11006 set point +20 deg C
Entry  Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 11.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
Entry  Wed Jun 27 02:23:03 2018, OH, Wednesday 26 June 180628_1023_Bias.png180628_1023_Bias.png180626_1527_feetemps.png
10:20 Bias and leakage currents ok - attachment 1
      FEE temperatures ok
      System wide checks all ok
Entry  Wed Oct 25 03:26:55 2017, TD, OH, Wednesday 25 October 7x
11.27 DAQ continues
      Not writing to disk
Entry  Wed May 25 02:10:51 2016, TD, CG, Wednesday 25 May 2016 50.png51.png60.png
10.05 Recirculating chiller on
      FEE power on
      Detector bias on - ambient temp +23 deg  C - see attachments 1-2
ELOG V3.1.3-7933898