Wed Jun 7 00:10:24 2017, NN, TD, Wednesday 7 June 08:00 - 16:00 30x
|
08:12 Analysis of file RIBF128/R6_438 - zero timewarps, four MBS timewarps - see attachment 1
08:23 Online analysis (per DSSSD rates) of R6_443, see attachment 2
|
Tue May 5 16:40:23 2015, JA, TD, AE, CG & JLT, Wednesday 6 May 2015
|
00.00 Degrader changed to 4mm + some of variable (need to confirm)
Extra 1mm removed.
|
Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
|
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
up-down AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
|
Wed Jun 5 06:57:38 2019, TD, Wednesday 5 June 13x
|
14.50 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
Wed May 4 03:01:15 2016, TD, Wednesday 4 May 2016 11x
|
10.30 Power up.
Normal DAQ startup.
|
Wed Oct 31 00:18:12 2018, TD, OH, CA, Wednesday 31 October 20x
|
09.18 DAQ continues OK - current file Oct18/R10_7
alpha background run
|
Wed May 31 08:00:26 2017, NN, CB, Wednesday 31 May 16:00 - 24:00 15x
|
16:30 Check online data ok (R1_533) see attachment 1
16:39 BigRips and BRIKEN stop their runs
|
Wed May 31 00:02:41 2017, VP, CB, Wednesday 31 May 08:00 - 16:00 10x
|
08:02 BRIKEN starts run 1032
BigRIPS starts run 31
AIDA on file R1_423
|
Tue May 30 16:05:12 2017, OH, Wednesday 31 May 00:00 - 08:00 9x
|
00:05 BigRIPS and BRIKEN stop their daqs
AIDA currently on file R1_312
|
Tue Nov 29 15:12:33 2016, CG, AE, TD, DK, Wednesday 30 November 13x
|
00.11 Beam stopped for target @F8 change.
R35 stopped at R35_62.
BRIKEN file 161129_1951 155->159
|
Wed Oct 3 01:48:21 2018, OH, TD, Wednesday 3 October 30x
|
09.42 DAQ continues OK - current file Sep18/R2_36
09.42 all system wide checks OK *except* nnaida7 fails ADC calibration
|
Wed May 29 06:11:34 2019, TD, Wednesday 29 May 12x
|
14.10 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
Water level c. 75% M-H markers
Temperature +25.7 deg C dew point +8.2 deg C RH 32.4%
|
Wed Mar 29 00:02:49 2017, TD, Wednesday 29 March 21x
|
08.02 DAQ halted overnight
System checks OK *except* for nnaida1 global clocks error 6 and some SYNC errors - see attachments 1-5
|
Wed Apr 29 11:00:29 2015, TD, Wednesday 29 April 2015 - R20 screenshots 10x
|
1230: Attachments
19.00 Screenshots taken during R20 |
Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
|
Overnight
Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks
DAQ ran OK (not to disk)
|
Wed Sep 28 06:40:40 2016, TD & CG, Wednesday 28 September   
|
14.40 AIDA power up
Julabo FL11006 set point +20 deg C
|
Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
|
Wed Jun 27 02:23:03 2018, OH, Wednesday 26 June  
|
10:20 Bias and leakage currents ok - attachment 1
FEE temperatures ok
System wide checks all ok
|
Wed Oct 25 03:26:55 2017, TD, OH, Wednesday 25 October 7x
|
11.27 DAQ continues
Not writing to disk
|
Wed May 25 02:10:51 2016, TD, CG, Wednesday 25 May 2016  
|
10.05 Recirculating chiller on
FEE power on
Detector bias on - ambient temp +23 deg C - see attachments 1-2
|